On the first day of work, Zhao Ping received two iron shovels.

West Bridge issued one, and Hexi issued another.

Neither side's tallyman was mistaken. On West Bridge's roster, Zhao Ping was born in West Bridge, and his name was marked as eligible for heavy labor; on Hexi's roster, he lived with his wife in the alley behind the Smelting Shed, so he was indeed supposed to report for work from Hexi.

The same person had been counted once by each side.

Zhao Ping stood in the mud, planted both shovels into the ground, and asked, "Which side do I work for first?"

Lu Heng didn't choose for him, only telling the tallymen from both sides to bring their rosters. The West Bridge roster was arranged by birth household, while the Hexi roster was arranged by current residence. Both registers were legitimate, yet neither had a column stating where he ate each day or from where he reported for work.

"Count him under Hexi for today." Lu Heng took down a palm-sized white wooden tally from the ledger board. On the front was written Zhao Ping, and on the back was written Hexi Smelting Shed Back Alley. A hole was drilled at the bottom, threading it into that day's labor cord. "Cross out the West Bridge entry with a red line—do not erase the characters."

The West Bridge tallyman was displeased: "He was born in our village! He even comes back to offer sacrifices to his ancestors during festivals."

"Offering sacrifices doesn't mean he can contribute two men's worth of strength today."

Lu Heng took back the extra shovel and established two types of tallies on the spot. Person tallies used square wood and applied only to a single individual; cart tallies used long bamboo and applied only to a single cart. For every bridge crossed and every labor shift performed, a separate small token for the day was hung rather than repeatedly adding village names to the original tally. Changes of residence due to marriage, temporary stays, and short-term apprenticeships would not alter names, only the current permanent residence.

The issue with the green-canopied carts was even more troublesome.

Two households from North Gully both claimed that a cart belonged to them. One household produced the wooden deed from when the cart was bought, while the other brought out the repair ledger from when the iron hoop on the left wheel was replaced the previous year. When Lu Heng investigated down to the bottom of it, he discovered that the old cart on the wooden deed had long since fallen apart; its frame had been sold to the second household, but its canopy had been removed by the first household and mounted onto their own new cart. Both carts were called green-canopied carts, and both had their left wheel's iron hoop repaired.

He simply stopped identifying carts by color, having carpenters carve a short serial number on the inner side of the axle. The cart tally would only record the axle number, regular user, and current parking location. Changing a cart's canopy would not change its number; if an entire axle was replaced, the old number would be struck into the discard ledger, and a new tally would be issued.

Before the day was even over, the three villages had struck seventeen duplicate corvée labor entries, nine duplicate cart trips, and uncovered six households that had not been recorded by either side.

The under-levied labor was recovered, and those excessively levied could return to their own work. The silt at the bridge footing, originally expected to take until the following afternoon to clear, revealed the base of the pilings that very evening.

New troubles also surfaced along with it.

Among the six omitted households were two Mountain Gate disciples.

They were born in Hexi and currently resided in the Mountain Gate disciple quarters. Hexi assumed the Mountain Gate had its own corvée assignments for them, while the Mountain Gate believed they had already transferred out of the village registers. Neither had received a Hexi person tally, nor had they appeared on the labor roster submitted by the Mountain Gate.

Hexi's bookkeeper immediately demanded that the Mountain Gate hand over their complete disciple register.

"disciples eat grain, cross bridges, and go to the Medicine Shed—they cannot simply vanish from the registers the moment they enter the Mountain Gate."

What Lin Xuanji brought was a slim, sealed-edge booklet that listed only names and whether they were currently on the mountain, with no mention of Realm, Cultivation Technique, lineage, or course placement.

Hexi's bookkeeper flipped through two pages: "Who can dive into the water, who can only transcribe ledgers, who is injured—none of this is on here. What use is just a string of names?"

"You won't get the complete disciple register either," Lin Xuanji said. "That contains Cultivation Technique versions, trial-and-error placements, injury details, and instructor affiliations. The village can ask who is available for labor to repair the bridge, but you cannot use bridge repairs as an excuse to copy the Mountain Gate's master records."

Someone from West Bridge sneered, "If you won't let us see, who knows if you're listing all your able-bodied labor as being in seclusion?"

A Mountain Gate disciple countered, "If the village learns our Realms and injuries, will you deliberately pick Cultivators to dive into the water next time?"

As the voices on both sides grew louder, Lu Heng did not join the dispute. He flipped Zhao Ping's person tally to the back and stared at the column for current residence.

Ji Chuan pulled out four blank pages from an old ledger nearby.

"There are only four items needed for bridge repair," he said. "Name, current residence, eligible public roles, and whether they are currently suspended due to injury."

Hexi's bookkeeper asked, "Without writing down their Realm, how do we know how strong they are?"

"List their roles," Ji Chuan said. "Can dive, can handle heavy loads, can keep accounts, can do night patrols—verified according to reality. Qi Refining does not mean one knows how to drive pilings, and an ordinary carpenter does not have fewer hands than a Cultivator."

"What about Cultivation Techniques?"

"Do not write them."

"Lineage?"

"Do not write it."

"Where the injury is?"

"Only note suspended from heavy loads, suspended from diving, or fully suspended; do not include an injury report. When arrangements from the Medicine Shed are required, the individual and the Medicine Shed will issue a separate form according to the original handover rules."

After reviewing the four columns, Lin Xuanji slit open the sealed edge of the slim booklet, transcribing only the names of those currently residing at the Mountain Gate, their eligible roles, and their injury suspension status. The village registers followed suit—family assets, marriage contracts, and past disputes remained in their respective hands, with only those four columns submitted to the bridge.

That evening, the three villages compiled a limited roster together for the first time.

Of the two omitted Mountain Gate disciples, one could keep accounts and keep night watch, while the other had a right knee injury and could neither dive nor carry heavy loads. Lu Heng assigned the former to watch materials at night, and exempted the latter from labor, merely hanging a seven-day injury suspension tag behind his name. West Bridge wanted to levy him again based on his birth household, but was turned back directly by his person tally.

Once the roster was unified, work by the bridge began to speed up.

In the past, assigning work only depended on age and build. With the new roster, three young men from West Bridge who could swim but knew nothing of mortise-and-tenon joinery were transferred from the piling team to hold safety ropes; two elder carpenters from Hexi stayed ashore to align tenons instead of wading into the water with the strong laborers. A North Gully raftman had just sprained his wrist, but the village register still marked him for heavy labor; after his injury suspension tag was hung, Lu Heng moved him to recording the timing of timber releases.

That afternoon, Hexi's piling team was down to two men. Under the old method, someone would have been called at random from the riverbank, but the limited roster indicated that a porter delivering medicine carts from Main Village knew how to operate a winch, and had no other public duty that day. Main Village first endorsed a temporary permit on the task board before that porter was tied into the work cord. After completing a half-day's work, his person tally returned to Main Village without him being added to Hexi's residence register.

Who lived where, who could do what, and who could not do what today was recorded on the same mutually verifiable paper for the first time.

On the second day, Hexi carpenters drove new pilings, West Bridge cleared the bridge footings, and North Gully halted two rounds of timber rafts and delivered cedar logs of matching dimensions. On the third day, during the crossbeam replacement, Xu He only used a half-quarter-hour diversion line once to pull the piling inspectors back from the rushing waters, without using a Formation to lift the beam. The heavy beam was guided into its mortise using rollers, winches, and twelve laborers working together.

On the fourth day, Cross-River Bridge reopened for single-file pedestrian traffic.

Lu Heng did not remove the barricades immediately; he first permitted medicine boxes and stretchers, then empty carts. Heavily laden grain carts had to wait until the decking was laid and would be tested one by one according to axle numbers. The green-canopied cart with the repaired iron hoop on its left wheel was the first across the bridge, and West Bridge, Hexi, and North Gully finally recorded only a single entry in their ledgers.

Originally, only this one bridge was scheduled to be repaired within the seven days, but on the evening of the fourth day, two more emergency hazard tablets arrived.

One came from the North Gully timber sluice. The short bridge there had cracked under the weight of people mooring rafts for days; if it deteriorated further, lumber would have to be carried down into the water from the steep slope. The other came from the Shallow Ditch Bridge outside East Village's Medicine Shed, where detoured medicine carts had loosened the bridge deck, leaving two old planks warped.

Lu Heng did not use the existing seven-day tablet to reassign workers to those two sites. He had North Gully and East Village each specify the bridge name, the villages using it, the materials available, and the permitted scope of dispatch, before stringing a new cord for each. Because Main Village frequently used the Medicine Shed bridge, it also provided a village tablet restricted solely to the Shallow Ditch Bridge.

One set of tablets per bridge, one ledger per labor site.

No tablet could reach across to govern a third bridge, yet the limited roster and the person and cart tallies could be shared. Two winches unused at the Cross-River Bridge in the morning were sent to North Gully in the afternoon; East Village's Medicine Shed bridge only needed plank replacement without levying a separate heavy-labor team; people previously counted twice by both sides would not appear three times across three work sheets.

By the evening of the sixth day, the abutments of North Gully's short bridge were replaced. Before noon on the seventh day, the last new plank was laid on East Village's Shallow Ditch Bridge.

The heavy cart load test on Cross-River Bridge was completed in the afternoon.

The three villages had initially estimated that the damages across the three bridges would require a total of one hundred and forty full shifts and fifty logs of various sizes. The final settlement tablet showed ninety-eight full shifts and thirty-five logs. Duplicate labor calls, duplicate sets of winch crews at all three sites, mismatched spare lumber, and idle waiting for raft mooring schedules had been consolidated one by one, saving thirty percent without burdening any single village.

Both labor and materials were thirty percent less than originally estimated.

The accounts of lost working time did not vanish either. North Gully had halted four rounds of timber rafts, two households in West Bridge missed their field weeding, and the Hexi Smelting Shed lost a day's intake of ore carts. Lu Heng listed these at the end of the bridge repair ledger, not crossing them out with the four words "the bridge is repaired."

Before sunset on the seventh day, the barricades on all three bridges were removed.

The first thing Lu Heng did, however, was untie the cords.

He took down the three village tablets for Cross-River Bridge, the two tablets for North Gully's short bridge, and the two tablets for East Village's Shallow Ditch Bridge one by one, laying them out before each village along with unused timber, leftover iron nails, and the objection slips from the three villages' bookkeepers.

"The seven days are up," he said.

Someone reminded him, "There is still lost working time that hasn't been apportioned."

"You may continue auditing the accounts, but you cannot continue dispatching people using expired tablets."

The West Bridge labor foreman asked, "What if it breaks again tomorrow?"

"Reauthorize it tomorrow."

"Going through this every time—will there be enough time?"

Lu Heng pulled his hand back from the ledger board: "That is why it requires separate discussion. But holding onto these tablets and refusing to return them does not count as having reached an agreement."

The three villages stared at the village tablets on the table; not a single one remained bound in his hands.

The next day, five stacks of new ledgers were delivered to the empty house by the bridge.

West Bridge sent over two sections of road where carts bogged down after the rain; Hexi sent a shared charcoal transport route; North Gully had disputes over the timber sluice and Shallow Mine road; East Village Medicine Shed requested the five villages split the night watch grain rations for injured personnel from other villages; and Main Village once again brought up the rainproof cart needed for the twelve-shichen submission cycle.

Every single matter involved at least two villages, and three involved the Mountain Gate as well.

The five villages did not return the old seven-day tablets to Lu Heng. They set up a new table in the empty house by the bridge, upon which rested only ledgers, rosters, and the task tablets sent from each village.

The term was written as one year.

West Bridge originally wanted to continue using the three-village method of cutting cords, where any single village could bring the entire accounting house to a standstill. East Village disagreed: "If there's an error on Hexi's charcoal route, on what grounds should the Medicine Shed's submission cart be halted as well?"

Ji Chuan broke down the right of revocation to specific matters. Whichever village revoked a matter, that matter would halt from the following day; other bridges and roads with tablets already placed would proceed as usual. Only if the accounting house forged person tallies, altered material or labor logs without authorization, or concealed injury suspensions, would all new dispatches be paused upon joint verification by two rotating villages. Carts currently clearing hazards, transporting medicine, or transferring injured personnel would still finish their day's journey under their original tablets; auditing could not be used as an excuse to block the roads.

North Gully further requested that the accounting house maintain its own standing labor crew, which Lu Heng flatly refused on the spot. Once standing workers answered solely to the Chief Registrar, they might repair bridges today, but tomorrow they could blockade doors on behalf of the accounting house. The final method written down was that each village would retain its own corvée labor roster; the accounting house could only request numbers and roles according to specific matters, with the villages handing over person tallies. Who failed to appear and who substituted for whom would all be entered into public accounts.

This inter-village public accounting house could receive the four-column limited roster, issue unified person and cart tallies, audit the actual use of bridges, roads, canals, submission carts, and public medicine and grain, propose labor division ratios, and publish them daily. To mobilize people or materials, the relevant villages still had to place tablets for specific matters; the accounting house possessed neither standing workers nor the Divine Lord's bestowed seal, so detaining people or fining grain were not on its task board.

Any village could revoke unstarted matters concerning their village. For work already begun, the day's materials, labor, and injury suspensions had to be settled first before halting the next day's dispatch. When the one-year term expired, regardless of how much had been accomplished, authorization had to be renegotiated.

When Lu Heng was pushed behind the desk, he did not accept a new seal.

The title the five villages gave him was Interim Chief Registrar.

First, he struck the house and two mu of dry field he had put up as collateral from the bridge accounts, and nailed the three-bridge settlement tablet outside the door. The thirty percent saved in materials and labor was written on the front, while the lost time of four rounds of timber rafts, two households' farming season, and one day of ore carts was written on the back.

Ji Chuan locked the four-column limited roster into a double-keyed wooden chest. One key belonged to the accounting house, and one was held by that day's rotating village. The Mountain Gate could only update the roles and injury suspensions of its permanent residents, not delete people on behalf of the villages; the villages could only see the four columns and could not peruse the Mountain Gate's complete disciple register.

The first inter-village co-management ledger was soon posted.

On it, there was neither bridge nor road.

The Mountain Gate had sent forty-seven disciple grain-corvée tablets, with full names and full current residences. In the public role column, the same four words were written for all forty-seven:

"Guard duty offset."

The four columns for night patrol hours, teaching records, disaster relief counts, and current injury suspensions were completely blank.

Lu Heng flipped through all forty-seven tablets from beginning to end, then placed them back in the wooden tray just as they were.

The bridge was finished.

But this tray of accounts had only just arrived on the desk.