In the week after the plan was approved, the lights in the Yantai County Party Committee office building were lit almost every night until late at night.

Zhang Xiaojun set up the drafting group in the small meeting room of the county party committee, where several long tables were pieced together.

The walls were covered with maps of Yantai County, topographical maps of Hekou Town, distribution maps of mining areas in Qingshui Town, and comparison tables for thermal power plant equipment selection.

Piled on the tables were the Highway Engineering Technical Standards from the Provincial Department of Transportation, Thermal Power Construction Specifications from the Ministry of Electric Power, EIA Guidelines from the Provincial Department of Environmental Protection, and several thick stacks of energy consumption and traffic volume data for Handong Province over the past decade obtained from the Provincial Bureau of Statistics.

The copy machine rang from morning till night, and Wang Wenxue trotted through the corridor holding stacks of newly printed drafts.

Deputy Secretary Li Hongfei made two phone calls every day, morning and evening.

Over at the Restructuring Commission, a deputy director-general was designated to guide the drafting of their plan throughout the entire process, putting forward several specific requirements for the framework of the joint application: the two projects could not be written as two separate entities and must be strung together with a unified logical thread; the synergistic effect of energy and transportation must have quantitative calculations; it could not just talk about the benefits of Yantai County alone, but must clearly calculate the economic-pull effect on the four cities and one prefecture in the southeastern part of the province; the financing plan could not just list loan intentions, but must have a phased fund-in-place plan and an investment return analysis.

Deputy Secretary Li Hongfei recorded every requirement in a notebook, marked them item by item with a red pen, and then took them to the drafting group to revise them one by one against the requirements.

The financing plan managed by Zhang Faqiang was returned twice by the Restructuring Commission.

The first time, it was said that the investment return calculation was too optimistic, and he was asked to redo the sensitivity analysis by referencing the latest economic evaluation standards for thermal power projects released by the Ministry of Electric Power.

The second time, it was said that the risk-sharing mechanism for the syndicate loans was not clear enough, and it was requested to list item by item the underwriting proportion, guarantee conditions, and repayment sources of each bank.

Zhang Faqiang called the office of Wang Ziqing at CCB, and the two of them checked the data item by item across the microphone until late at night.

Qi Tongwei came to the meeting room every night.

He flipped through the plan from beginning to end, making notes in the margins with a red pen.

When flipping to the demonstration of construction necessity written by Zhang Xiaojun, he wrote a few words next to the item "improve regional transportation conditions": add "break through the logistics bottleneck at the junction of the three provinces and form a regional distribution center"; when flipping to the technical plan of the thermal power plant, he added a line after "circulating fluidized bed boiler": supplement coal quality adaptability data and a comparison table of desulfurization efficiency.

Seeing that the drafting group had written the environmental impact assessment too in principle, he put down his pen and said, "The EIA is not a mere formality; it is something that the ordinary people will examine with a magnifying glass once the project is implemented in the future."

He asked Zhang Xiaojun to retrieve the EIA reports of several large thermal power projects approved by the Provincial Department of Environmental Protection in the past three years, and improve them item by item by referencing their standards—atmospheric pollutant emission concentrations, wastewater treatment processes, comprehensive utilization schemes for ash and slag, and noise control measures.

Every single item had to have a specific process description and emission index.

Deputy County Magistrate Wang Zengyuan was responsible for drafting the preliminary route selection plan for the expressway section and the planning of dedicated water and power supply lines for the Industrial Park in the drafting group, and had barely closed his eyes for several consecutive days.

Deputy Secretary Li Hongfei organized these supplementary opinions into a new revision checklist and faxed it to that deputy director-general at the Restructuring Commission.

Two days later, a reply came back with only one line of words: "The plan framework is basically mature, and revisions can continue along this direction."

Deputy Secretary Li Hongfei placed the fax on Qi Tongwei's desk.

Qi Tongwei glanced at it and said, "Revisions will end this afternoon, the official draft will be printed tomorrow, and another Standing Committee meeting for final review will be held early the day after tomorrow."

On the day of the final review, the plan was bound into a thick volume, with "Comprehensive Energy Plan for the Hujing Expressway Hekou Interchange and Qingshui Town Thermal Power (Draft for Review)" printed on the cover.

Qi Tongwei flipped through it page by page and signed his name on the last page.

The Standing Committee passed it unanimously with full votes, without any opposition or reservation.

Director Deng Gui held an enamel mug, his fingers gently rubbing the cover of the plan.

He didn't open it, but just looked at it for a long time.

This old secretary who had stayed in Yantai for most of his life, having served from a township clerk to the director of the People's Congress, had seen the largest project being the renovation of a provincial highway.

Now the report in his hands was about an expressway and a thermal power plant.

Qi Tongwei closed the plan, his gaze sweeping across the faces of the standing committee members present.

"County Magistrate Zhang, you and I are going to the city immediately.

You are responsible for reporting to Mayor Zhang, and I will report to Municipal Party Committee Secretary Liu.

We will report simultaneously to strive for unified support from the city."

He asked Wang Wenxue to prepare the car immediately and urged Zhang Xiaojun to make two more copies of the plan to bring along.

That afternoon, the Santana drove out of the county party committee compound and headed along the provincial highway toward the urban area of Handong.

Outside the car window, the French parasol trees were bare.

Municipal Party Committee Secretary Liu's office was at the end of the third-floor corridor, with the window facing several old cedars in the municipal party committee compound, their needles shimmering with a deep dark green in the winter afternoon sunlight.

Secretary Liu sat behind his desk, with the thick plan just delivered by Qi Tongwei spread out in front of him, the corners of several pages already frayed from being flipped.

He took off his reading glasses, gently tapped his fingers on the cover, and remained silent for quite a while.

"Comrade Tongwei, this setup is not small.

An expressway plus a thermal power plant—taking either one out separately would be a major project at the municipal or even provincial level.

For Yantai, a single county, to bind the two together and push them forward, you know in your heart how difficult it is."

Qi Tongwei said that Yantai was willing to act as the vanguard, but the central army and the rear guard needed the city to hold the fort.

Secretary Liu reopened the plan to the pages on the thermal power plant, his fingers pausing on the line of words: "An annual power generation of about 3.6 billion kilowatt-hours, covering four cities and one prefecture in the southeastern part of Handong Province."

"The reporting content should be concise, and the core consists of three points—reasons for construction, feasibility demonstration, and financing plan.

The reasons for construction must calculate two accounts: one is the account of regional development, and the other is the account of industrial driving force.

The feasibility demonstration cannot just say that Yantai has coal; it must clearly explain the technical route, equipment selection, power grid access conditions, and environmental impact assessment, with hard data supporting every single link.

The financing plan cannot just list a few bank names, but must have investment return analysis, loan repayment capacity calculation, and phased fund-in-place plans.

At the municipal Standing Committee meeting, the standing committee members will ask questions from all angles.

You and Comrade Xiaojun must thoroughly understand the plan, and every single number must withstand questioning.

You go back and refine and familiarize yourself with the plan further.

Tomorrow morning at 8:30, at the municipal Standing Committee meeting, you and Comrade Xiaojun will attend as non-voting delegates and report face-to-face to all standing committee members."

The next morning, in the meeting room of the Handong Municipal Party Committee Standing Committee.

All eleven standing committee members were present in full.

On the wall in the exact center of the meeting room hung a map of the administrative divisions of Handong City, flanked by plaques reading "Unity, Pragmatism, and Efficiency".

Secretary Liu sat in the main seat, and Mayor Zhang beside him was opening the thick plan in front of him.

Secretary Liu announced the start of the meeting, getting straight to the point to say that today's only agenda item was to listen to the report of the Yantai County Party Committee on the Comprehensive Energy Plan for the Hujing Expressway Hekou Interchange and Qingshui Town Thermal Power.

He asked Qi Tongwei to make the report first, followed by Zhang Xiaojun with supplements, and then questions from the standing committee members.

Qi Tongwei stood up and walked to the whiteboard at the front of the meeting room.

He attached the geographical location map of Yantai County to the whiteboard with magnets, and Hekou Town was circled with a red pen.

"Secretary Liu, Mayor Zhang, and leaders, Hekou Town in Yantai County is located at the junction of three provinces: to the southwest is Sichuan Province, to the southeast is Zhejiang Province, and to the north it can reach Jingzhou via Songjiang County.

Currently, the planned route of the Handong section of the Hujing Expressway goes through Songjiang County.

If an interchange can be established in Hekou Town, with the expressway making a small detour to the south before heading north to Songjiang, Hekou Town will become the only expressway exit in the junction area of the three provinces.

This is not striving for an exit for Yantai County alone, but opening up a major passage leading to the southeast coastal region for the entire Handong Province.

Once Hekou Town gets connected to the expressway, the driving time from Yantai to the provincial capital Jingzhou will be greatly shortened, and the driving time to Shanghai will be shortened by several hours.

Those who benefit along the route will not only be Yantai County, but also hundreds of thousands of people in townships such as southern Songjiang County."

He turned to the page on feasibility demonstration—the Ministry of Transport already had precedents for similar fine-tuning, and it was completely feasible from an engineering perspective.

After the integration of Yantai Coal Industry, the annual output grew steadily, the coal quality was excellent, and the fuel cost of the thermal power plant was controllable.

The provincial branch of the Bank of Communications had issued a syndicate loan intention letter, and ICBC, CCB, ABC, and CMB all had the willingness to participate.

Zhang Xiaojun stood up to make a supplementary report.

Opening his notebook, he said that after detailed calculations, the increased engineering cost of the southern detour plan for the Hujing Expressway was about 200 million yuan, but after the completion of the Hekou Interchange, the logistics cost savings and the increased added value of agricultural products leaving the province alone could recover the detour cost within a few years.

The total investment of the first phase of the thermal power plant was about 1.8 billion yuan, among which Yantou Company and the county finance self-raised about 400 million yuan, syndicate loans were about 1 billion yuan, and the remaining 400 million yuan or so applied for the provincial electric power special fund and national energy construction funds.

After the completion of the project, the annual power generation revenue would be about 900 million yuan, and the annual net profit would be about 250 million yuan, which could cover all loan principal and interest within a few years.

Next was the questioning session.

Ma Jun, Secretary of the Municipal Commission for Discipline Inspection, spoke first.

Putting down his teacup, he said that he had read the plan carefully and it was indeed inspiring, but an investment scale of 1.8 billion also meant huge anti-corruption risks.

He asked Qi Tongwei what specific considerations there were in terms of risk prevention and control.

Qi Tongwei said that the county commission for discipline inspection had intervened in the entire process of drafting the plan in advance.

After the project was approved, a supervision group jointly composed of discipline inspection and supervision, audit, finance, and other departments would be established, and all bidding announcements, bid evaluation results, and fund disbursements would be made public simultaneously.

At the same time, he suggested that the Municipal Commission for Discipline Inspection carry out escalated supervision on the project and station discipline inspection and supervision officers in key links.

Executive Vice Mayor Huo Xiu, in charge of industry, turned to the page on the technical plan of the thermal power plant, and asked about the basis for equipment selection of the 2×300 megawatt circulating fluidized bed generator sets, as well as the requirements of such large units for coal quality stability.

Zhang Xiaojun replied that choosing circulating fluidized bed boilers was mainly for clean combustion—Yantai coal has a low sulfur content but a relatively high ash content.

Circulating fluidized bed boilers have high combustion efficiency, good desulfurization effects, and strong coal-type adaptability.

Currently, Dongfang Boiler Group and Harbin Boiler Company both had mature 300-megawatt-class products.

The Municipal Coal Bureau and Electric Power Bureau had conducted continuous tracking tests on coal quality, and core indicators such as calorific value and sulfur content could meet design requirements.

At the same time, there was another key reason for choosing circulating fluidized bed boilers—the Provincial Department of Environmental Protection clearly required that newly built thermal power plants must adopt clean combustion technology.

The circulating fluidized bed process could directly add limestone into the furnace for desulfurization with high desulfurization efficiency, eliminating the need to build a separate flue gas desulfurization device, which both reduced investment costs and saved land occupation.

Minister Peng Jun, head of the Organization Department, turned to the talent demand estimation table and said that the plan mentioned that the thermal power plant needed to reserve four major categories of technical talents in advance, asking how these talents would be resolved.

Qi Tongwei replied that it would be implemented in three steps—in the short term, through targeted commissioned training by the provincial electric power technical school starting from next spring; in the medium term, by introducing technical backbones with practical experience from the power system within the province through public recruitment; in the long term, by opening relevant majors in Yantai Vocational School to cultivate local talents.

"At the same time, to cooperate with the advancement of the project, we are prepared to add several key positions within the county specifically responsible for the specific promotion work of project implementation.

The allocation of these positions will be flexibly arranged according to work needs, with priority given to matching professional backgrounds."

Head of Publicity Department Ma Xiaoyan then asked about environmental public opinion risks—thermal power plant projects have high social attention and heavy environmental protection pressure, so how to strive for the initiative at the public opinion level?

Qi Tongwei replied that work would be done from two levels:

First, proactively publicizing environmental protection data, explaining clearly the desulfurization efficiency and emission standards of the circulating fluidized bed process, so that the ordinary people know that this power plant is not a high-pollution power plant in the traditional sense, but a modern power plant that complies with national clean production standards;

Second, combining Yantai's characteristic agriculture to create a brand image of "clean energy + green agriculture"—blueberries exported to the Netherlands, strawberries directly supplied to the provincial capital, and crayfish-paddy field co-culture.

These were all built on the basis of an excellent ecological environment and would not be damaged by a clean coal-fired power plant; instead, they would be better guaranteed for cold chain preservation due to stable power supply.

Standing committee member in military uniform Wu Jianshe took off his military cap and asked what impact the completion of the power plant would have on national defense mobilization.

Qi Tongwei said that the power system is an important part of the national defense mobilization system, and the wartime emergency power supply needs were considered during the project planning stage.

Multiple outgoing circuit loops were designed, ensuring that even if some of them were damaged, the power supply to key users could still be guaranteed.

Deputy Secretary Qian Shuwen of the Municipal Party Committee asked the last question.

He turned to the comprehensive benefit analysis table on the last page of the plan, and asked where the GDP scale of Yantai County would rank in the whole city around the year 2000 according to this plan.

Qi Tongwei replied that according to comprehensive calculations, the thermal power plant would annually contribute an industrial added value of about 700 million yuan, and the expressway would drive the growth of industries such as logistics, commerce, and tourism by about 500 million yuan.

Coupled with the existing coal industry, characteristic agriculture, and the Industrial Park under construction, it is conservatively estimated that Yantai County's GDP can enter the forefront of the city in a few years.

Mayor Zhang added that Handong City's total economic volume ranking in the province has always been relatively high, but development among counties within the province is still uneven.

If this batch of projects in Yantai succeeds, it can not only strive for advanced positions in the whole city, but more importantly, blaze a trail of resource-driven, transportation-first, and industry-follow-up for several relatively weak counties in the southeastern part of the city.

Secretary Liu announced the voting, and all standing committee members passed it unanimously.

"This plan is not only Yantai's plan, but also Handong City's plan.

The municipal party committee and Municipal Government give full support.

This afternoon, Mayor Zhang and I will go to the provincial capital Jingzhou to report separately to Provincial Party Committee Secretary Liang and Governor Zhao Lichun."

After the meeting, Qi Tongwei and Zhang Xiaojun walked out of the municipal party committee office building, and the December sunlight leaked through the branches and leaves of the cedars, falling on their shoulders.

From the county party committee to the municipal party committee, the plan was passed with unanimous votes.

The road from the city to the province would be traveled by Secretary Liu and Mayor Zhang.

Qi Tongwei got into the back seat of the Santana, took out his mobile phone, and called Deputy Secretary Li Hongfei, asking him to start contacting the docking channels with the ministries and the province.

Zhang Xiaojun said that there were still a few data points in the plan that needed to be re-verified tomorrow before going to the provincial capital to report, and he had already asked the editorial committee to prepare the materials.

The Santana drove out of the municipal party committee compound and headed toward Yantai along the provincial highway it came by.