In early April, with the spring breeze blowing strongly and warmth sweeping across the Handong land, the wave of reform and opening-up continued to surge in the hinterland of the Central Plains, making infrastructure construction an important engine to drive the local economy and boost national development.

Outside the bidding hall of the Handong Provincial Department of Transportation, several French parasol trees were densely covered with new leaves on their branches, and the tender green exuded vibrant vitality.

Sunlight leaked through the overlapping gaps of the leaves and fell on the clean cement steps, paving a layer of fine golden spots like a handful of scattered seeds of hope, foreshadowing the extraordinariness and busyness of this spring.

Inside the hall, however, it was a scene of tension, order, and bustling activity.

Zhang Liren, Li Gui, and the staff of the Traffic Development Company were making the final sprint preparations before the bid opening against time—the experts of the evaluation committee had long been in place on time, and thick qualification review materials and evaluation standards were placed in front of each person;

The staff held document bags and checked the sealing status of the bid documents and the payment list of bid bonds one by one for the last time, not daring to be the slightest bit careless, after all, this was a key link in the key transportation projects of Handong Province in 1997, and every step was related to fairness and justice, as well as the quality and speed of project implementation;

At the same time, all recording equipment and cameras were debugged and in place, with the lenses aimed at the front desk, to record the entire process of this important bid opening meeting related to the development of Yantai, which was not only to standardize the process, but also to demonstrate the determination of openness and transparency to all participants and the people of the whole county.

At this time, China was in the acceleration period of infrastructure construction.

As an important part of the national "five vertical and seven horizontal" highway network, the construction of the Yantai Section of the Shanghai-Beijing Expressway was of utmost importance, and therefore this bid opening meeting attracted much attention.

According to the relevant regulations of national bidding and tendering management in 1997, the Provincial Department of Transportation strictly followed the principle of "openness, fairness, and justice" during the pre-qualification stage, and received registration materials from a total of seven bidding enterprises.

The Provincial Department of Transportation received registration materials from a total of seven bidding enterprises during the pre-qualification stage.

After strict qualification original document verification, similar project performance review, and on-site inspection, a total of five enterprises passed the pre-qualification.

...

After the public bidding quotation and the comprehensive scoring by the evaluation committee, the tenderer announced the winning results on the spot based on the principle of fairness and justice.

"Bid Section A—China Road and Bridge Corporation!" Zhang Liren announced on the podium.

Bid Section A was the part with the highest technical difficulty in the Yantai Section, with a total length of nearly six kilometers, including two ramp bridges of the Hekou Interchange and a bridge crossing the Qingshui River, with an estimated contract price of 82 million yuan.

The project manager of China Road and Bridge stood up from his seat and slightly bowed—this enterprise had participated in national key projects such as the Beijing-Tianjin-Tanggu Expressway, Jinan-Qingdao Expressway, and Shanghai-Nanjing Expressway, and every performance item in its qualification documents was attached with a complete completion acceptance report.

"Bid Section B—Provincial Road and Bridge Group!" Bid Section B had a total length of about five kilometers, mainly consisting of subgrades and culverts, with an estimated contract price of 65 million yuan.

"Bid Section C—Handong Province Highway Engineering Corporation!" Bid Section C had a total length of about four kilometers, mainly for expressway connecting lines and ancillary facilities, with an estimated contract price of 53 million yuan.

Li Gui handed the three bid-winning notification letters to the representatives of the three enterprises respectively, and then announced that the bid winners must organize construction strictly in accordance with the construction period and quality standards stipulated in the bidding documents, and the performance bond would be officially deposited after the construction contract is signed.

Just as Zhang Liren was about to announce the successful conclusion of the bid opening meeting, Qi Tongwei slowly stood up from his seat.

Today, he was wearing a navy blue Zhongshan suit, with the collar button fastened tightly, an upright posture, and a solemn expression.

Every move of his exuded calmness and competence, which was also the most representative dressing style of grassroots leading cadres at that time—concise, solemn, and pragmatic.

He walked to the front unhurriedly, his gaze calmly sweeping across the faces of the representatives of the three enterprises one by one.

In his eyes, there was approval, expectation, and an unquestionable firmness.

"First of all, congratulations to the three units for winning in this bidding.

The Yantai Section of the Shanghai-Beijing Expressway is a national key transportation project and the largest infrastructure investment in the history of Yantai County.

After opening to traffic, it will open up a major direct channel from Yantai to the Yangtze River Delta, fundamentally improving the county's transportation infrastructure conditions.

China Road and Bridge, Provincial Road and Bridge, and Handong Highway are all renowned construction enterprises within the province and even across the country, with strong technical force and rich management experience.

Handing over the Yantai Section to you to build gives the common people peace of mind."

His tone suddenly changed, his voice not loud but exceptionally weighty,

"I emphasize a few points:

First, Yantai welcomes all law-abiding and integrity-conscious enterprises.

Whether they are central enterprises, provincial enterprises, or local enterprises, as long as they abide by the bidding rules and keep their contract commitments, the county government will clear the way all the way and fully cooperate.

Second, those commitments signed before bidding—no subcontracting, no illegal subcontracting, no shoddy work and use of inferior materials—must be fulfilled item by item after winning the bid.

The performance bond must be deposited in full, the work must be done exactly as the contract is signed, and there is zero tolerance for quality issues.

Third, after the Yantai Section of the Shanghai-Beijing Expressway opens to traffic, Yantai will have more key projects.

If this batch of projects is done well, you will be the preferred partners in the future."

He paused and glanced around at the enterprise representatives and experts sitting in the audience.

"The stage has been set, and the good show is yet to come.

I hope everyone present will join us in playing this play well."

There was a brief silence in the audience, and then applause rang out from the front row, quickly drowning out the entire hall.

After the bid opening meeting, the Construction Headquarters of the Yantai Section of the Shanghai-Beijing Expressway was officially established.

The headquarters was located on the third floor of the Industrial Park Comprehensive Building, with Zhang Liren serving as the commander-in-chief, Hekou Town Mayor Liu Qi serving as the deputy commander-in-chief, and Guofeng, the executive deputy mayor of Hekou Town, transferred to serve as the director of the headquarters office, responsible for daily coordination and engineering progress management.

That afternoon, the headquarters held its first construction coordination meeting.

The three construction units set up project departments respectively on the construction site, and engineering vehicles and machinery drove along the newly paved construction access road into the planned area of the Hekou Interchange.

...

While the highway bidding was settled, the survey and design bidding and generator set equipment bidding for the Qingshuizhen Thermal Power Plant were also being promoted intensively.

According to the project approval process, the survey and design bidding and generator set bidding of the thermal power plant were respectively entrusted to bidding agency institutions recognized by the Ministry of Electric Power Industry for public bidding.

Once the news was released, several large domestic electric power design institutes and power equipment manufacturing enterprises rushed to action upon hearing the news—the Northwest Electric Power Design Institute, Central-South Electric Power Design Institute, and East China Electric Power Design Institute all bought the survey and design bidding documents;

Dongfang Electric Group, Harbin Electric Corporation, and Shanghai Electric Group eyed the big cake of generator sets, and successively sent people to Yantai for on-site inspections.

Some technicians stayed in Qingshui Town for several days, photographing the coal quality analysis reports and detailed geological survey data page by page to take them back to make technical plans.

Li Xueli sat in her new office, and the phone rang from morning till night.

There were old leaders from the Provincial Electric Power Bureau calling to recommend tactfully, people pulling strings to find a certain bureau chief in the county to probe the waters privately, and others taking many detours to hand notes to Zhang Xiaojun's desk.

As soon as Li Xueli came to Yantai, she had her patience honed by Qi Tongwei's words "if you can't beat them, join them".

She registered all the greeting calls one by one in her notebook, recording whose note it was, whose connection it was, and which unit was strongly recommended, item by item clearly, and then reported to Qi Tongwei.

Qi Tongwei opened Li Xueli's notebook and flipped through two pages, only asking whether the procedures had been followed.

Li Xueli said that everything was being bided and filed according to procedures, and announcements, pre-qualification, and bid evaluation were all under way.

Qi Tongwei closed the notebook and said unhurriedly: "Tell those who called to do things according to procedures.

Qualification review, plan evaluation, quotation comparison and selection—all links are open and transparent, and who wins the bid in the end depends on the evaluation conclusion of the evaluation committee."

"Doing things according to procedures" became the standard reply to fend off relationships from all sides.

Li Xueli had it on her lips every day and used this tone with everyone—neither refusing nor promising, but no one's face could intervene procedurally.

In the end, the Northwest Electric Power Design Institute won the survey and design bidding with a better circulating fluidized bed boiler coal blending combustion optimization scheme and rich design experience for large thermal power plants under complex geological conditions;

the generator set bidding was won by Dongfang Electric Group, whose 300 MW CFB unit had slightly better operational stability and thermal efficiency than the other two bidders, and the main technical parameters and delivery cycle of the equipment were highly matched with the coal quality characteristics of the Yantai Coal Mine.

On the day she received the bid-winning notification letter, Li Xueli pointed out the sun-facing office on the fourth floor to the project leader of the Northwest Electric Power Design Institute, telling him that the personnel cooperating with the design in the future would work here.

The other party said that the survey team would enter the site next week, and the prelude to a power plant moving from paper to reality thus kicked off.

...

At the time when the expressway construction started and the thermal power plant bidding was implemented, Yantai's investment promotion also ushered in a new round of boom.

In mid-April, an inspection team from Minmetals Group arrived in Yantai.

This inspection team was led by the deputy general manager of the Investment Development Department of Minmetals Group, and its members included technical experts from the Nonferrous Metals Business Department and several industry analysts.

They had come specifically to inspect after hearing about the kaolin reserves and the supporting planning of the Industrial Park.

Qi Tongwei and Zhang Xiaojun received the inspection team in the county party committee conference room.

On the table were spread the kaolin vein distribution map transferred from the provincial geological exploration team, as well as the land use planning and transportation route map of the Industrial Park.

Lin Junjie opened his notebook and introduced the reserves, grade, whiteness, and mining conditions of kaolin item by item to the members of the inspection team—these data had already been organized during the planning of the Industrial Park last year, but this was the first time he led a team to face an inspection team at the central enterprise level after taking office as the head of the Investment Promotion Bureau, and he felt both confident and cautious.

In the subsequent on-site inspection, the technicians of Minmetals Group personally went down to the mining area to take samples, used portable instruments to measure several mining points, and gave very high evaluations of the whiteness and processability of kaolin.

The fine ceramics Industrial Park plot already reserved by the Industrial Park and the logistics advantages of the expressway exit also made the inspection team full of confidence in the project prospects.

At the end of the inspection, Minmetals Group decided to invest 60 million yuan to build an annual output of 100,000 tons of kaolin selected processing production line in the Qingshuizhen Industrial Park, used to supply domestic high-end ceramics and paper industries.

Lin Junjie immediately asked the counterpart section of the Investment Promotion Bureau to draft an investment intention letter overnight, referring item by item to the contract templates previously signed with the Gaobang Group and Dutch merchants, and came up with a detailed plan in terms of land prices, tax incentives, and employment subsidies, which was delivered to the desk of the project leader of Minmetals Group early the next morning.

Following the footsteps of Minmetals Group, Guangdong Province's Hongyu Ceramics also decided to invest 30 million yuan to establish a ceramic tile production base in Yantai.

What Hongyu Ceramics favored was the superimposed advantage of Yantai's kaolin resources and the low electricity prices after the future thermal power plant went into production—the freight for directly transporting raw kaolin ore from the mining area to the Industrial Park was lower than that of sourcing ore from other provinces, the industrial electricity price after the thermal power plant went into production was expected to be controlled within 70% of the provincial grid electricity price, and the logistics time from Foshan to Yantai would also be significantly shortened after the expressway opened to traffic.

Lin Junjie calculated these points one by one for the other party at the negotiating table, with clear data and rigorous logic, and the representative of Hongyu Ceramics made a decision on the spot.

...

At the end of April, Yantai Cement was also officially put into production and launched on the market.

After more than a month of equipment linkage debugging and trial production of the new dry-process cement production line in the Qingshuizhen Industrial Park, when the first batch of bagged cement was unloaded from the rotary kiln, it still carried residual heat and was hauled away by several large trucks waiting at the factory gate, transported to various construction sites inside the Industrial Park and the county town's building materials market respectively.

The construction of the Industrial Park itself consumed a large amount of cement; the construction usage of the bauxite beneficiation plant and the new building materials processing area alone was enough for the cement plant to produce at full steam for more than half a year.

This batch of cement no longer relied on private mining and indiscriminate extraction to sell cheaply for a living like it did before rectification.

Instead, it was bagged, weighed, and issued with warehouse outbound orders methodically bag by bag.

The whole process was well-ordered, and certificates of conformity bearing the "Yantai" label began to appear in major building materials markets across Handong Province.

In less than a month, the expressway headquarters was listed and operating, the thermal power plant design and equipment both won the bids, the Minmetals Group kaolin deep processing project landed, the Hongyu Ceramics production base settled, and Yantai Cement was officially put on the market.

In April in Yantai, every task was running at an accelerated pace on its respective track, while Qi Tongwei was sitting in the county party committee office, looking at the dense new leaves on the branches of the French parasol trees outside the window—the grand curtain had already been raised...