At 6:30 AM, Xiao Li, the head of the Technical Group, had already assembled sixteen technicians at the turret entrance. Everyone held a thick wiring diagram, the edges curled and frayed from repeated handling. The space inside the turret was even more cramped than expected; most areas could only accommodate one person working hunched over, and some critical connection points even required lying on one's side or back to operate.

"Let's confirm the groups and responsibilities one last time." Xiao Li's voice was clear and steady in the morning's cold wind. "Group One, power cables, Old Zhang is in charge. Forty-eight main and auxiliary power lines, distinguished by red, yellow, and blue colors; the connection sequence must strictly follow the diagram. Group Two, signal lines, Xiao Wang is in charge. Eighty-nine lines—thirty-six for control signals, fifty-three for sensor feedback. Each line has an individual number; check three times before connecting."

"Group Three, data bus, Xiao Liu is in charge. Eight high-speed channels, sixteen low-speed. The fiber optic interfaces are extremely fragile; set the alignment instrument precision to 0.1 millimeters. Group Four, control circuits, Old Li is in charge. Fifty-two lines—twenty-four for servo control, eighteen for valve control, ten for safety loops. This is the most complex part; any error could lead to a loss of motion control."

"Groups Five through Eight, specialized lines. Thirty-two pipes for the cooling system, twenty-eight for the gas system, fifty-four for the hydraulic system. Pipe connections must not only be sealed but also account for thermal expansion and contraction allowances. Is everyone clear?"

"Clear!" the sixteen people replied in unison.

"Put on your headlamps and check your toolkits. Once inside, act according to your groups and keep communications open. Report any problems immediately; do not attempt to handle them on your own. Begin."

The technicians entered the turret one by one. The entrance was only 1.2 meters in diameter, requiring them to bend over to crawl inside. The internal lighting system was not yet fully operational, so they had to rely on headlamps and portable lighting. The space was divided into a maze-like structure by various brackets, pipes, and cable trays, and the air was filled with a mixture of scents: metal, insulation materials, and anti-rust paint.

Old Zhang led Group One to the power distribution area. Forty-eight power interfaces were concentrated here, each with a nameplate marking the voltage, current, and phase. However, a problem soon emerged—about five percent of the cable labels had worn off or fallen off during transport. Although most could be deduced by the color and thickness of the cable, there were still seven lines whose identities could not be determined.

"Xiao Li, the power group has encountered a problem with missing labels." Old Zhang reported via the communicator. "Seven lines cannot be identified; three of them might be main power, and four are auxiliary power. If connected incorrectly, it could result in a tripped breaker at best, or a short circuit that burns out the equipment at worst."

"Don't touch those seven lines yet." Xiao Li responded. "Continue connecting the confirmed cables. I will ask Lin Fan for instructions."

In the Command Room, Lin Fan was reviewing the overall progress chart. Hearing the report, he turned to the console. "System, analyze cable identification solutions, focusing on the seven unidentifiable power cables."

The screen flickered. 【Cable identification solution analysis: - Problem: Seven power cables are missing labels and cannot be identified (possibly main power or auxiliary power) - Identification method evaluation: 1. Electrical characteristic measurement: Measure resistance and inductance, compare with database (85% accuracy, 3-5 minutes per line) 2. Insulation layer characteristic analysis: Analyze insulation material thickness and color distribution (72% accuracy, 2-4 minutes per line) 3. Port compatibility test: Attempt to connect to potential ports, detect power supply status (95% accuracy, but higher risk) - Recommendation: Use methods 1 and 2 for non-destructive identification first, then use cautious port testing for those that remain unconfirmed - Estimated total time: 35-50 minutes】

"Approved for execution." Lin Fan issued the order. "Prioritize safety and minimize port testing."

"Understood."

Old Zhang began using a high-precision multimeter to measure the resistance of the first unknown cable. The reading showed 0.0025 ohms, which matched the typical value of 0.0020-0.0030 ohms for main power cables. However, the resistance of the auxiliary power cables was also in a similar range, so it could not be completely determined.

"Insulation layer analysis." Old Zhang said to his assistant.

The assistant used a portable thickness gauge to measure the insulation layer thickness—1.8 millimeters. The design thickness for main power cables was 1.5-2.0 millimeters, and for auxiliary power, it was 1.2-1.8 millimeters. The data overlapped, so it was still not one hundred percent certain.

"Try the second method." Xiao Li said over the communicator. "Signal characteristic test. Send a low-voltage test pulse from the controller end and detect the response at this end."

This required the system's cooperation. After Lin Fan authorized it, the console sent a test command to the potential main power controller. Old Zhang connected an oscilloscope to the end of the cable and waited for the signal.

Five seconds later, a standard square wave pulse appeared on the oscilloscope screen—this was the characteristic signal of the main power controller.

"Confirmed, this is main power cable PWR-M-07." Old Zhang marked the cable and began connecting it.

The first one was resolved, taking eight minutes. At this rate, seven lines would take nearly an hour. But at least it was non-destructive identification, which was safe.

At 9:00 AM, the power group completed the connection of the thirty-five confirmed cables, reaching 73% progress. Of the seven unknown lines, four had their identities confirmed through electrical and signal characteristics, and three still required further analysis.

Meanwhile, the signal line group encountered a trickier problem.

"Lin Fan, report from the signal group." Xiao Wang's voice carried confusion. "We found that the physical definitions of the ports for signal lines SIG-31 to SIG-34 do not match the blueprint. The blueprint shows these four ports should be connected to the temperature sensor array, but the actual ports are marked as 'Reserved Interface'. Even stranger, the number of pins on the ports is also different—the blueprint specifies eight pins, but the actual ones have twelve."

"Have you checked the output interface of the sensor array?" Lin Fan asked.

"Checked. The output of the sensor array is indeed eight pins, consistent with the blueprint. However, these four ports inside the turret are twelve-pin; we don't know the function of the extra four pins."

"System, analyze the cause of the port discrepancy and provide solutions."

【Port discrepancy analysis: - Phenomenon: Signal ports SIG-31 to SIG-34, blueprint defines eight pins (temperature sensor), actual ports have twelve pins - Possible causes: 1. Design change not updated in blueprint (40% probability) 2. Different equipment batch, port specifications upgraded (35% probability) 3. Production error, incorrect specification ports installed (25% probability) - Solutions: - Option A: Use an adapter (needs customization, takes 6-8 hours) - Option B: Modify the sensor array interface to twelve pins (might affect sensor performance) - Option C: Use existing eight pins, ignore the extra four (Risk: potential poor contact) - Option D: Thoroughly inspect the port circuit to determine the function of the extra four pins before deciding - Recommendation: Adopt Option D, make a decision after a thorough inspection】

"Adopt Option D." Lin Fan made the decision. "The Technical Group should thoroughly inspect the port circuit to determine the function of the extra four pins. If they are reserved functions, they can be ignored for now. If they are necessary functions, we will consider adapting or modifying them."

"Understood."

The Technical Group began disassembling the port housings to inspect the internal circuit boards. This required delicate operation, using micro-tools in the cramped space while avoiding damage to other lines.

At 11:00 AM, the inspection was complete. Of the extra four pins, two were for ground enhancement, one was for shielding connection, and one was indeed reserved. The reserved pin could be ignored, but the ground and shielding needed to be connected.

"Solution: Use an eight-pin to twelve-pin adapter, connect the sensor's eight pins accordingly, and connect the ground and shielding pins to the turret's internal ground wire." Xiao Wang reported. "We have spare adapter materials; processing will take two hours."

"Approved. At the same time, update the blueprint to record this discrepancy."

"Understood."

The progress of the data bus group was relatively smooth. The eight fiber optic cables for the high-speed data channels had been aligned and connected, and transmission speeds were being tested.

"System, start the data channel performance test." Lin Fan ordered.

【Data channel performance test: - Channel 1: Latency 1.3 ms, bit error rate 0.00009%, bandwidth 1.25 Gbps - Channel 2: Latency 1.2 ms, bit error rate 0.00011%, bandwidth 1.30 Gbps - Channel 3: Latency 1.4 ms, bit error rate 0.00008%, bandwidth 1.22 Gbps - Channel 4: Latency 1.3 ms, bit error rate 0.00012%, bandwidth 1.28 Gbps - Channel 5: Latency 1.2 ms, bit error rate 0.00010%, bandwidth 1.32 Gbps - Channel 6: Latency 1.3 ms, bit error rate 0.00007%, bandwidth 1.20 Gbps - Channel 7: Latency 1.1 ms, bit error rate 0.00013%, bandwidth 1.27 Gbps - Channel 8: Latency 1.2 ms, bit error rate 0.00009%, bandwidth 1.31 Gbps - Overall evaluation: Performance exceeds design requirements, data transmission system qualified】

Good news. Data transmission was the "nervous system" of the turret; its performance directly affected reaction speed and strike accuracy.

At 12:00 PM, the overall connection progress reached 42%. The technicians rotated for a break and had a simple meal. The temperature inside the turret was slightly higher than outside, but it was still around minus fifteen degrees. Hot drinks and energy bars were sent in, and everyone squatted in the slightly more spacious areas to quickly finish their meal.

At 1:00 PM, work continued. The control line group encountered the biggest challenge of the day.

Old Li led the Fourth Team in charge of the servo control lines. Among the fifty-two lines, six had labels that were completely worn off, making them unidentifiable. More troublesome was that the electrical characteristics of these six lines were almost identical—the differences in resistance, capacitance, and inductance values were less than one percent, and signal characteristic tests showed that they all transmitted PWM (Pulse Width Modulation) signals, with highly similar frequency and duty cycle ranges.

"We cannot distinguish which one controls the pitch servo, which one controls the azimuth, and which one controls the barrel stabilization," Old Li reported. "If connected incorrectly, the servo motors might move in the wrong direction, leading to mechanical collision or damage."

Lin Fan pondered. Servo control confusion was a serious issue that had to be resolved. "System, analyze the servo control line identification plan, focusing on the six lines that are completely indistinguishable."

【Servo Control Line Identification Plan: - Background: CTL-19 to CTL-24, six servo control lines, controlling pitch (primary/backup), azimuth (primary/backup), and barrel stabilization (primary/backup) respectively - Identification Difficulties: Electrical characteristics are identical, signal features are highly similar, physical appearance is consistent - Feasible Methods: 1. Physical Path Tracing: Remove protective covers, trace cable routing (takes 2-3 hours, no risk) 2. Servo Driver Side Detection: Disassemble driver housing, check internal markings (takes 1-2 hours, low risk) 3. Send specific test signal from controller side, detect movement at servo side (higher risk, may trigger accidental movement) - Recommendation: Combine methods 1 and 2, first trace paths to determine groupings, then disassemble one driver to determine primary/backup】

"Approved. Trace the physical paths first."

The Technical Group began removing the protective covers in the servo control area. The covers were made of carbon fiber composite material and secured by twenty-four small bolts. Disassembly in the confined space required patience to avoid scratching other internal cables.

At 2:30 PM, the protective covers were removed. The physical paths of the six cables were fully exposed. The technicians traced them one by one along the cable ducts and discovered they led to three different servo motor groups—two groups leading to the turret pitch mechanism, two groups leading to the rotating platform, and two groups leading to the barrel stabilizer.

"Paths determined: Cables A and B lead to pitch; C and D lead to azimuth; E and F lead to barrel stabilization," Old Li reported. "But the primary and backup lines within each group still cannot be distinguished."

"Disassemble the pitch servo driver housing and check the internal markings," Lin Fan ordered. "Once one group is determined, the others can be inferred by analogy."

The technicians carefully disassembled the housing of one pitch servo driver. On the internal circuit board, next to the output port, there were tiny laser-engraved markings: "PRI" for primary, "SEC" for backup. By comparing the connections, they determined that cable A connected to the primary port and B connected to the backup.

"Confirmed: A is CTL-19 (pitch primary), B is CTL-20 (pitch backup). Based on installation symmetry, it is inferred that C is CTL-21 (azimuth primary), D is CTL-22 (azimuth backup), E is CTL-23 (stabilization primary), and F is CTL-24 (stabilization backup)."

The problem was solved, but it took three hours. The connection progress was affected.

At 4:00 PM, the special lines team began work. The pipe connections for the cooling system, gas system, and hydraulic system required extremely high airtightness. However, the Seventh Team quickly discovered a problem—the interface between the main cooling pipes C01 and C02 had a 1.2-millimeter planar misalignment and a 0.2-degree angular deviation.

"The maximum compensation capacity of the sealing ring is 0.8 millimeters and 0.1 degrees," the team leader reported. "The current deviation is out of range; forcing a connection might lead to leaks during long-term operation."

"Cause of the misalignment?"

"It might be the cumulative error during pipe bracket installation, or slight deformation during base casting. We checked the adjacent pipes, and the misalignments were all within 0.5 millimeters, which is acceptable. But the C01-C02 interface exceeds the limit."

"System, analyze solutions for the pipe misalignment."

【Pipe Misalignment Solutions: - Measured Data: Planar misalignment 1.2mm, angular misalignment 0.2 degrees - Sealing Ring Compensation Limit: 0.8mm, 0.1 degrees - Solutions: 1. Adjust brackets and realign (requires disassembling adjacent pipes, takes 4-5 hours) 2. Machine a custom transition joint (takes 6-8 hours) 3. Slightly trim the interface plane (high risk, may damage sealing structure) 4. Use high-elasticity sealing rings as a substitute (requires low-temperature performance verification) - Recommendation: Solution 1 is the most reliable; although time-consuming, it can fundamentally solve the problem】

"Adopt Solution 1," Lin Fan decided. "The cooling system is critical and must be absolutely reliable. Remove the adjacent pipes and readjust the brackets. If it cannot be finished today, work overtime."

"Understood."

The Seventh Team began removing the C03 and C04 pipes to clear operational space. This added extra workload, but there was no other choice.

At 6:00 PM, night fell. Lighting was turned on at the construction site, and connection work continued. Most teams had completed their core tasks, leaving only a few difficult points.

At 7:00 PM, Qin Yue arrived at the Command Room, bringing new intelligence.

"The Spark Council has increased their monitoring methods," she pulled up the drone footage. "They have newly deployed a high-power laser rangefinder five kilometers away, and are also using a passive acoustic monitoring system—inferring internal activities by analyzing the sounds of our construction."

"Acoustic monitoring..." Lin Fan thought. "Passive monitoring only receives sound, so conventional jamming is ineffective. Unless we construct in complete silence, but that is impossible."

"We could create jamming noise, but that would affect us as well," Qin Yue paused. "Or, transmit false information."

Lin Fan understood what she meant. "During the connection testing phase, deliberately create 'fault' sounds to make them mistakenly believe we have encountered serious technical problems."

"Does it require system cooperation?"

"Yes," Lin Fan turned to the console. "System, generate an acoustic camouflage plan. Simulate fault sounds that might occur during the connection process, requiring them to be realistic and credible but not actually affect performance, and be remotely triggerable."

【Acoustic Camouflage Plan: - Simulatible Fault Types: Hydraulic pump abnormality, coolant leak, electrical short circuit, mechanical jam, system alarm - Playback Equipment: turret internal audio system - Trigger Method: Remote wireless control, can be timed or manual - Risk: May cause our own personnel to misjudge (15% probability), requires advance notification - Recommendation: Use at night to create a contrast with normal daytime sounds】

"Approved for execution. Start at 10:00 PM tonight, play one type of fault sound every hour, for three to five minutes each time. Notify all personnel in advance."

"Understood."

At 8:00 PM, the cooling pipe adjustments were completed. After reinstallation, the interfaces were perfectly aligned, the sealing rings were installed smoothly, and the pressure test passed.

At 9:00 PM, the identities of all unknown cables were confirmed, and connections were completed.

At 10:00 PM, the acoustic camouflage was activated. An abnormal noise from the hydraulic pump emanated from inside the turret, lasting four minutes. Drone monitoring showed that activity at The Camp of the Spark Council increased significantly.

"They have fallen for it," Qin Yue reported. "Communication frequency increased; they might be reporting the 'fault'."

"Continue."

At 1:00 AM, 95% of the special line connections were completed. At 2:00 AM, the last few hydraulic pipe connections were completed, and the pressure test passed.

"Internal line connections are all complete!" Little Li's voice carried fatigue and excitement. "Three hundred twenty-seven lines, eight hundred ninety-one connection points, all connected, preliminary tests passed."

"System, comprehensive check," Lin Fan ordered.

【Internal Line Connection Comprehensive Check: - Power Cables: 48 all normal, insulation resistance meets standards - Signal Lines: 89 all normal, signal transmission interference-free - Data Buses: 24 all normal, bandwidth meets standards - Control Lines: 52 all normal, control response accurate - Special Lines: 114 all normal, pipes leak-free - Connection Points: 891 all normal, contact resistance qualified - Overall Evaluation: Quality Rating A, meets system integration requirements】

Check passed. Internal line connection task completed.

Little Li took off his safety helmet and wiped the sweat from his forehead. "Three hundred twenty-seven lines, eight hundred ninety-one connection points, all checked and qualified. According to this progress, the system joint debugging can start on schedule at 8:00 AM tomorrow."

Lin Fan checked the time; it was 2:47 AM. Outside the window, it was pitch black, with only the lighting of the construction site and the faint lights of The Camp of the Spark Council in the distance. A day of hard work had yielded substantial progress—all subsystems of the turret were now physically connected, forming a complete whole.

But the real test was yet to come. System joint debugging required coordinating various subsystems, optimizing parameters, resolving compatibility issues, and verifying performance indicators. This would require time, patience, and a little bit of luck.

Furthermore, external threats were still looming. The energy pulse interval of the Beta-11 Site had shortened to two hours and thirty-two minutes, the surveillance of the Spark Council was becoming increasingly tight, and the problem of insufficient hydraulic oil remained unresolved...

He turned and left the Command Room. On the way to the rest area, fatigue surged like a tide, but the string in his heart remained taut. The construction site lighting gradually dimmed behind him, while the windows of the rest area ahead emitted a warm yellow light.