January 25, 1998, Qingshui Town.

Qingshuizhen Thermal Power Plant is situated on the second-order terrace on the northern bank of the Qingshui River, about 3 kilometers south of Qingshui Town, backing onto the provincial highway to the north, and bordering the Yantai Service Area of the Hujing Expressway to the east. Its transportation conditions are second to none among thermal power projects of the same level within the province.

The plant covers an area of about 680 mu. The main factory building, cooling tower, chimney, and step-up substation of Phase I are concentrated in the east-central part of the plant area, while the west and north sides have reserved enough construction land for Phase II and Phase III to accommodate two sets of generating units of the same scale.

A year ago, this place was still a barren slope overgrown with thatch. When the bulldozers first entered the site, Party Secretary Zhang Yongjian led several village cadres to go door-to-door doing ideological work, telling everyone that the largest factory in the entire county would be built here in the future.

At that time, someone asked him just how big this factory would be. Standing on the top of the slope, he pointed and drew a circle around his feet, saying that everything from here to the poplar forest by the Qingshui River was part of it.

Now that poplar forest still stands by the river, while the barren slope behind it has been leveled, compacted, and paved with crisscrossing roads and pipelines.

Surrounding the plant area is a 20-meter-wide green belt planted entirely with Chinese privet trees, boasting dense crowns and evergreen foliage all year round.

Pushing outward by another 10 meters is a ginkgo tree belt. In the winter, their bare branches gently sway in the cold wind, but in the coming spring they will sprout new leaves, and in the autumn they will pave a golden ring road around the plant.

The design plans for these two green belts were initially marked as "Optional" by the Northwest Electric Power Design Institute. During the joint review, Li Xueli used a red pen to write two words next to it: "Modified". Not only did she change the greening plan, but she also casually drew a half-circle of dashed lines on the Phase II reserved land—when Phase II is launched in the future, the green belt will be transplanted rather than chopped down, and all the privet and ginkgo trees will be moved to the new plant boundary line to continue standing guard.

She did not explain this detail much at the meeting, but the engineers sitting across from the design institute that day all remembered it in their hearts: This female deputy county magistrate is not just here to hold a nominal title.

At 6:00 in the early morning, the plant area was brightly lit.

Inside the main factory building, the steam turbine of Unit 1 had completed warm-up, and the steam parameters of the boiler were steadily held at their rated values.

In the central control room, more a dozen instrument panels were arranged in an arc, with green numbers jumping across the screens.

Chief Engineer Liu Quanmin sat in front of the main control console, and in the thermos cup at his hand brewed tea so dark it looked black, with so many tea leaves that the water was barely visible.

He had sat in this position for the entire night last night, leading three core technicians to go through the final pre-grid-connection check from start to finish, confirming the status of every valve, every set of excitation parameters, and every protection setting one by one with the on-site inspectors via walkie-talkie.

Plant Director Yang Zhibin kept his eyes fixed on the turbine speed curve, Wu Shuangfeng had the flowchart of the boiler system spread out before him, and Zhang Xiangyang had his left hand resting next to the closing button of the synchronizing device while his right hand unconsciously stroked the unshaved stubble on his chin from the past two days.

Although the young people had not closed their eyes all night, their spirits were more excited than ever—when they graduated from the School of Energy and Power Engineering at Jiaotong University a year ago, as the first batch of undergraduates after the restoration, they received the newly versioned graduation certificates, but what they held back in their hearts was the drive of the older generation of Jiaotong University people to "keep their word" in the energy field.

Three years ago, they had performed grid connection simulations countless times in the laboratory of the School of Energy and Power Engineering at Jiaotong University, but today it was for real.

At 9:00 in the morning, a motorcade drove in from the direction of the county seat.

Leading the way were two police motorcycles, followed by a motorcade of black Audis from the provincial and municipal governments.

Executive Vice Governor Wang Hong stepped out of the second car, followed by the director of the Provincial Commission for Restructuring the Economic System, the director of the Provincial Electric Power Bureau, and representatives from the Provincial Environmental Protection Bureau.

Huo Xiu followed closely behind with the heads of the corresponding municipal departments.

Further behind were a deputy director-general from the State Commission for Restructuring the Economic System and a chief engineer from the State Power Corporation—these two had flown in specially from Beijing yesterday, and their presence alone demonstrated the weight of this project at the national level: a county-run thermal power plant took only 9 months from project initiation to grid connection, a speed that has no precedent throughout the entire "Ninth Five-Year Plan" power construction program.

Qi Tongwei and Zhang Xiaojun stood at the entrance of the plant to welcome them, backed by Li Xueli, Party Secretary Zhang Yongjian, Executive Deputy Director Li Jianguo, Lin Hai, as well as the project chief designer from the Northwest Electric Power Design Institute and the general construction commander of Zhongyuan No. 1 Thermal Power Construction.

A row of viewing stands was temporarily set up on the square in front of the main factory building, covered with dark blue tablecloths, and several rows of folding chairs were placed in front of the stands.

After Executive Vice Governor Wang Hong and the director of the Provincial Electric Power Bureau took their seats on the stage, the deputy director-general of the State Commission for Restructuring the Economic System spoke first.

He was in his early fifties with graying hair, speaking with a heavy Shandong accent, but his thoughts were clear and without any redundant bureaucratic jargon.

"The Phase I project of the Qingshuizhen Thermal Power Plant took 9 months from breaking ground in April 1997 to the grid-connected power generation of Unit 1 today. What kind of speed is this? I will give you a reference frame: during the Ninth Five-Year Plan period, the average construction cycle of newly built thermal power projects nationwide was 27 months."

"27 months, and you used 9 months."

"This is not only the thermal power project with the fastest construction speed I have ever seen, but also the only project among the national pilot programs for power investment system reform led by the State Commission for Restructuring the Economic System last year that completed its annual targets ahead of schedule." He paused, his gaze sweeping across the construction workers in overalls below the stage, "When the Restructuring Commission included Qingshui Town in the pilot program back then, what it valued was not the financial strength of Yantai County, nor the transportation conditions of Qingshui Town, but your institutional design of 'the government sets up the stage, enterprises sing the play, and professionals do professional work'."

"Practice has proven that this mechanism is effective."

"It is hoped that after Unit 1 operates stably, you will initiate the installation and commissioning of Unit 2 as soon as possible, continuing to provide replicable experience for the reform of county-level energy investment systems nationwide."

Next was the speech by the chief engineer of the State Power Corporation.

He was a few years younger than the deputy director-general from the Restructuring Commission, wore rimless glasses, spoke at a fast pace, and tossed about professional terminology with ease.

"Unit 1 of the Qingshui Thermal Power Plant is a 300,000-kilowatt subcritical coal-fired generating unit. The main engine is supplied by Dongfang Electric, the control system adopts the Siemens DCS distributed control system, and the desulfurization device is built simultaneously according to the latest national environmental protection standards."

"After arriving at the site yesterday afternoon, I went through the installation records together with the comrades from the Northwest Institute."

"The steam turbine casing closure succeeded on the first attempt, the boiler hydraulic test passed on the first try, and the generator rotor insertion was completed in place on the first try—three 'firsts' are rare in the history of national thermal power construction. What does this indicate? It shows that the coordination between design and construction has reached a very high level, and it demonstrates that the engineering management capability of the owner can completely rival the power plants of the top five power generation groups."

"The State Power Corporation hopes that the Qingshui Thermal Power Plant will continue to maintain this standard during the operation stage, providing stable and reliable power support for the power grid."

Executive Vice Governor Wang Hong spoke last. When he stood up, he first glanced at the towering chimney of the main factory building before speaking.

"Comrades, the Qingshuizhen Thermal Power Plant is the first county-run thermal power project completed and connected to the grid in Handong Province during the Ninth Five-Year Plan period, and it is currently the only energy project in the province built under the leadership of a county-level investment platform."

"In 1997, the GDP of Yantai County grew from 197 million to 583 million, and fiscal revenue grew from 21.73 million to 50.23 million. Behind these two figures are the contributions of Yantai Cement, the driving force of the Hujing Expressway, and the support of specialty agriculture, but more importantly—Yantai County has forged a virtuous cycle of 'attracting industries with infrastructure, gathering capital with industries, and feeding back infrastructure with capital'."

"If this path continues to be walked down, the Qingshui Thermal Power Plant will be the energy heart of Yantai County."

He turned to the operating personnel in blue overalls below the stage, raising his voice by a notch: "It is hoped that all cadres and workers of the Qingshui Thermal Power Plant will carry forward the striving spirit of the construction period, ensure the safe and stable operation of Unit 1, ensure the on-schedule commissioning of Unit 2, and provide an inexhaustible driving force for the economic and social development of Handong Province."

As the speech ended, applause echoed over the plant area.

Li Xueli stood up from the command seat on the side of the viewing stand.

Today she was wearing a dark blue padded work jacket, the same style as the operating personnel, with a few drops of oil stains on her cuffs—which she had rubbed against while checking the synchronization device parameters together with Plant Director Yang Zhibin in the central control room just now.

But her hair was neatly combed into a low bun, wearing light makeup, and standing in front of a group of leaders in suits, she showed no timidity at all.

Holding a walkie-talkie in her hand, her gaze swept across the viewing stand and finally fell on the face of Chief Engineer Liu Quanmin. Chief Engineer Liu Quanmin nodded to her through the glass of the central control room.

"Attention all stations, the grid connection operation for Unit 1 is now starting."

"Execute item by item according to the grid connection operation ticket."

Her voice was transmitted through the walkie-talkie to the central control room and the turbine room, clear, steady, and without any redundant syllables.

This grid connection operation ticket had been carefully hammered out word by word by her and Chief Engineer Liu Quanmin the afternoon before yesterday. It had a total of thirty-seven steps, with the execution standards, allowable errors, and emergency measures for each step clearly marked.

The designer from the Northwest Institute looked at it and said it was too conservative, and the construction team leader of Zhongyuan No. 1 Thermal Power Construction looked at it and said it was too wordy. She did not change it, only replying with one sentence: "You build houses according to the design drawings, and I save lives according to the operation ticket."

Inside the central control room, Plant Director Yang Zhibin closely watched the turbine speed curve.

The rotational speed slowly climbed starting from 500 revolutions per minute during the warm-up stage, and every speed step had corresponding vibration limits and tile temperature protection setting values.

When the rotational speed rose to 2,500 revolutions per minute, Wu Shuangfeng reported: "The boiler main steam temperature is 538 degrees Celsius, the pressure is 16.7 megapascals, and the parameters are stable."

Zhang Xiangyang's gaze was locked onto the three parameters on the synchronizer's display screen: generator outlet voltage, frequency, and phase angle.

The moment the turbine rotational speed stabilized at 3,000 revolutions per minute, the generator outlet voltage rose to the rated value and remained stable, the frequency was firmly locked at 50 Hz, and the phase angle deviation dropped within the allowable range, the synchronizer automatically captured the grid-connection window.

"Synchronous closing."

Zhang Xiangyang pressed the button.

The grid-connection indicator light on the main control console lit up, a green light spot jumped once on the instrument panel, and then steadily stopped.

The pointer of the active power meter for Generator No. 1 began to slowly move to the right—starting from zero and rising upward.

"Grid connection successful."

Zhang Xiangyang's voice was transmitted outside the main turbine building through the central control room's loudspeaker, followed immediately by an irrepressible cheer that spread from one work station to the entire central control room, then to the main turbine building, and then to the plaza.

Li Xueli did not cheer.

She stood in place, looked at the flickering green indicator light on the walkie-talkie, took a deep breath, and then raised the walkie-talkie, her voice still steady: "Unit No. 1 has been connected to the grid.

Each post shall execute load ramping according to the trial operation procedures, adding 5 megawatts of load every 15 minutes, and pay attention to monitoring turbine vibration, generator stator temperature, and cooling water flow.

If any abnormality is found, directly cut the load without needing to ask for instructions."

She put down the walkie-talkie, turned to the leaders on the viewing platform, and bowed slightly to indicate that the grid connection was successful.

For the next hour, the atmosphere in the central control room shifted from wild joy to intense focus.

Plant Director Yang Zhibin reported the parameters every 10 minutes: the generator active power steadily increased, the tile temperatures of all turbine bearings were within the normal range, the generator stator coil temperature was lower than the alarm value, the cooling water flow was stable, and the boiler main steam parameters were normal.

Chief Engineer Liu Quanmin remained seated in front of the main control console, his thermos having been refilled with boiling water twice, and the tea leaves washed out until only a pale yellow remained, but he had never left that position.

He had thirty years of operation experience and knew that a successful grid connection was only the first step, and the operation data of the next hour was the key to judging whether a unit could "stand firm."

At 10:30 in the morning, the load climbed to the rated load.

When Plant Director Yang Zhibin reported the last set of parameters, there was finally a trace of undisguisable excitement in his voice.

Chief Engineer Liu Quanmin stood up, walked to the door of the central control room, and gave Li Xueli a thumbs-up.

Li Xueli turned her head and said to the leaders on the viewing platform: "Grid connection successful, all operation indicators of Unit No. 1 are normal."

Applause rang out again, longer and more enthusiastic than before.

The construction captain of Zhongyuan Yihuo took off his safety helmet and patted it hard twice, several engineers from the Northwest Electric Power Design Institute shook hands with each other, and someone patted Plant Director Yang Zhibin on the shoulder, knocking him back half a step.

At 2:00 in the afternoon, a symposium was held in Meeting Room No. 1.

This was the largest meeting room in the auxiliary building of the main turbine building, having been renovated not long ago, and the air still retained a faint smell of latex paint.

On the wall were pasted the bird's-eye view rendering of the Qingshui Thermal Power Plant and the Phase I project progress Gantt chart, the conference table was covered with a white cloth, and in front of each person was a bottle of mineral water and a printed special report.

Li Xueli gave a special report on behalf of Qingshuizhen Thermal Power Plant.

She stood in front of the projection screen, holding a telescopic pointer in her hand, and the first slide projected on the screen was the project progress comparison table.

"The Phase I project of Qingshuizhen Thermal Power Plant has an installed capacity of 2 × 300,000 kilowatts, with a total full-cycle investment of 1.8 billion yuan."

Unit No. 1 broke ground on April 15, 1997, and was connected to the grid for power generation on January 25, 1998, with a construction period of 9 months and 10 days.

The average construction period of domestic thermal power units of the same level in the same period was 27 months, and we are ahead of schedule by 17 months."

Someone in the audience softly took a breath.

Although they had already heard the deputy director-general of the Restructuring Commission mention this figure in the morning, seeing the two contrasting progress bars on the screen at this moment still made people feel incredible.

"This speed was not achieved by compressing safety and quality standards."

Li Xueli turned to the next page—the quality acceptance statistical table, "During the construction of Unit No. 1, the turbine casing closure succeeded on the first try, the boiler hydraulic test passed on the first try, and the generator rotor threading was in place on the first try.

The installation of all three major main engines met the standards on the first try.

Northwest Electric Power Design Institute adopted a modular drawing issuance scheme during the construction drawing design stage, changing the conventional serial drawing issuance to parallel drawing issuance according to construction zones, shortening the design cycle by about 40% compared with conventional projects.

Zhongyuan Yihuo adopted the slipform construction technology in civil engineering construction, shortening the main turbine building framework construction period by about one-third.

The owner, the designer, and the constructor worked jointly in the office, and site problems were not left overnight—this is our first piece of experience."

She turned to the third page, which showed the organizational chart.

"The second piece of experience: professional people do professional things.

Chief Engineer Liu Quanmin has thirty years of operation and management experience, participated deeply in design optimization throughout the entire process, and is the chief engineering and technical director of the project.

The three technical backbones Plant Director Yang Zhibin, Wu Shuangfeng, and Zhang Xiangyang are the first batch of undergraduate graduates after the restoration of the School of Energy and Power Engineering of Jiaotong University, responsible for the three major specialties of turbines, boilers, and electrical respectively, and independently holding posts throughout the whole process from equipment installation to commissioning and grid connection.

Qingshuizhen Town government dispatched special forces to complete land acquisition, demolition, and external coordination work, ensuring that the construction progress was not affected by external factors.

Party Secretary Qi of the county party committee gave the power plant construction team impromptu discretionary power from the very beginning—major technical changes encountered during the construction process did not need to go through the conventional layer-by-layer approval process, and could be executed with the joint signatures of Chief Engineer Liu Quanmin and Plant Director Li Xueli.

This mechanism bought us nearly a month of time at least in the two key technical decisions of changing the cooling tower pile foundation plan and adjusting the boiler steel frame hoisting plan."

Her tone was very flat, but everyone present knew what it meant to delegate approval power from the county level to the on-site technical leader within the system in 1997—this meant that a county party committee secretary had already handed over both credit and responsibility to the people doing the work before the project started.

She turned to the last page, which showed the reverse-scheduled work plan for Unit No. 2.

"Unit No. 2 has currently completed the hoisting of the boiler steel frame, and is expected to complete installation and commissioning before June 30, 1998, meeting the conditions for grid connection.

After being put into operation, Qingshui Thermal Power Plant's annual power generation will reach about 3.6 billion kilowatt-hours, which will not only meet the electricity demand of Yantai County and surrounding areas, but also transmit outward through the provincial power grid."

When the report ended, warm applause rang out in the meeting room.

Next was the free-speech session.

Executive Vice Governor Wang Hong stood up first; without using a microphone, he turned around directly to look at the construction personnel and power plant staff in the audience.

"This morning's visit really opened my eyes.

Building a 300,000-kilowatt unit in 9 months—this speed is number one in the whole country.

But more importantly, I noticed the ginkgo and privet trees on the periphery of your plant area—planting ginkgo trees around a power plant is something I have seen for the first time in all my years working in the power system.

This is not ordinary greening; this is putting an 'ecological necklace' on the thermal power plant.

Production efficiency and ecological construction must both be attended to; this experience must be promoted in the provincial thermal power system."

He paused, his gaze falling on Li Xueli, "By the way, when I drove over along the county road and township road just now, the road surface quality was more than a notch better than when I came last year—the progress of Yantai County's infrastructure construction surprised me."

Deputy Secretary Li Hongfei clenched his fists under the table, his fingertips gently pressing against his palms, seemingly accepting this praise on behalf of Yantai County.

Huo Xiu immediately followed up: "Yantai's experience can be summarized into three things: professional people, discretionary power, and specialized mechanisms.

The Restructuring Commission gave the reform pilot project, and Yantai County seized this opportunity.

They not only built roads, but also built a power plant.

I propose to compile this experience into a special report and submit it upwards."

The symposium lasted until 4:00 p.m.

After the meeting, Executive Deputy Director Li Jianguo led several Zhongyuan Yihuo engineers who had not had time to tour the entire plant on a walk around the plant area, specially taking them to see those two circles of greenbelts.

The privet trees were planted this autumn and have now taken root; the ginkgo trees still have bare branches, but their trunks are straight and evenly spaced. Executive Deputy Director Li Jianguo said that these trees were laid out and positioned one by one around the plant area, and every single one was planted at the position marked on the design drawings with a deviation of less than 5 centimeters.

Mayor Liu Qi and Zhou Guofeng each followed several groups of guests outward, hearing praises about the road conditions all the way.

When the last batch of guests was seen off, the setting sun had already fallen onto the ridge on the opposite bank of Qingshui River, the lights in the plant area began to light up, and the operating parameters of Unit No. 1 in the central control room were still jumping regularly.

The red slogan on the wall reading "Professional people do professional things" was particularly eye-catching in the afterglow of the setting sun.