16
On the morning of the first day of dock construction, Shen Qingci stood on the beach of Bay Mouth, arranging six ironwood pile foundation materials in a row according to their length.
The longest one was nearly a zhang, and the shortest was more than half a zhang. Every single one had its bark peeled, its bottom sharpened, and its top smoothed with a planer.
Lu Xingyao stood nearby, holding the dock construction blueprint in his hand.
He marked the pile foundation positions on the beach with wooden stakes and hemp ropes—six points, arranged in a trapezoid, extending step by step from the high tide line to the deep water area.
The two points closest to the shore were the starting point of the trestle bridge, the middle two points were the mooring platforms, and the two points in the deepest part were the main dock platforms.
A thin bamboo pole was inserted at each point, tied with cloth strips of different colors.
He said, "Red is the starting pile, blue is the mooring pile, and yellow is the platform pile."
Shen Qingci looked at those bamboo poles.
The six bamboo poles swayed gently in the sea breeze, and the cloth strips fluttered in the same direction, all blowing toward the shore.
He said, "The wind direction is right. Today, when driving piles, the dust will blow toward the shore and won't get into our eyes."
He carried the first ironwood pile to the side of the red marked point, pressed his knee against the pile body, and held the pile head with both hands.
The ironwood was very heavy, and the weight of a single pile was nearly two hundred jin. When he lifted it, the veins on his neck bulged slightly, but his pace was very steady.
Xiao Ye ran out of the pigpen, ran to the beach, and stood beside the red marked point.
It looked at the wooden pile carried by Shen Qingci, and then looked back toward the pigpen.
The Wild Boar King walked leisurely out of the pigpen, stopped beside another wooden pile, and gently bumped the pile body with its shoulder, as if weighing it.
Then it let out a low grunt.
All the other wild boars in the pigpen came out, forming a single file and walking onto the beach.
Lu Xingyao squatted down to put a pack frame on Xiao Ye, and adjusted the tightness of the belly band.
He said, "The wood is too heavy, no need to carry it on the back. Pull it."
He added a tow rope behind the pack frame, with a piece of wood wrapped in waterproof cloth tied to the end of the rope.
Xiao Ye dragged the wood and walked a distance on the beach. The wood carved out a smooth drag mark on the wet sand, and the resistance was not big.
He said, "Dragging heavy objects on wet sand has a lower friction coefficient than dry sand. After the ebb tide, the water content of the beach is high, and the towing efficiency is the highest."
Shen Qingci inserted the first pile into the marked point and pressed it down with his knee.
He glanced at the queue of the Wild Boar Transport Team dragging the wood—Xiao Ye led the way in front, the Wild Boar King guarded the rear, and the rest of the pigs were in the middle, each dragging wood of various sizes.
The queue was neat, the speed was uniform, and it was as straight as the runway they trod out in the coconut grove.
He said, "The efficiency of the Wild Boar Transport Team has more than doubled compared to the first day. On the first day, they would still drift off course when dragging coconut shells, but now every single one knows its position."
Lu Xingyao flipped through his notebook.
On the first day of testing the Wild Boar Transport Team, a one-way trip from the Fruit Forest to the Camp took more than half a shichen, and the number of times they drifted off course was recorded several times.
Today is the first day of the dock project, and a one-way trip from the Forest Farm to the Bay Mouth took less than three quarters of an hour, with zero yaw.
He said, "The learning curve. Humans and animals are the same; when the number of repetitions increases, efficiency goes up."
Shen Qingci picked up the hammer and boat nails and began to fix the first pile.
The fixing method of the dock pile foundation was more complicated than the keel of the ship—the keel was laid horizontally, while the pile foundation was driven vertically into the sand layer, requiring a deep pit to be dug first to bury the pile, then filled with crushed stone and coarse sand, and finally connecting adjacent piles with crossbeams to form an overall framework.
He dug for nearly half a shichen, and stopped only when a grayish-black hard clay layer appeared beneath the sand layer.
He put the pile foundation in, calibrated the verticality with a level, and then filled with crushed stone, tamped it down, and erected crossbeams.
Lu Xingyao handed tools nearby: a hammer, boat nails, a level, and a bucket of crushed stone.
The timing of his handing over each item was stuck right before Shen Qingci reached out his hand, as if a prediction program was running in his brain.
After driving more than twenty boat nails, Shen Qingci stopped and said, "The speed at which you hand me nails today is faster than yesterday."
Lu Xingyao said, "I observed your construction rhythm. The interval between each process is regular, and I prepare the next tool in advance according to the pattern."
As he spoke, he opened his notebook and pointed to a simple flowchart drawn on it—pile driving, calibration, stone filling, tamping, beam erection, and nail driving, with the time consumption marked next to each step.
Shen Qingci looked at that flowchart and was silent for a moment.
He said, "You treat building a dock like an assembly line."
Lu Xingyao said, "Right. A dock is a larger project than the ship, and we can't rely on temporary reactions; we must rely on process management."
He turned the notebook to the next page, which showed a complete dock construction schedule. The completion status of each pile foundation was marked with a checkmark, uncompleted ones with hollow circles, and ongoing ones with semi-solid circles.
A checkmark was drawn in the status column of the first pile.
Shen Qingci switched the hammer to his left hand and patted Lu Xingyao on the shoulder with his right hand.
He said, "You've also routinized my work."
Lu Xingyao said, "It's not routinization. It's standardization. Any infrastructure project in the future can apply this set of processes."
Shen Qingci said, "Including building a lighthouse in the future."
Lu Xingyao said, "Yes. Including building a lighthouse in the future."
The bullet comments started flooding in from the moment the Wild Boar Transport Team lined up to enter the Forest Farm in the morning.
"The Wild Boar Transport Team has zero yaw!! They have completely adapted to the construction rhythm!!"
"Yaoyao drew a construction flowchart!! Every process is marked with time consumption!! He is managing dock building like software development!!"
"Captain Shen said it includes building a lighthouse in the future—he is already planning the next infrastructure project!!"
"Standardization!! Yaoyao is establishing a standardized process for island infrastructure!!"
Noon rest. Shen Qingci sat on the beach and rinsed the sweat off his face with fresh water.
Lu Xingyao sat beside him, spreading his notebook across his knees to update the construction log.
A sound of water came from the direction of the shallows. Little Hawksbill floated up from the Bay Mouth, holding a thick piece of driftwood in its mouth.
It swam to the side of the trestle bridge construction area, put the driftwood on the beach, and then nudged it toward the pile foundation with its snout.
The diameter and length of the driftwood were just right for making crossbeams for the mooring piles.
Lu Xingyao walked over, squatted down to take a look, and said, "This one is hardwood, not a tree species on our island. It drifted over from the open sea."
Little Hawksbill let out a short grunt and turned to swim toward the Bay Mouth.
After a while, it floated up again, this time holding a flat reef slab in its mouth.
The surface of the reef slab was flat and smooth, as if it had been polished by someone, with a few natural cracks on the edge, but it was intact overall.
It put the reef slab on the beach and pushed it to Lu Xingyao's feet with its snout.
Lu Xingyao looked down at the reef slab, and then looked at Little Hawksbill. He said, "You're salvaging building materials from the seabed."
Little Hawksbill blinked, turned around, and dived down for the third time.
This time it brought up a complete cluster of live coral, with a starfish hanging from the coral branches.
Lu Xingyao squatted down, gently took off the starfish and put it back into the water, and said to Hawksbill, "Coral cannot be moved. It is alive and is the forest of the seabed. Building materials should be things that have already fallen off—driftwood is okay, reef slabs are okay, but live coral is not."
Little Hawksbill tilted its huge head and let out a very soft grunt, as if expressing "Understood."
After it dived down for the fourth time, it never brought up any more coral.
What it brought up were all fallen reef slabs and driftwood smoothed by the waves.
Shen Qingci stood aside, watching the pile of reef slabs getting higher and higher on the beach.
He said, "Now it's not just a salvage worker; it's a building material purchaser."
Lu Xingyao said, "Its purchasing standards still need training, but the direction is right."
Shen Qingci said, "Today you taught it to distinguish between live coral and reef slabs, and tomorrow it can teach the Killer Whale."
Lu Xingyao thought for a moment and said, "Cross-species knowledge transmission. Little Hawksbill is the instructor."
Afternoon. The Golden Snub-nosed Monkey Group jumped down from the coconut grove, and the lead monkey was holding a few thin vines in its hand.
It jumped to the side of the trestle bridge construction area and handed the vines to Lu Xingyao.
Lu Xingyao took them and looked—the vines were fresh, with excellent toughness and uniform thickness, and each one was nearly a zhang long.
He said, "These are for tying crossbeams."
The Golden Snub-nosed Monkey nodded, turned around, and squeaked a few times toward the trees.
More than a dozen monkeys jumped down from the trees, each holding vines in its hands.
They lined up on the beach, handed the vines into Lu Xingyao's hands one by one, and then squatted aside to wait.
Lu Xingyao, holding an armful of vines, said, "You gathered vines today, not wild fruits."
The Golden Snub-nosed Monkey tilted its head and then pointed toward the trestle bridge construction site.
The meaning was—we saw you building things, and the vines are for you to build things with.
Shen Qingci pulled one out from the pile of vines and tested its tensile strength.
After being stressed, the vine stretched slightly and then stabilized without breaking, with a moderate elastic modulus.
He said, "It's softer than umbrella rope, but the tensile strength is enough. Using this to tie the crossbeams of the mooring piles is just right, and it won't easily cut into the wood."
He paused and said, "Monkeys deliver building materials. Hawksbill salvages stone slabs. Wild boars drag wood. Your cross-species construction team has opened up the building material supply chain."
Lu Xingyao squatted down to classify the vines by length; the long ones were used to tie crossbeams, and the short ones were used to weave fender pads.
Without raising his head, he said, "The supply chain was opened up by themselves. I just told Little Hawksbill not to move live coral."
Shen Qingci said, "You taught it rules. Rules are more useful than commands. A command can only be used once, but rules can be used for a lifetime."
Evening. The two pile foundations were completely fixed, the crossbeams were erected, and the framework of the trestle bridge starting point had taken shape.
Shen Qingci filled the pit of the second pile foundation with the last piece of crushed stone and tamped it down with a ramming hammer.
He straightened his waist and looked at the straight line on the beach extending from the main gate of the Camp to the Bay Mouth. The trestle bridge framework was taking shape bit by bit along the extension of this line.
He said, "Tomorrow we'll drive the middle two."
Lu Xingyao drew a checkmark in the status column of the second pile on the construction schedule.
Two piles, two checkmarks. There were still four hollow circles on the schedule.
He said, "At the current speed, it will take about a few days to complete all the pile foundations. Full completion should be about the same as the estimated construction period."
Shen Qingci closed the toolbox and stood up.
He said, "The Wild Boar Transport Team ran several trips today, and the towing distance of each pig added up to be able to circle the island several times. Add a handful of corn kernels to each of them tonight."
Lu Xingyao made a note in his notebook and said, "Performance bonus."
Shen Qingci said, "What?"
Lu Xingyao said, "Giving each pig an extra handful of corn kernels counts as a performance bonus. Overfulfilling the transportation task, distribution according to work."
Shen Qingci thought for a moment and said, "The Wild Boar King dragged twice as much wood as the other pigs, so give it two handfuls."
Lu Xingyao said, "Outstanding Employee Award."
Evening. Lu Xingyao added a few more lines to the door panel material list—Dock project: Started. Pile foundation construction: Part completed.
Supply chain: Wild Boar Transport Team tows wood, Little Hawksbill salvages reef slabs, Golden Snub-nosed Monkeys gather vines.
Construction progress: Advancing as planned.
He drew a circle next to "Supply Chain" and wrote two words inside the circle: Everyone.
He drew a star next to "Everyone".
Shen Qingci stood behind him, looking at the star, and said, "One."
Lu Xingyao said, "Everyone participated today, one is enough."
Shen Qingci took out the sharpened thin wooden needle from his pocket and carved a shallow notch next to the star.
He said, "This star plus a notch. The notch represents the pile foundation. In the future, every time a major node of an infrastructure project is completed, a notch will be carved on the door. When the dock is fully completed, there will be dozens of them here."
Lu Xingyao looked at the shallow mark left by the wooden needle on the door panel and said, "When did you sharpen another needle?"
Shen Qingci said, "Last night. While you were drawing the construction schedule, I was sharpening my knife nearby and sharpened this one by the way."
He put the wooden needle back into his pocket and said, "Carve navigation records on the ship's helm, and carve infrastructure records on the door panel. We need both records."
Lu Xingyao said, "The ship's helm is the tree ring of navigation, and the door panel is the tree ring of the Camp."
Shen Qingci nodded, "Right."
At this moment, the bullet comments reached their peak of the day.
"Full-staff supply chain!! Wild boars drag wood, Hawksbill salvages stone slabs, monkeys deliver vines!! The cross-species building material supply chain is officially operating!!"
"Yaoyao gave Little Hawksbill an environmental protection lesson—don't move live coral!! Little Hawksbill understood!!"
"Performance bonus!! The Wild Boar King drags twice as much wood, and its corn kernels are doubled too!! Yaoyao is paying performance wages to animals!!"
"Captain Shen is carving infrastructure records on the door panel!! The ship's helm is the tree ring of navigation, and the door panel is the tree ring of the Camp!!"
"The cross-species construction team has evolved into a cross-species supply chain management company!!"
In the Dragon Country National Destiny Command Hall, the screen in front of the Commander-in-Chief froze on the shallow mark carved by the thin wooden needle on the door panel.
The image was automatically enlarged by the ai system, and the star drawn by Lu Xingyao next to the notch could be seen.
The Commander-in-Chief picked up his thermos cup. He said, "They are carving infrastructure records on the door panel."
The staff officer said, "Yes. Navigation records are carved on the ship's helm, and infrastructure records are carved on the door panel. Two sets of recording systems, one person carves and one draws."
The Commander-in-Chief said, "When was the last time someone recorded infrastructure progress in this way?"
The staff officer thought for a moment and said, "Probably back when building the Great Wall in ancient times, artisans would carve their names and dates on the city bricks."
The Commander-in-Chief put down the thermos cup. He said, "Capture the image of that notch on the door panel and send it to the Ministry of Housing and Urban-Rural Development. Have them put this picture in this year's national infrastructure summary report. Let the title be—Another Way to Record Island Infrastructure."
