On the sixteenth day of the first lunar month, just after the Lantern Festival, the work engine of Yantai County restarted its gears for the new year.

The pre-appointment talks that morning were a crucial move in the personnel adjustments, and over the following period, heads of various departments walked in and out of Qi Tongwei's office almost every day.

His work rhythm after the New Year was completely different from before—before the New Year, it was about laying the groundwork, finalizing plans, and running for approvals...

After the New Year, with the setup expanded, personnel in place, and the institutional framework established, the tasks for him as County Party Secretary became more focused: wherever a bottleneck occurred, he would call in the person in charge for a talk.

Before each talk, he had Wang Wenxue prepare the relevant materials in advance, spent an hour or two thoroughly reviewing them, and listed several core key points in his notebook.

Everyone called in for a talk walked out the door with a clear direction and a heavy sense of pressure.

Old Sun, Director of the Finance Bureau, was called in for a talk because the disbursement progress of agricultural support funds was lagging behind.

Qi Tongwei didn't criticize him. He simply pushed the spring plowing fund requirement statements submitted by the Agriculture Bureau and Water Resources Bureau in front of him, having him report item by item against the agricultural support fund disbursement ledger which projects had arrived and which hadn't.

Halfway through his report, Old Sun couldn't sit still anymore. He said he would go back immediately to re-verify the disbursement progress and disburse all lagging funds within two days. Qi Tongwei didn't keep him, but drew two lines in his notebook for disbursed and undisbursed projects respectively.

Later, back at the Finance Bureau, Old Sun gathered all heads of relevant sections for a full-day coordination meeting, re-examined the disbursement timeline for each agricultural support fund, and by the third day, the funds began arriving sequentially in the accounts of township ABC branches.

Old Zhou, Director of the Agriculture Bureau, was called in for a talk because technical guidance for the strawberry base couldn't keep up.

He said several newly joined growers in Shanghe Village didn't master greenhouse temperature control technology well, and the Agriculture Bureau's technicians were understaffed and couldn't cover everyone. Upon hearing this, Qi Tongwei directly called the Yantai technical station of the Provincial Academy of Agricultural Sciences, coordinating two experts on the spot for short-term stationing support.

After hanging up, he told Old Zhou that if technicians were insufficient, they could borrow them from the province, but if strawberries rotted in the field because technical guidance lagged, then the Agriculture Bureau was failing the people's trust.

After returning, Old Zhou took two technicians and stayed directly in the greenhouse area of Shanghe Village. During the day, they squatted in the furrows teaching farmers step-by-step how to adjust temperature control equipment, and at night, they made door-to-door follow-up visits, not returning to the county seat for several days straight.

Old Han, Director of the Land Resources Bureau, was one of those whom Qi Tongwei took the initiative to talk with after the New Year.

Land approval for two major projects—the Industrial Park and the expressway—entered a critical stage, but the Land Resources Bureau had been slow in preparing land acquisition materials for several key plots.

Qi Tongwei did not directly criticize Old Han during their talk. Instead, he laid the project node timetables submitted by the Department of Transportation and the Industrial Park Management Committee on the desk, asking him to confirm line-by-line the nodes where the Land Resources Bureau needed to cooperate.

"If the land acquisition materials for these plots are delayed any further, Phase One of the Industrial Park will miss the spring construction window, and the Hekou Interchange on the expressway will also be affected. I didn't set these nodes; they were calculated backward from the project progress. Go back, explain this account clearly to the comrades in the bureau, and assign responsibility to specific individuals."

Upon returning, Old Han held a three-day mobilization meeting at the Land Resources Bureau, breaking down each section's tasks to specific responsible persons. He also personally led a work team on several trips to the Provincial Department for material pre-examination, managing to advance the land acquisition approval cycle by over ten days.

...

In early March, the nationwide Strike Hard campaign, which had lasted nearly a year, officially came to a close.

The Ministry of Public Security held a summary commendation conference at the Great Hall of the People, comprehensively announcing the campaign's results.

In this concentrated strike action—the largest in scale and strongest in intensity since Reform and Opening-Up—nearly one million criminal cases were solved nationwide, over 800,000 criminal suspects were arrested, tens of thousands of criminal gangs were broken up, and hundreds of thousands of firearms were seized.

The nationwide criminal case occurrence rate dropped by nearly 30% year-on-year, and the major/extraordinary case occurrence rate dropped by over 40%.

Handong Province was named an advanced province in the Strike Hard campaign. Yantai County had intercepted over sixty fugitives from other provinces and cities during the campaign, many of whom were involved in homicide cases. This achievement was written into Handong Province's Strike Hard summary report and promoted statewide as a typical case of "promoting Strike Hard effectiveness through public security baseline construction." The Central Political and Legal Affairs Commission specifically commended a batch of Strike Hard advanced units, and Yantai County made the list.

Zheng Changhe called from the Provincial Department and briefly said, "The commendation from the Central Political and Legal Affairs Commission has come down, and Yantai County made the list. Keep up the good work on your end. Both principal leaders, Comrades Liang and Zhao in the province, are keeping an eye on it."

Qi Tongwei expressed his thanks for the leadership's concern, then buried his head back into reviewing the pile of documents on his desk.

Commendation was recognition, but not a full stop—the social security baseline needed long-term maintenance, and this string could not be loosened.

On March 8th, Zhang Faqiang knocked on the door of Qi Tongwei's office, an unsuppressible excitement on his face—the renovation project for the six-story integrated complex building in Qingshui Town Industrial Park was fully completed, passed inspection, and officially put into use.

Qi Tongwei put on his jacket and accompanied him to the site.

The building was located in the core plot of the park, with a total construction area of nearly two thousand square meters, integrating four major functions: administrative management, technological R&D, business negotiations, and park services.

The first floor housed the Park Management Committee and Investment Promotion Service Center; the second and third floors were shared office areas for park enterprises; the entire fourth floor was the permanent office for the Qingshuizhen Thermal Power Plant Preparatory Group; the fifth floor was the Tech R&D Center and Expert Workstation; the sixth floor was the multi-function conference hall and archive room.

Zhang Faqiang led him floor by floor, walking from the sandbox model in the investment hall to the cubicles of the preparatory group on the fourth floor, and looking down over the entire park from the rooftop.

The steel structure plant of the bauxite beneficiation plant had been topped out, the rotary kiln foundation for the new dry-process cement production line was being poured, and the roadbed for several dedicated mine roads in the distance had taken shape, with bulldozers pushing the last section of rough road toward the unloading platform of the beneficiation plant.

Standing at the edge of the rooftop, Zhang Faqiang pointed to the newly leveled land in the distance and said, "Secretary Qi, over there is reserved for the ceramics Industrial Park. Once the thermal power plant goes into operation and electricity prices drop, the high-temperature tunnel kiln can be launched." Qi Tongwei held the railing and looked for a long time, then turned around and patted Zhang Faqiang's shoulder: "The building is complete, and the management committee is moving in. Next, it depends on how you bring in enterprises and push projects forward."

On March 12th, even bigger news arrived.

Phase One of Qingshuizhen Thermal Power Plant officially passed approval. The 2×300 MW circulating fluidized bed generator unit installation plan and total investment scale of 1.8 billion yuan completed joint review and approval across provincial and ministerial departments including economic restructuring, power, and environmental protection.

Executive Vice Governor Wang Hong personally presided over the approval coordination meeting, and matching funds from the Provincial Electric Power Bureau and the newly established State Power Corporation were confirmed in place simultaneously.

When the news reached Yantai, Li Xueli called Qi Tongwei immediately, unable to conceal her excitement: "Secretary Qi, everything is approved, and matching funds are in place!"

On March 14th, Qingshuizhen Thermal Power Co., Ltd. was officially registered.

The registered capital was 30 million yuan: Yantai County Investment Development Co., Ltd. contributed 18 million yuan, holding a 60% stake; Qingshui Town took a 10% stake valued at 3 million yuan through land equity; Handong Provincial Electric Power Bureau contributed 3 million yuan for a 10% stake; and State Power Corporation contributed 6 million yuan for a 20% stake.

This was the first large-scale project in Yantai County's history jointly invested by four levels of government—central, provincial, county, and town—and also the county's first state-owned holding company with a registered capital reaching the 30 million yuan level.

At the preparatory group's routine work meeting that day, Qi Tongwei said: "Company registration finishes the legal procedures, but the real hard battle—equipment bidding, survey and design, site preparation—has just begun."

Li Xueli led over sixty members of the preparatory group into the fourth floor of the integrated complex building that afternoon. When Chief Engineer Liu Quanmin walked into the new office holding a stack of technical materials, he stood at the door for quite a while before placing the materials on the desk, sitting down, opening the first page, and beginning to review the boiler equipment technical parameters item by item.

On March 15th, the mobilization meeting for land acquisition and demolition for the Yantai Section of the Shanghai-Beijing Expressway Southern Bypass Scheme was held in Hekou Town.

Zhang Liren stood on a temporary rostrum, behind him a huge engineering route map. The southern bypass route marked in red went all the way north from Yantai County town, took a bend in Hekou Town, and then went further north to Songjiang.

Below the stage stood local residents from several villages along the route in Hekou Town. Some held children, while others rushed over straight from the fields carrying hoes. Their eyes all focused in unison on the Hekou Interchange circled in red on the route map—the first expressway exit about to rise on the land where their ancestors had lived for generations.

After the mobilization meeting, land acquisition and demolition work was launched first.

On the day of signing the land compensation agreements, several households in Hekou Town took the initiative to vacate their homesteads. Town cadres helped move furniture and dismantle old houses, and the vacated land was swiftly leveled into temporary construction roads.

Right after, construction bidding for the Yantai Section of the Shanghai-Beijing Expressway was launched simultaneously.

Yantai County Transportation Development Company had completed drafting the bidding documents and submitted them to the Provincial Department of Transportation for approval.

This Yantai Section of the Shanghai-Beijing Expressway project, over ten kilometers in total length and including one interchange and one bridge at Hekou, had a total investment budget of approximately 200 million yuan. It was the largest infrastructure investment in Yantai's history, and upon completion, would open an expressway corridor directly connecting Yantai to the Yangtze River Delta.

Once news broke, numerous enterprises from inside and outside the province with large-scale road and bridge construction qualifications sent letters expressing intent to bid.

In the bidding office set up by the Transportation Development Company in the Industrial Park complex building, telephone rings echoed non-stop. Several technicians responsible for reviewing bidding documents worked overtime for several consecutive nights, organizing and archiving the pre-qualification materials of each construction enterprise one by one.

At the pre-bidding meeting, Zhang Liren said to Li Gui: "This is the largest engineering investment in Yantai's history. Every technical specification and contract clause in the bidding documents must withstand scrutiny; when audits look back in the future, there cannot be any flaws." Li Gui placed the construction bidding management rules issued by the Provincial Department of Transportation under the glass top of his desk, repeatedly revising against the bidding group's draft line by line, the ashtray on his desk piled high with cigarette butts.

In March, good news broke one after another in Yantai like spring thunder.

The Industrial Park complex building was put into use, thermal power plant approval passed, company registered, funds secured, team moved in, expressway broke ground, and construction bidding was about to start.

At the mid-March Standing Committee meeting, Qi Tongwei said calmly: "These things are just a beginning.

Building the complex is to bring in enterprises; registering the company is to land the projects; starting expressway construction is so Yantai's goods can be shipped out faster.

This year's task is heavier than last year's; we cannot slacken on any item."

Outside the window, on the branches of the sycamore trees, new buds already densely covered the treetops, as the air of spring grew thick.