"Mr. Xu, currently our solution can achieve a fast charging power of 500 kilowatts, and the peak power can be stabilized up to 80%..."

The person in charge introduced the plan earnestly. This plan could steadily increase charging power from 10% to 80%. The charging power for the final 20% would decrease, but even after that reduction, the power would remain above 120 kilowatts.

At this power, a 100 kWh Battery Pack could be fully charged in less than 20 minutes, a speed that was already quite terrifying. At the very least, in the eyes of the researchers at Xingchao Energy, this was absolutely heaven-defying.

However, Xu Lei wore a mysterious smile; the performance of the Super Sodium Battery had significantly reduced the difficulty of Flash Charging Technology.

But Xu Lei felt this speed was still not enough. Since he was going to do it, he had to do it the best.

After the inspection, Xu Lei directly asked the staff to prepare four sets of equipment for him to take away.

Once the four sets of equipment were delivered to the warehouse, Xu Lei began the Synthesis of these items again.

After the four sets of equipment finished the Synthesis, the final product was released.

The core components were released: energy storage cabinet, charging gun, charging module, and Battery Pack.

Looking at the data, Xu Lei was happy. The energy storage cabinet solution had been optimized, and the charging solution had also been optimized.

In the final solution, the maximum single-gun charging power was 1500 kilowatts, and the peak charging power could be maintained from 10% battery level up to 98%.

On the Battery Pack side, after 10,000 fast-charging cycles, the degradation would not exceed 20%.

This technology was quite heaven-defying. It could charge 1500 kilowatt-hours in one hour, meaning it could charge 25 kilowatt-hours in one minute. For a 100 kWh Battery Pack, it only needed 4 minutes, and for a 150 kWh Battery Pack, it only needed six minutes.

Even for those 600 kWh Battery Packs used in electric trucks or buses, it only needed 24 minutes. Even with a 1000 kWh Battery Pack, it only needed 40 minutes.

This was quite terrifying. You have to know that even for a bus with a 600 kWh Battery Pack, the range could reach 600 kilometers.

With such a charging speed, this range was actually enough. Not to mention 600, even 400 was sufficient. On the highway, buses could only travel at a maximum of 100 km/h.

After driving for four hours, let the passengers get off to use the restroom and rest. Then, the bus could be fully charged in ten minutes; how is this any different from refueling?

With this kind of charging speed, there was absolutely no range anxiety. Even for gasoline cars, filling up a tank of gas usually only gets you five or six hundred kilometers anyway.

And most of the time, car owners do not have much need to fill the tank completely, because the more fuel in the tank, the higher the fuel consumption.

It was the same for electric vehicles; the larger the battery, the heavier the Battery Pack, and the higher the energy consumption.

With the performance of the Super Sodium Battery, an 80 kWh Battery Pack should be able to achieve an EAP range of 600 kilometers, which was basically enough.

When you run out of power, you go to a charging station, and an 80 kWh Battery Pack could be fully charged in less than four minutes—what kind of range anxiety is that?

Of course, the premise was that there must be enough charging stations, with high enough density, and charging must be convenient.

However, with this charging method, setting up charging stations was very simple. Eventually, the density of charging stations would easily exceed that of gas stations. Managing charging stations was much simpler than gas stations, and they hardly required many employees.

Currently, there was another advantage: there were no electric vehicles on the market. Xu Lei could make this set of standards the national standard. Xingchao Energy could directly sell the solution, selling the batteries and charging modules to car companies.

If car companies all adopted the same technology, the charging efficiency of all vehicles could reach such a high level.

Coupled with new types of Photovoltaic panels, building charging stations would have even more advantages. Charging stations could be built like gas stations, with Photovoltaic panels installed directly on the roof.

1000 square meters of Photovoltaic panels could generate 500,000 kilowatt-hours of electricity per year. Because of the energy storage cabinets, the electricity generated by the Photovoltaic panels during the day could go directly into the energy storage cabinets, reducing the amount of energy the power grid needed to supply to the cabinets.

At night, although the Photovoltaic panels would not generate electricity, the price of off-peak electricity was cheaper. When it was cheap, the energy storage cabinet would become a power reservoir, storing the cheap and unused electricity.

In this way, charging stations across the country would become reservoirs and regulators for the national power grid. They could better regulate the country's power system.

With this massive reservoir, many power plants would not need to abandon electricity or reduce their output. This was because power plants like coal, hydro, and nuclear could not be shut down easily.

The electricity generated at night that could not be used would just be wasted. This was also the reason why the country encouraged using electricity at night.

Now with charging stations and energy storage cabinets across the country, while household or business electricity usage decreased at night, the energy storage cabinets would increase their electricity consumption.

During the day, once the energy storage cabinets were full, combined with the solar panels, it would reduce the pressure on the power grid, playing a role in peak shaving and valley filling.

This was related to the national energy strategy. If charging stations, energy storage cabinets, and electric vehicles were rolled out across the country, Huaxia would grasp the pricing power for electricity.

If all cars across the country used electricity, Huaxia would not need to import so much oil. Huaxia's power generation technology was very impressive, and its power transmission technology was also very impressive.

Regarding the Analysis of the technology, the price for this Analysis was not expensive, because there was already a foundation; the entire technology only cost 2.3 billion RMB.

However, Xu Lei knew that this technology, let alone 2.3 billion, if he had to research it himself, he would not be able to develop it even with 23 billion. Just for a single Super Sodium Battery, hundreds of billions in R&D funds would not be enough to develop it.

The whole plan was complete, and the next step was to start implementation.

However, such a big piece of cake was not something he could eat alone. He needed to find a partner, and the best partners would naturally be state-owned enterprises like State Grid and China Southern Power Grid.

Although this was a new industry, it would also infringe upon the interests of others.

Not to mention anything else, The Three Barrels of Oil alone involved the interests of too many people.

Therefore, the best plan was to bring in multiple giants to work on this business together. Even The Three Barrels of Oil could be included, especially the two giants of oil and petrochemicals.

They could directly build flash charging stations inside their gas stations, and some gas stations could even be directly converted into flash charging stations.

Besides these, building new charging stations was also much simpler than gas stations. Gas stations had to consider safety issues, with very strict requirements and very strict audits.

Charging stations, however, had very high safety, and with energy storage cabinets to regulate grid pressure, they were very simple to build and could be deployed very quickly.

First, set up the entire charging network. Once the network was built, the upcoming electric vehicles with Sodium-ion Battery would definitely be a big hit.

In this way, not only would the domestic automotive industry be reshuffled, but the domestic energy industry would also be reshuffled. It would even directly affect the entire international situation.

By then, Huaxia's volume of imported oil would decrease significantly, and this reduction would directly affect the international oil situation. And this was just domestically; if this network were rolled out globally, the global oil landscape would undergo earth-shaking changes.