16
On February 5, 1999, Kechuang Building in the High-Tech Zone of Jingzhou City.
Secretary Zhao Xiaohui stood in front of the window in the fifth-floor corridor, looking at the row of bare ginkgo trees downstairs.
From the establishment of the Software Park preparation group in August last year until today, it had been exactly half a year.
Half a year ago, this floor was still under renovation, and the sound of electric drills shook the entire building. Zheng Lili rolled up her sleeves and ran back and forth in the corridor, and Li Bin, wearing a tie, worked overtime until late at night on his very first day back from Silicon Valley.
Now, all forty-two desks were fully occupied, the nameplates of IBM and Accenture were firmly planted on the master plan of the Software Park, and equipment installation had already begun in the baseband chip laboratory of Great Wall Electronics.
She pushed open the office door to find Zheng Lili standing at the entrance holding a folder, her eyes slightly red.
"Director Zhao, I have organized your handover checklist. The Phase II planning of the Software Park, the follow-up services for the stationing of IBM and Accenture, and the progress tracking of the Great Wall Electronics laboratory—every item comes with detailed descriptions and liaison persons."
Secretary Zhao Xiaohui took the folder, flipped through a few pages, looked up at Zheng Lili, and said, "You've done a great job. With you here at the Software Park, I can rest assured."
Zheng Lili nodded forcefully, suddenly stepped forward to hug her, and said, "Sister Xiaohui, you must come back to see us."
Secretary Zhao Xiaohui patted her back and said, "Of course, Yuntai District is not far from Jingzhou."
Lin Xue, director of the Second Cadre Division of the Organization Department of the Provincial Party Committee, accompanied Secretary Zhao Xiaohui to Haizhou.
As the car drove out of Kechuang Building, Secretary Zhao Xiaohui glanced back at the building, which shimmered with a light gray luster in the winter sunshine.
On February 8, in the conference room on the ninth floor of Provincial Investment Building.
The enlarged executive meeting of Provincial Investment Group deliberated on the feasibility study report for the maritime handong.
The oval conference table was covered with dark green baize, and a newly drawn coastal industry planning map of Handong Province hung on the wall. The location of Fangyang Town was circled several times with a red pen, accompanied by notes illustrating the layout of four sectors: ports, railways, petrochemical refining, and steel.
Qi Tongwei sat at the head of the conference table, with Secretary Tang Yuan, General Manager Hu Yunfeng, Vice President Zhang Xinquan, and Li Shengyuan seated in order. Minister Wang Xiaoni of the Finance Department, Minister Chen Fan of the Personnel Department, Section Chief Chen Siyuan of the Legal and Risk Control Department, Luo Xiaopeng of the Investment Development Department, and Chen Ruirui, who had just rushed back from Haizhou, were all present.
Wang Wenxue sat next to Luo Xiaopeng, with the final draft of the feasibility study report, which had been repeatedly revised for nearly two months, spread out before him.
Qi Tongwei announced the start of the meeting and first asked Chen Ruirui to report on the asset verification results of the Haizhou Port Authority.
Chen Ruirui stood up, opened the verification report, and announced the data based on the benchmark date of December 31, 1998:
The fixed assets of the Haizhou Port Authority amounted to 3.21 billion yuan, mainly including terminal berths, port machinery, port area buildings, channel facilities, and completed infrastructure projects in the Xugou and Miaoling port areas, some of which were built with Japanese yen loans.
Total liabilities were 1.67 billion yuan, of which about 295 million yuan were policy-based loans from the China Development Bank, and the rest were infrastructure loans and operational debts from the Construction Bank and Industrial and Commercial Bank. Some historical debts were being connected with Cinda Asset Management Company for stripping plans.
Net assets were about 1.84 billion yuan, with a debt-to-asset ratio of 52.1%.
A marginal profit of 109,000 yuan was achieved for the whole year of 1998, making it the only profitable year among the six years from 1994 to 1999.
It should be specially noted that among the existing terminal berths, there were only two deep-water berths of 10,000-ton class or above, both built in the early 1980s. Their designed throughput capacity was severely inadequate, and the equipment aging rate exceeded 60%.
The average age of port operation vessels such as tugboats and pilot boats exceeded twenty years.
The area of the rear yard was insufficient, the grade of collection and distribution highways was relatively low, and the dedicated railway line had not yet been connected to the port area.
Although the asset scale of the Port Authority was large, the proportion of assets sunk in obsolete equipment and inefficient berths was relatively high, and its profitability was extremely weak. It urgently needed to introduce incremental funds through restructuring to activate stock assets.
She closed the report and added that the Haizhou Municipal Committee and Municipal Government attached great importance to the restructuring of the Port Authority and had officially issued a document agreeing to establish the Haizhou Port Group Co., Ltd. based on the Port Authority.
Provincial Investment Group would participate by means of cash capital contribution, with a shareholding ratio not exceeding 40%.
Provincial Investment Group planned to dispatch a deputy general manager to the Port Group to be in charge of finance, investment, and financing work, and recommended comrade Chen Ruirui to serve as the minister of the Finance Department of the Port Group, responsible for post-restructuring financial system construction and fund management.
She suggested establishing a preparation working group for Haizhou Port Group at the level of Provincial Investment Group to initiate asset evaluation and restructuring plan design as soon as possible.
Qi Tongwei nodded and said, "Comrade Chen Ruirui's asset verification has been very effective. With the family fortune figured out, the next step of restructuring will have a basis."
The asset scale of the Port Authority is not small, but its profitability is too weak. The key lies in the structural contradiction of the stock assets—a high proportion of obsolete equipment, insufficient deep-water berths, and an uncoordinated collection and distribution system.
Restructuring is not simply changing a signboard; it is about activating the sunk assets through the introduction of capital and management from Provincial Investment Group.
It is recommended to designate her as the asset connection commissioner in the preparation working group, responsible for subsequent evaluation and transfer work.
Then he announced the entry into today's core topic—deliberating on the feasibility study report for the maritime handong, which would be reported by Luo Xiaopeng.
Luo Xiaopeng stood up, walked to the whiteboard in front of the conference room, and unfolded a newly printed report outline.
The report was jointly prepared by him and Wang Wenxue. After being repeatedly revised through several drafts, the final version was nearly one hundred pages long and divided into three parts, covering the entire chain of planning from port construction to industrial layout.
"The core positioning of the Maritime Handong Strategy is to rely on the superior deep-water shoreline resources and vast saline-alkali land space of Fangyang Town, Haizhou City, to build a 100-million-ton comprehensive hub port, undertake the coal transshipment function of the Shanxi coal southern exit corridor, and simultaneously build a 10-million-ton petroleum refining and chemical base and a 20-million-ton high-quality steel base. This will elevate Haizhou Port from a regional port serving Handong Province to the eastern starting point of the New Eurasian Land Bridge, becoming the most convenient sea outlet for China's central and western regions to the Pacific Ocean."
He turned to the first part, the core of which was port construction and coal transshipment functions.
Taking the upcoming Haizhou Port Group as a platform, Provincial Investment Group would contribute with cash and industrial resources, holding no more than 40% of the shares, while the Haizhou Municipal Government would contribute with the evaluated net assets of the Port Authority, holding about 55% of the shares, and the remaining 5% or more would be reserved for the port operation team and industrial chain strategic partners.
A 10-million-ton specialized coal terminal would be newly built in Fangyang Town, including two 100,000-ton coal berths and one 50,000-ton coal berth, supported by a fully enclosed coal yard and an automated loading and unloading system. The designed annual throughput capacity is 30 million tons in the near term and 50 million tons in the long term, with an estimated total investment of about 2.4 billion yuan and a construction period of 30 months.
At the same time, the preliminary planning and design of a 300,000-ton crude oil terminal would be initiated, reserving shoreline and rear land areas to support the large refining and chemical project.
In terms of transportation support, a coastal highway connecting Fangyang Town to the coastal expressway would be built, with a total length of about 28 kilometers, meeting the standard of a two-way four-lane first-class highway, with a total investment of about 600 million yuan. The preliminary survey and design work for the dedicated railway line in the port area would be started simultaneously, striving to be completed and put into use synchronously with the coal terminal.
He paused slightly to ensure that all the ministers present followed his train of thought, and then turned to the second part.
The core of this part was the construction of the petroleum refining and chemical base and the steel base. The estimated investment for the 300,000-ton crude oil terminal was about 1.8 billion yuan, with a construction period of 24 months, which could be promoted synchronously with the refining and chemical project.
The 10-million-ton petroleum refining and chemical base is planned to cover an area of about 8 square kilometers. The first phase will construct a 10-million-ton/year oil refining unit and an 800,000-ton/year ethylene cracking unit, adopting the process route of atmospheric and vacuum distillation plus heavy oil catalytic cracking plus delayed coking. Main products include gasoline, diesel, aviation kerosene, chemical light oil, and benzene, toluene, and xylene (three benzene), with an estimated total investment of about 16 billion yuan and a construction period of 36 months.
"Regarding the investment promotion strategy for the refining and chemical project, I would like to add a few points."
Luo Xiaopeng turned the projection to the investment promotion strategy page of the refining and chemical sector, "It is recommended to focus on introducing Jinling Petrochemical and Yangtze Petrochemical under Sinopec. After the major reorganization of the national petroleum and petrochemical industry in 1998, both Jinling Petrochemical and Yangtze Petrochemical were uniformly placed under the management of Sinopec. Refining and chemical enterprises that previously belonged to different ministries, commissions, and localities have now been integrated into the same group, clearing institutional obstacles for subsequent in-depth cooperation."
"Jinling Petrochemical has accumulated decades of technical foundation in crude oil refining and refined oil production, and Yangtze Petrochemical possesses domestic leading process packages and operational experience in the fields of ethylene cracking and aromatics joint units. Their refining and chemical technology reserves and industrial chain supporting capabilities can provide complete technical and talent support for the Fangyang Town refining and chemical base."
"Provincial Investment Group will participate in the construction and operation of the refining and chemical project through cash equity participation, with the equity participation ratio controlled between 20% and 30%, without seeking controlling rights, mainly playing the role of a capital bond and resource coordination—Provincial Investment Group is responsible for infrastructure support such as ports, highways, and railways, while Sinopec is responsible for the technical plan, construction, operation, and product sales of the refining and chemical project."
This mode not only allows Sinopec to maintain its dominance over the refining and chemical projects, but also allows the Provincial Investment Group to share the project's benefits through equity participation, while ensuring that the refining and chemical production capacity of Fangyang Town prioritizes meeting the demand for refined oil and chemical raw materials in Handong Province and surrounding areas.
As for the specific cooperation framework, it is recommended that the Provincial Planning Commission take the lead, in conjunction with the Development Planning Department of Sinopec, Jinling Petrochemical, and Yangtze Petrochemical, to launch the scheme demonstration and site selection inspection work for the joint venture company as soon as possible."
He then reported on the planning of the steel base: The twenty-million-ton high-quality steel base is planned to cover an area of about 12 square kilometers, with the first phase constructing 5 million tons per year of hot-rolled thin plates and 2 million tons per year of cold-rolled thin plates; the products are positioned as high-strength automotive steel and home appliance steel, with a total estimated investment of about 28 billion yuan and a construction period of 36 months.
The investment in these two projects is huge, requiring policy support from the state and the province; Great Wall Bank can provide startup funds of no less than 10 billion yuan for the preliminary investment in infrastructure construction such as ports.
He turned to the third part, which is about industrial agglomeration and urban supporting facility construction.
Relying on the refining and chemical base to develop downstream fine chemicals, new materials, and textile and chemical fiber industries, a complete petrochemical industry chain is formed; relying on the steel base to develop downstream auto parts, machinery manufacturing, and metal products industries, a complete steel deep-processing industry chain is formed; supporting the construction of Fangyang New Urban District, including public service facilities such as staff living quarters, schools, hospitals, and commercial complexes, with a total estimated investment of about 4 billion yuan.
The total investment scale of the entire Maritime Handong Strategy is about 53 billion yuan, starting from port construction, moving on to the successive commissioning of refining and chemical and steel projects, and then to the initial scale of the industrial agglomeration zone, with a construction period of about ten years, advancing in three stages: near-term, mid-term, and long-term.
He turned to the financing plan chapter and added: "In terms of the financing architecture, a diversified model of'startup funds + bank credit + direct financing in the capital market' is adopted.
The near-term startup phase takes the 10 billion yuan startup funds of Great Wall Bank as the lead, with the Provincial Investment Group matching a contribution of about 3 billion yuan, injecting a total of 13 billion yuan in capital into the Port Group and project companies, and on this basis applying for syndicate loans from the China Development Bank and the four major state-owned commercial banks, which is expected to leverage bank credit of no less than 20 billion yuan.
For the listing location, it is recommended to prioritize the Hong Kong Stock Exchange — Great Wall Bank is headquartered in Hong Kong and is very familiar with the Hong Kong stock listing review process and regulatory requirements, and can serve as the sponsor and lead underwriter for the H-share listing of the Port Group, while assisting in introducing internationally renowned institutions such as HSBC and Citigroup as cornerstone investors.
Listing on the Hong Kong stock market can not only raise international capital, but also enhance the brand image and credit rating of the Port Group in the international capital market, laying the foundation for subsequent overseas bond issuance and cross-border M&A.
The raised funds will be specially used for the subsequent construction of the crude oil terminal, refining and chemical base, and steel base.
The listing of the Port Group can not only provide continuous capital supplement for the Maritime Handong Strategy, but also realize the preservation and appreciation of state-owned assets through the pricing mechanism of the capital market, while providing an exit channel for the 3 billion yuan capital invested by the Provincial Investment Group in the early stage.
At that time, the equity of the Port Group held by the Provincial Investment Group will realize value reassessment through the listing, which not only guarantees the strategic control of the Provincial Investment Group over the Port Group, but also realizes a virtuous cycle of state-owned capital."
Luo Xiaopeng finished his report, closed the outline, and placed it on the conference table.
The meeting room was quiet for a moment, and then the ministers of various departments began to ask questions in turn.
Minister Wang Xiaoni of the Finance Department was the first to speak. With the investment estimation table of the feasibility study report spread out in front of her, she asked two key questions: The total investment is estimated at 53 billion yuan, and the near-term startup phase calculated at 30% is also about 16 billion yuan; where are the 10 billion yuan startup funds provided by Great Wall Bank mainly invested?
How heavy is the financing pressure on the Provincial Investment Group?
What level is the asset-liability ratio of the Port Group controlled at, and is there a timetable for the financial compliance work before listing?
Luo Xiaopeng opened the investment estimation table of the report and said that the 10 billion yuan of funds from Great Wall Bank are specially used for port construction and coastal defense highways — 2.4 billion yuan for the coal terminal, 0.6 billion yuan for the coastal defense highway, and 1.8 billion yuan for the crude oil terminal; these 4.8 billion yuan are the core infrastructure investment in the first phase of the near term.
The remaining 5.2 billion yuan is reserved as preliminary investment for land acquisition and demolition, water supply, electricity supply, road access, communication, drainage, gas supply, leveling of land (seven connections and one leveling), and supporting public facilities for the refining and chemical and steel projects.
The matching funds of the Provincial Investment Group mainly rely on self-owned funds and syndicate loans. After the restructuring of the Port Group, the asset-liability ratio will be controlled within 45%, and the impact on the overall debt ratio of the group after consolidation by the Provincial Investment Group is about 2 to 3 percentage points, which is within an acceptable range.
Regarding the timetable for the listing of the Port Group, it is planned to start joint-stock restructuring and listing tutoring after the coal terminal is put into production and achieves stable operation, and complete the H-share listing within 3 to 4 years. Great Wall Bank will participate in the listing work as a sponsor and lead underwriter throughout the whole process, with the cooperation of the Finance Department of the Provincial Investment Group.
...
Section Chief Chen Siyuan, Minister of the Legal and Risk Control Department, then asked: The Port Group choosing to list in Hong Kong involves cross-border legal applicability and regulatory coordination issues.
Listing H shares requires meeting both the listing rules of the Hong Kong Stock Exchange and the overseas listing approval requirements of the State Council Securities Commission; has the Provincial Investment Group done a feasibility study in this regard?
Luo Xiaopeng replied that the investment banking team of Great Wall Bank is already doing a feasibility study on the H-share listing.
As a provincial-owned state-owned enterprise, the Port Group needs approval from the State Council Securities Commission to take the H-share channel.
The cross-border capital operation experience accumulated by the Provincial Investment Group in the wafer fab project, including docking with the Provincial Foreign Exchange Bureau and the Ministry of Commerce, can be reused in the listing work of the Port Group.
Li Fuchun and He Dayong of Great Wall Bank are very familiar with the listing rules of the Hong Kong Stock Exchange, and will cooperate with the Legal and Risk Control Department of the Provincial Investment Group to advance it subsequently.
Section Chief Chen Siyuan asked again: The Maritime Handong Strategy involves three major sectors: port construction, refining and chemical base, and steel base, and the administrative approval procedures are completely different.
How can the Provincial Investment Group coordinate and promote them within the legal and policy framework?
Have the identity conversion of public institution personnel and the continuation of social insurance in the restructuring of the Port Authority been resolved?
Within what proportion of shareholding can private enterprises participating in the Fangyang Town terminal project ensure that the controlling stake of the Provincial Investment Group is not shaken?
Luo Xiaopeng replied that the administrative approval of these three sectors will arrange a timetable according to the principle of "unified planning, separate reporting for approval, and simultaneous promotion".
Regarding personnel placement in the restructuring of the Port Authority, Chen Ruirui has already docked with the Haizhou Municipal Human Resources and Social Security Bureau during the inventory phase, and the social insurance continuation plan for public institution personnel transferring to enterprises has basically been negotiated.
Chen Ruirui added that regarding private enterprises participating in the terminal project, Wang Wenxue has analyzed it in the legal special chapter of the feasibility study report, controlling the shareholding proportion within 15%, and private enterprises enjoy the right to income rather than voting rights, ensuring the absolute control of the Provincial Investment Group over the Port Group through preferred stock design.
...
Minister Chen Fan of the Personnel Department asked how the management team will be arranged after the restructuring of the Port Group, about how many people the management team sent by the Provincial Investment Group will be, and whether the placement plan for the original personnel of the Port Authority has been communicated with the Municipal Party Committee Organization Department of Haizhou.
Luo Xiaopeng replied that the management team is planned to have one principal and three deputies; the chairman and general manager will be dispatched by the Provincial Investment Group; among the three deputy general managers, one will be recommended by the Municipal Government of Haizhou to be in charge of port operations, one will be introduced from a large domestic port enterprise to be in charge of engineering technology, and one will be dispatched by the Finance Department of the Provincial Investment Group to be in charge of finance and investment and financing.
Chen Ruirui is nominated as the Minister of the Finance Department of the Port Group, and the original management personnel of the Port Authority will compete for posts, with priority given under equal conditions.
Qi Tongwei closed the report in front of him, glanced around at the ministers present, and then asked the deputy general managers to express their opinions.
General Manager Hu Yunfeng, Vice President Zhang Xinquan, and Li Shengyuan expressed their stances in turn.
Secretary Tang Yuan spoke last, saying that the feasibility study report by Luo Xiaopeng and Wang Wenxue stands high, thinks deeply, and is practical, and suggested that the report make a final round of revisions according to the opinions discussed today and be submitted to the Provincial Government for approval as soon as possible.
He specially mentioned the planning for the H-share listing of the Port Group, saying that this move is very visionary; the capital injection from the Provincial Investment Group and the startup funds from Great Wall Bank can leverage the initial investment in port construction, but the long-term capital demand of the Maritime Handong Strategy cannot rely solely on bank credit and must borrow the power of the capital market.
Listing on the Hong Kong stock market can not only raise international capital, but also force the Port Group to establish a corporate governance structure and a transparent information disclosure system that meet international standards, which is also an institutional innovation for the management of state-owned assets by the Provincial Investment Group.
"The plan is approved. The Investment Development Department will complete the final revision as soon as possible, and Luo Xiaopeng will be responsible for docking with the Provincial Planning Commission and the Department of Transportation, and reporting to the Provincial Government for approval within this week.
Comrade Chen Ruirui will simultaneously launch the establishment of the preparatory working group of the Port Group, and come up with a timetable for asset evaluation and restructuring schemes."
Qi Tongwei closed the report in front of him, picked up a steel pen, and signed his name on the cover of the report.
