16
At three o'clock in the afternoon, Qi Tongwei was in his office reviewing the monthly operational report just sent over by Yantai Coal Industry. When Zhang Liren knocked on the door and entered with a notebook in his hand, his back was still as straight as ever—the posture of someone coming from the Ministry of Transport Planning Department was already carved into his bones.
Qi Tongwei motioned for him to sit down on the sofa, took a bound outline of the plan from the drawer, and placed it on the coffee table.
The cover was printed with "Outline of the Hujing Expressway Hekou Interchange Plan", with the note below reading "Compiled by Yantai County Transportation Development Company, December 1996".
"Comrade Liren, the project for the Hujing Expressway to bypass Hekou Town has been officially approved, and the burden of the subsequent preliminary preparation work will mainly fall on your shoulders. This is the outline of the plan I drafted some time ago, divided into four parts: route comparison and selection with engineering and technical plans, investment estimation and financing plans, traffic demand forecasting and economic benefit analysis, and organizational structure and promotion timetable." Qi Tongwei sat down opposite Zhang Liren. "Take it back and read it carefully first; today we will discuss the framework of the outline first."
Zhang Liren took the outline with both hands and turned to the first page.
The route comparison section started from the north exit of Yantai County town and ended at the south entrance of Songjiang County, listing the mileage length, design speed, number of interchanges, and proportion of bridges and tunnels for both the original alignment and the southern detour plan, with detailed data for each item.
Qi Tongwei said that route comparison and selection is the foundation of the plan, and the ministry and the Provincial Department are most concerned about this—although the original alignment had a short mileage, it covered few people; whereas although the southern detour plan added more than ten kilometers, it covered Hekou Town, a transportation hub at the junction of three provinces, and also reserved a docking corridor for future east-west trunk roads.
He suggested that the Transportation Development Company commission the provincial transportation design institute as soon as possible to complete supplementary detailed geological surveys, figure out the distribution and bearing capacity of the soft soil layers along the southern detour plan, and ensure that the construction drawing design had a reliable geological basis.
"Although the southern detour plan increases construction costs, it is far superior to the original alignment in terms of covered population and reserved development space."
"You will lead the specific technical docking, and Li Gui from the Transportation Development Company will be responsible for organization," Qi Tongwei said.
After listening, Zhang Liren supplemented his suggestions from several angles: he suggested simultaneously commissioning a water conservancy design institute to conduct hydrological analysis and scour depth calculations for several bridges crossing the Qingshui River along the route, advancing them simultaneously with the detailed geological survey to avoid delays in the construction period caused by repeated later modifications of the drawings.
At the same time, he suggested that the Transportation Development Company connect with the technical review group of the planning division of the Provincial Department of Transportation in advance during the detailed survey stage, allowing experts to get involved early to reduce repetitions during later reviews.
Qi Tongwei wrote down these two points in his notebook and then turned to the investment estimation and financing plan section.
This plan adopted the financing framework of the Qingshui Thermal Power Plant, combining four parts: the Ministry of Transport special subsidy, the provincial transportation construction fund, syndicated loans, and local counterpart funds.
The total investment of the southern detour plan was about 200 million yuan, including about 70 million yuan in special subsidies from the Ministry of Transport, about 40 million yuan in the provincial transportation construction fund, about 60 million yuan in syndicated loans, and about 30 million yuan in self-raised matching funds by Yantai County.
"Among the 30 million yuan self-raised by Yantai, the Transportation Development Company's own funds are about 10 million yuan, and the remaining 20 million yuan or so will be leveraged through syndicated loans."
"The Transportation Development Company will use the toll revenue rights of the expressway after the completion of the Hekou Interchange as repayment guarantee."
"Regarding syndicated loans, the provincial branch of ICBC has issued a lead bank intention letter, and CCB and CMB have also agreed to participate. The overall financing structure is highly operable," Qi Tongwei said.
Zhang Liren made a suggestion: The special subsidy funds from the Ministry of Transport require the Yantai County Transportation Bureau to submit the engineering feasibility study report as soon as possible. After the preliminary review by the Provincial Department, it should be reported to the ministry for re-examination. He suggested formally submitting the feasibility study text to the Provincial Department of Transportation next week and simultaneously copying it to the ministry's planning division for preliminary review.
In addition, the specific terms of the syndicated loans need to be confirmed one by one with the provincial branches of several banks. He suggested arranging several coordination meetings for the syndicated loan to finalize terms such as the underwriting ratio, repayment period, and interest rate of the lead bank and participating banks in advance, striving to complete the official signing of the financing plan before the Spring Festival.
Qi Tongwei opened the third part of the outline, concerning traffic demand forecasting and economic benefit analysis.
This part cited the current base-year data provided by the provincial transportation planning survey and design institute, including original indicators such as the average daily traffic volume of the expressway, the proportion of trucks in the Hekou direction, and the transit freight turnover volume at the junction of the three provinces.
According to predictions, in the first year after completion, the average daily traffic volume of the Hekou Interchange can reach 6,000 vehicles, with trucks accounting for about 40%; ten years later, the average daily traffic volume is expected to exceed 10,000 vehicles.
"The southern detour plan adds an investment of about 200 million yuan compared with the original alignment, but the economic benefits after the completion of the Hekou Interchange are far more than the tolls themselves. Calculated according to current logistics costs, just the logistics cost savings alone after the completion of the Hekou Interchange can save surrounding enterprises about 30 million yuan each year."
"In addition, the improvement of transportation conditions will directly drive investment promotion in the Industrial Park and the outbound transportation of characteristic agricultural products, having a clear pulling effect on the county's economy," Qi Tongwei said.
Based on the original base-year data, Zhang Liren made a suggestion: Passenger and freight traffic volumes in the early stage of the completion of the southern detour plan may be lower than the predicted values, requiring an incubation period. He suggested supplementing a set of conservative prediction data as a reference plan;
but even according to conservative predictions, recovering the investment of the southern detour plan within a few years was a high-probability event.
Considering the uncertainty of future traffic volume growth, he suggested reserving conditions for future expansion during the design of the interchange: land acquisition for ramps should be based on the number of lanes in the future, and toll lanes should be constructed according to initial predicted values while reserving expansion space, so that land acquisition would not need to be repeated when expanding in the future.
The diversion design of passenger and freight vehicle lanes at the exit can be added to the detailed survey in advance, suggesting a reservation of three entries and five exits, and construction of two entries and three exits in the initial stage.
"Comrade Liren, starting from today, the Hujing Expressway Hekou Interchange project is officially handed over to you to lead and promote. You came from the Ministry of Transport Planning Department and are familiar with the approval procedures, technical standards, and financing models of expressway projects."
"Over in Hekou Town, Mayor Liu Qi graduated from Peking University majoring in urban and regional planning, and he is responsible for the planning of the Hekou Logistics Park. You two need to communicate more, and the connection between the expressway exit and the logistics park must not be disconnected."
"On the side of the Transportation Development Company, Li Gui is responsible for specific construction management and financial docking."
"You three have clear professional divisions of labor, but you must form a combined force," Qi Tongwei said.
Zhang Liren closed his notebook. The amount of information in this conversation was huge, but he had already sorted out the key work for the next phase.
He needed to complete the commissioning of the detailed geological survey and bridge hydrological analysis in the near future, promote the submission of the feasibility study text, prepare for the first syndicated loan coordination meeting, and maintain close horizontal communication with units such as Hekou Town.
"Secretary Qi, I will familiarize myself with the operation of the Transportation Development Company as soon as possible. I will strive to complete the first draft of the commission for hydrological analysis and detailed geological survey within three days, and I will start preparing for the syndicated loan coordination meeting next week. If there is anything in the future, I will report to you in a timely manner."
Qi Tongwei picked up his enamel mug, took a sip of water, and his tone shifted from serious to mild.
"Comrade Liren, you understand the principle that a single tree cannot prop up a house better than I do. When you encounter difficulties in your work, go to Comrade Zhang Xiaojun first. He is the county magistrate, and coordinating government-related matters is smoother for him. If you encounter something the county magistrate cannot solve, come directly to me." His tone was flat, as if he were talking about a very ordinary matter, but Zhang Liren understood—this had drawn a clear reporting chain for him, which both clarified Zhang Xiaojun's overall coordinating position as county magistrate and left an opening for reporting directly to the county party secretary.
"Secretary Qi, I've remembered it." He stood up to say goodbye and walked out of the office.
In the corridor, his footsteps were faster than when he came, and the corners of the outline in his hand had been slightly curled by his grip.
