16
Lin Fan stood in front of the separator, holding a data pad with the preliminary energy system architecture diagram he had stayed up all night drawing. Su Qingxue walked out of the tent, carrying two cups of hot coffee—a precious resource found in the Storage Depot.
"You haven't slept for four hours." Su Qingxue handed him a coffee. "It's bad for your health."
"The energy system planning is too important; I couldn't sleep." Lin Fan took the coffee, the warmth seeping through his gloves. "I thought about a lot last night. We now have control over the Node Four regulator, the energy conversion efficiency is 94.3%, the first energy core fragment has a purity of 63.7%, and the materials for the Geothermal Generator Prototype are basically collected... but these are all scattered results. We need a complete energy system architecture."
Su Qingxue nodded: "The database downloaded from the Storage Depot contains complete military energy system design documents. Although some technology is outdated, the architectural logic is worth learning from."
"System, pull up the energy system planning interface." Lin Fan said.
A translucent interface appeared before his eyes:
【Energy System Planning Module (Temporarily Unlocked)】
Description: Design a complete energy system architecture based on current resources, technology levels, and future needs.
Available Modules:
1. Power Generation Unit Design (Geothermal, Solar, Nuclear, Wind)
2. Energy Transmission Network Design (Wired, Wireless, Superconducting)
3. Energy Storage Unit Design (Chemical Battery, Supercapacitor, Flywheel Energy Storage, Gravity Energy Storage)
4. Energy Management System Design (Intelligent Distribution, Priority Control, Fault Emergency)
5. Security Protection System Design (Physical Protection, Energy Shield, Encryption Protocol)
6. Expansion Interface Design (Future Technology Access, Modular Upgrade)
Each module requires upgrade points for detailed design. Once the design is complete, specific construction blueprints and technical documents will be generated.
"Let's start with the power generation unit." Lin Fan selected Module 1. "The Geothermal Generator Prototype is our most feasible power generation method right now."
【Geothermal Generator Prototype Design Parameters】
Location: Geothermal outlet on the east side of the Mining Site (Coordinates N 39° 12' 51", E 98° 45' 42")
Geothermal output power: 480 kW (theoretical maximum)
Usable power: approximately 300 kW (considering equipment efficiency and transmission losses)
Design goals:
- Power generation: 80 kW (stable output)
- Efficiency: ≥ 25% (Geothermal → Electrical energy)
- Reliability: Continuous operation ≥ 720 hours without failure
- Maintenance cycle: ≥ 240 hours per simple maintenance
- Footprint: ≤ 200 square meters
- Construction time: 5 days (main body) + 2 days (debugging)
【Material List Verification】
1. Turbine Rotor Assembly: Completed (obtained from abandoned power station)
2. Heat Exchanger Assembly: Completed (obtained from the Storage Depot)
3. Generator Body: Completed (obtained from the Mining Site Control Room)
4. Control System: Completed (obtained from the Storage Depot)
5. R134a Working Fluid: 5.5 kg (reached standard)
6. Gaskets: Completed
7. Piping System: 80% completed (still need some elbows and valves)
8. Insulation material: Completed
9. Structural support frame: Needs to be built (sufficient materials)
10. Cooling system: Needs to be built (sufficient materials)
"What is still missing for the piping system?" Lin Fan asked.
Su Qingxue pulled up the list: "We mainly lack high-temperature and high-pressure valves, especially the control valve for the turbine outlet. There are similar specifications in the Storage Depot, but they need to be modified to fit."
"System, search for alternative solutions."
【Searching...】
Found three alternative solutions:
Solution A: Modify the fuel control valve of an aircraft engine from the Storage Depot.
Advantages: High pressure and temperature resistance, high precision.
Disadvantages: Requires re-machining the interface, takes about 8 hours.
Success rate: 85%.
Solution B: Use the safety valve assembly from the Mining Site hydraulic system.
Advantages: Materials are readily available, interface fits.
Disadvantages: Pressure resistance rating is slightly low, may affect long-term reliability.
Success rate: 70%.
Solution C: Temporarily manufacture a simple valve and replace it when a suitable one is found.
Advantages: Quick fix, does not affect construction progress.
Disadvantages: Requires frequent maintenance, risk of leakage.
Success rate: 60%.
"Select Solution A." Lin Fan said. "Precision and reliability are more important. We will go modify it this morning."
Su Qingxue noted: "Okay. Next is the energy transmission network. Currently, we only have simple wire connections, which are inefficient and unsafe."
Lin Fan switched to Module 2:
【Energy Transmission Network Design】
Current status:
- The Camp's main equipment is connected by ordinary copper cables, transmission efficiency is about 85% (200-meter distance)
- Voltage is unstable (fluctuation range ± 15%)
- No redundant backup, a single point of failure could paralyze the system
- No intelligent distribution, serious energy waste
Design goals:
1. Establish a three-level voltage system (high-voltage transmission, medium-voltage distribution, low-voltage usage)
2. Increase transmission efficiency to ≥ 95% (200-meter distance)
3. Establish dual-loop redundancy, single point of failure does not affect overall operation
4. Implement intelligent load distribution, automatic adjustment based on priority
5. Reserve future expansion interfaces (solar, wind, nuclear access)
【Technical Options】
1. Transmission medium: Superconducting material (unavailable), high-purity copper cable (available), aluminum cable (available but low efficiency)
2. Insulation technology: Traditional insulation (available), new composite materials (partially available)
3. Intelligent control system: Modification based on industrial PLC from the Storage Depot (available)
"How much high-purity copper cable is in the Storage Depot?" Lin Fan asked.
Su Qingxue checked the database: "About 1200 meters of 10mm diameter high-purity copper cable. There is also about 800 meters of 6mm diameter. It is enough to cover the current scope of The Camp, but it might not be enough considering future expansion."
"Satisfy current needs first." Lin Fan marked on the map, "System, generate the optimal wiring plan."
【Generating...】
Plan 1: Star topology
Advantages: Easy to manage, good fault isolation
Disadvantages: High load on the central node, long wiring length (total length about 850 meters)
Plan 2: Ring topology
Advantages: Good redundancy, disconnection at any point does not affect the whole
Disadvantages: Complex wiring, high cost (total length about 920 meters)
Plan 3: Hybrid topology (star + ring)
Advantages: Balances manageability and redundancy
Disadvantages: Complex design, requires more intelligent switches (total length about 880 meters)
"Select Plan 3." Lin Fan said. "Redundancy is very important. Also, install intelligent switches on all critical nodes to achieve remote control and status monitoring."
"Intelligent switches need to be modified from the control equipment in the Storage Depot." Su Qingxue calculated, "We need about 20, we have 15 ready-made, and we still need to modify 5."
"Go to the Storage Depot to find materials for modification this afternoon." Lin Fan noted.
Next is the energy storage unit design. Currently, there are only a few chemical batteries and the first purified energy core fragment, and energy storage capacity is severely insufficient.
【Energy Storage Unit Design】
Current storage capacity:
- Chemical battery pack: Total capacity about 120 kWh (actual usable about 80 kWh)
- First energy core fragment: Capacity equivalent to about 200 kWh (purity 63.7%)
- Other temporary storage: None
Design goals:
1. Main energy storage system: Capacity ≥ 500 kWh, can support 24-hour basic operation of The Camp
2. Emergency energy storage system: Capacity ≥ 100 kWh, automatic switching when the main system fails
3. Rapid response storage: Supercapacitor bank, used to handle instantaneous load fluctuations
4. Long-term energy storage: Consider gravity energy storage or compressed air energy storage (technical reserve)
【Technical Options】
1. Chemical battery expansion: Collect more car batteries, simple but low energy density
2. Lithium-ion battery pack: High technical difficulty, materials hard to obtain
3. Flywheel energy storage: Technically feasible, requires precision machining
4. Supercapacitor: Partially available, requires control system
5. energy core fragment purification: Long-term solution, but limited output
"Short-term focus on chemical battery expansion, while accelerating the purification of the energy core fragment." Lin Fan decided, "System, calculate the optimal energy storage configuration."
【Calculating...】
Based on current power load (peak about 20 kW, average about 12 kW):
- Main storage: Needs at least 144 kWh (12-hour average load)
- Emergency storage: Needs at least 24 kWh (2-hour basic load)
- Rapid response: Needs at least 5 kW instantaneous output capability
Recommended configuration:
1. Main storage: Expand existing chemical battery pack to 300 kWh (need to collect about 180 car batteries)
2. Emergency storage: Utilize the first energy core fragment (200 kWh), but requires a dedicated converter
3. Rapid response: Modify the pulse capacitor bank from the Storage Depot (available, capacity about 8 kWh)
"Car batteries..." Lin Fan thought, "There are quite a few abandoned vehicles at the Mining Site, but many are already damaged. Need to screen and test them."
"I can design a rapid testing device." Su Qingxue said, "Use Energy Perception to detect the internal state of the batteries and screen out the usable ones."
"Good. Next is the energy management system." Lin Fan switched to Module 4.
This is the "brain" of the entire system. Currently, it relies entirely on manual scheduling, which is inefficient and prone to errors.
【Energy Management System Design】
Functional requirements:
1. Real-time monitoring: Status of power generation, transmission, storage, and consumption links
2. Intelligent distribution: Automatically distribute energy based on priority
3. Predictive scheduling: Predict energy supply and demand based on historical data and weather forecasts
4. Fault diagnosis: Automatically identify faults and provide handling suggestions
5. Safety protection: Prevent overload, short circuit, illegal access, etc.
6. Energy efficiency optimization: Continuously analyze data and provide optimization suggestions
【Hardware Foundation】
- Main control computer: Can use the military server from the Storage Depot (performance is sufficient)
- Sensor network: Need to deploy temperature, voltage, current, power, and other sensors (partially available)
- Communication network: Add data communication capability based on existing wiring
- Display terminal: Can use data pads and tablets
【Software Development】
- Operating system: Custom based on Linux (technically feasible)
- Application software: Need to write monitoring, control, analysis, and other modules
- Interface design: Need an intuitive and easy-to-use graphical interface
"Software development is the biggest challenge." Lin Fan said, "We don't have professional programmers."
Su Qingxue had a different view: "There might be ready-made energy management software in the Storage Depot's server, at least a basic framework. We can modify it based on that."
"System, search for energy management software in the Storage Depot database."
【Searching...】
Found relevant software packages:
1. "Black Mountain" Military Base Energy Management System v3.2 (Complete Version)
2. Distributed Energy Network Monitoring Platform v2.1 (Simplified Version)
3. Intelligent Grid Control Core v4.0 (Demo Version, limited functionality)
4. Various tool libraries and drivers
"Great." Lin Fan felt energized, "The 'Black Mountain' system is a complete military-grade product. Although it may need adaptation, the basic framework can definitely be used."
"It will take time to study." Su Qingxue said, "I estimate it will take at least three days to get familiar with and modify it."
"That's acceptable." Lin Fan nodded, "Finally, the security protection system."
The energy system is the lifeline of The Camp and must be strictly guarded.
【Security Protection System Design】
Threat analysis:
1. Physical destruction: Mutant Creatures, human attackers
2. Energy overload: Equipment failure, operational errors
3. Network attacks: May face hacker attacks if connected to other networks in the future
4. Environmental disasters: Extreme weather, earthquakes, etc.
Protective measures:
1. Physical protection: Reinforce structures, install surveillance, set up barriers
2. Electrical safety: Overload protection, short-circuit protection, grounding system
3. Network security: Firewall, encrypted communication, permission management
4. Environmental protection: Waterproof, freeze-proof, wind-proof design
5. Emergency response: Automatic cut-off, standby system switching, alarm system
【Current Resources】
- Surveillance cameras: The Storage Depot has 8 intact thermal imaging cameras
- Protective barriers: Can be made from abandoned vehicle armor plates
- Electrical protection equipment: The Storage Depot has various circuit breakers, fuses
- Encryption equipment: The Storage Depot has military encryption modules (need to study how to use them)
"We need a layered security system," Lin Fan summarized. "The outermost layer is physical protection, the middle layer is electrical safety, and the core layer is network security."
"We also need regular emergency response drills," Su Qingxue added, "especially the emergency plan for a total power outage."
"System, generate a complete energy system architecture diagram and timeline."
【Generating...】
A complex architecture diagram appeared on the screen, containing five interconnected subsystems: power generation, transmission, energy storage, management, and security. The timeline is as follows:
Phase 1 (Today - Day 3):
- Complete the main construction of the Geothermal Generator Prototype
- Retrofit key components of the transmission network
- Collect and test car batteries
- Research the "Black Mountain" energy management system
Phase 2 (Day 4 - 7):
- Debug and grid-connect the Geothermal Generator Prototype
- Deploy the transmission network
- Expand the energy storage system
- Deploy the basic version of the energy management system
Phase 3 (Day 8 - 14):
- System joint debugging and optimization
- Deploy the security protection system
- Personnel training
- Establish operating procedures
Phase 4 (Day 15 - 30):
- System official operation
- Continuous monitoring and optimization
- Expansion planning (solar and wind energy integration)
"It will take a total of one month to complete," Lin Fan said, looking at the timeline. "But the key parts can be put into use within a week."
"That is already very fast," Su Qingxue said. "Without the system's help, a project like this would take at least half a year."
Just then, Captain Zhang walked over. "Lin Fan, Wang Tieniu discovered an anomaly on the west side of the Mining Site. There is a metallic reaction under the snow; it might be an abandoned vehicle graveyard."
A vehicle graveyard meant a large number of usable car batteries and potentially other parts.
"Let's go take a look." Lin Fan put away his data pad. "The energy system planning requires actual resource support."
The five-person team set off again. On the snow, Wang Tieniu had already dug out a snowdrift, revealing the rusted outlines of vehicles beneath. It wasn't just one; it was a whole patch—at least twenty various vehicles piled together, including trucks, off-road vehicles, and even a medium-sized bus.
"System, scan for usable resources."
【Scanning...】
Total number of vehicles: 27
Estimated recyclable batteries: 18-22 (requires further testing)
Available metal: approximately 15 tons
Other usable parts: engines, transmissions, tires, electronic equipment, etc.
Special discovery: one military communication vehicle, potentially containing communication equipment
"A communication vehicle!" Lin Fan's eyes lit up. "The energy management system needs a communication network, and this might provide the key equipment."
They began clearing the snow. The communication vehicle was a six-wheel-drive container-style vehicle; its exterior was severely rusted, but its structure was basically intact. The rear hatch was frozen shut, so Xiao Li heated it with a blowtorch and forced it open.
The scene inside made everyone hold their breath.
Consoles, displays, and communication equipment—though covered in dust, they looked basically intact. More importantly, there was an independent power system in the rear of the vehicle, including a set of large storage batteries and a diesel generator.
"System, scan device status."
【Scanning...】
Military communication vehicle (Model: CT-3000)
Status: Long-term disuse, some circuits damp, but core components may still be usable
Communication equipment:
- HF/VHF radio (maximum power 100 watts, range approximately 50 kilometers)
- Satellite communication terminal (damaged, requires repair)
- Data modem (possibly intact)
- Encryption module (Model: T-84, requires password for activation)
Power system:
- Diesel generator (5 kW, requires maintenance)
- Battery pack (capacity approximately 40 kWh, current voltage insufficient)
- Solar charging interface (optional)
"A data modem!" Su Qingxue said excitedly. "If it's intact, it can be used for data communication in the energy management system."
"Let's tow the whole thing back to The Camp first," Lin Fan decided. "Be careful; this might be one of our most important discoveries."
They used an armored vehicle to tow the communication vehicle. Because the snow was too deep, it took nearly two hours to drag it back to The Camp. During this time, Su Qingxue kept monitoring the internal status of the communication vehicle using Energy Perception to confirm there was no dangerous energy leakage.
It was noon by the time they returned to The Camp. The temperature had risen to minus 48 degrees Celsius, and the wind had weakened.
Lin Fan had Captain Zhang continue collecting batteries from the other vehicles, while he and Su Qingxue went inside the communication vehicle for a detailed inspection.
【Detailed equipment inspection】
1. HF/VHF radio: Power module damaged, other parts may be intact (repair requires electronic components)
2. Satellite communication terminal: Antenna damaged, motherboard damp (high repair difficulty)
3. Data modem: Surface rust, but circuit board basically intact (70% success rate)
4. Encryption module: Physically intact, but requires password or dedicated equipment to activate (success rate unknown)
5. Control computer: Hard drive may be damaged, RAM and CPU may be intact (requires testing)
6. Power system: Diesel generator needs major overhaul, batteries need charging test
"Prioritize repairing the data modem," Lin Fan said. "System, list the required parts and steps."
【Modem repair plan】
Required parts:
1. Replacement capacitors: 4 (can be salvaged from other electronic devices)
2. Circuit board cleaner: Isopropyl alcohol or specialized cleaner (available in the Storage Depot)
3. Soldering tools: Precision soldering station (available in the Storage Depot)
4. Testing equipment: Oscilloscope or multimeter (available in the Storage Depot)
Steps:
1. Disassemble the modem casing
2. Visually inspect the circuit board for obvious damage
3. Clean the circuit board to remove rust and grime
4. Replace damaged capacitors
5. Resolder loose solder joints
6. Power-on test (proceed with caution, risk of short circuit)
Estimated time: 3-5 hours
Success rate: 70% (assuming no hidden damage)
"Let's do this in the afternoon," Lin Fan said to Su Qingxue. "You lead the repair; you know more about electronics."
Su Qingxue nodded. "I'll need Xiao Li's help; his hands are steadier."
"That's fine."
In the afternoon, the repair work took place in the tent. Su Qingxue and Xiao Li carefully disassembled the modem, while Lin Fan continued to study other details of the energy system planning.
The wiring plan for the transmission network required precise distance measurements. Lin Fan activated the measuring function of his Data Eye and walked around The Camp, marking the locations of each key point.
【Distance measurement complete】
Power plant to main Control Room: 85 meters
Main Control Room to living area: 120 meters
Living area to fortifications: 75 meters
Fortifications to communication vehicle location: 60 meters
Total wiring length: approximately 880 meters (basically consistent with predictions)
"System, calculate the required cable specifications."
【Calculations based on load and distance】
Main trunk line (Power plant → Main Control Room):
- Maximum current: approximately 400 amperes (80 kW / 200 V)
- Recommended cable: Copper cable with cross-sectional area ≥ 50mm² (available in the Storage Depot)
- Voltage drop: approximately 2.1% (acceptable)
Branch lines (Main Control Room → various areas):
- Maximum current: varies between 50-150 amperes
- Recommended cable: Copper cable with cross-sectional area of 10mm² (available in the Storage Depot)
- Voltage drop: 1.5-3.0% (must be within acceptable range)
"The cable specifications are sufficient," Lin Fan felt slightly relieved. "But we need to make a large number of connectors and terminals."
"Wang Tieniu can help," Captain Zhang said. "He worked in a factory before and knows how to make cable heads."
"Good. Start cable preparation tomorrow." Lin Fan noted it down.
In the early evening, good news came from Su Qingxue: the modem repair was successful.
"Power-on test passed," Su Qingxue said with a smile on her face. "Basic communication functions are normal, and the data transfer rate has reached 10Mbps, which is enough for the energy management system to use."
"That's great!" Lin Fan walked over excitedly. "Can it connect to our server?"
"We need to make an adapter interface, but it's technically feasible," Su Qingxue said. "Also, I found something useful on the control computer's hard drive."
"What?"
"Not data, but software." Su Qingxue connected the data pad. "Although the hard drive is partially damaged, some files were recovered. Among them is a 'Distributed Energy Monitoring System v1.0'. Although it's an older version, the basic framework is complete."
Lin Fan looked at the software interface on the screen—graphical display, real-time data, control buttons... This was exactly what they needed.
"System, analyze the usability of this software."
【Analyzing...】
Software name: Distributed Energy Monitoring System (DEMS v1.0)
Developer: National Energy Research Institute (2032)
Functions:
- Real-time data acquisition and display
- Historical data storage and query
- Basic control command transmission
- Alarm and event logging
- Report generation
Pros:
- Open source code, modifiable
- Modular design, easy to expand
- Supports multiple communication protocols
- Has complete documentation
Cons:
- Older version, some functions missing
- Does not support current latest hardware
- Weaker security
- Outdated interface
"Open source code..." Lin Fan's eyes lit up. "This means we can modify it ourselves. System, evaluate the workload required for modifications."
【Based on existing technical capabilities】
To adapt to current hardware and requirements, we need:
1. Modify drivers (to support our sensors and controllers)
2. Enhance security (add encryption and authentication)
3. Optimize interface (more intuitive and easy to use)
4. Add new functions (predictive scheduling, energy efficiency optimization, etc.)
Estimated workload: approximately 200-300 person-hours
If led by Su Qingxue, the basic version can be completed in 10-15 days
"That's acceptable," Lin Fan said. "At least we have a starting point."
Night fell, and the temperature plummeted again.
Inside The Camp tent, Lin Fan, Su Qingxue, and Captain Zhang sat together, with the unfolded energy system plan in the middle.
"Starting tomorrow, we will split up," Lin Fan assigned tasks. "Captain Zhang, you take people to continue collecting car batteries and start cable preparation work. Wang Tieniu is responsible for making cable connectors. Xiao Li will assist Su Qingxue in researching the DEMS software and begin modifications. I will be responsible for the valve retrofitting of the Geothermal Generator Prototype and overall coordination."
"Understood," the three replied in unison.
"One more thing," Su Qingxue said. "The decryption progress of the Quantum Storage Array broke through 11% last night. The newly unlocked information mentions a key function of the GN-1274 network: energy tide regulation."
"Energy tide?"
"Just like ocean tides, the geothermal energy inside the Earth also has periodic fluctuations," Su Qingxue brought up the data. "The network can predict and utilize these fluctuations, storing energy during peak times and releasing it during troughs. If our energy system can connect to this mechanism, the efficiency can be significantly improved."
"But we need a deeper understanding of the network," Lin Fan pondered. "This brings us back to the decryption progress. System, current decryption status."
【Quantum Storage Array decryption status】
Overall progress: 11.3%
Newly unlocked modules:
1. Energy tide prediction algorithm (partial)
2. Network topology map (partial)
3. Node functional description (basic)
4. Maintainer protocol (fragment)
Decryption speed: approximately 0.8-1.2%/day (may slow down as progress deepens)
"Keep up the decryption work," Lin Fan said. "This might be the key to whether our energy system can ultimately succeed."
At 21:00, Lin Fan stood alone at the edge of The Camp, looking out at the pitch-black snowfield.
The energy system plan was complete, and the next step was execution. Starting tomorrow, they would officially take the first step toward energy independence.
The snowfield was silent, but inside The Camp, the hum of the resonance separator was stable and continuous. The second energy core fragment was rotating in the machine, its purity increasing bit by bit. And in the tent, Su Qingxue had already begun studying the source code of the DEMS software, with lines of code scrolling down the screen like a waterfall.
