In early December, the political circles of Jingzhou were broken out of their year-end calm by a sudden personnel change.

The Handong Provincial Party Committee officially received the transfer order from the Organization Department of the CPC Central Committee: Comrade Wang Hong was transferred to serve as the Deputy Secretary of the Xihai Provincial Party Committee and Acting Governor.

This was a career leap that Executive Vice Governor Wang Hong welcomed after serving as Executive Vice Governor for nearly five years—from Handong to Xihai, and from Executive Vice Governor to the head of a province. This step was taken solidly and decently.

Meanwhile, Executive Vice Governor Liu Zhen, in charge of industry, succeeded him as Executive Vice Governor, continuing to oversee industry, transportation, energy, and other sectors.

When the news reached the Provincial Department of Transportation, Qi Tongwei was in his office reading the acceptance plan for the Handong section of the Huaixi Energy Corridor.

He put down the document, leaned back in his chair, and was silent for a moment.

Executive Vice Governor Liu Zhen was a veteran leader in charge of industry and had been coordinating resources behind the scenes since the inception of the Maritime Handong Strategy. After Executive Vice Governor Wang Hong's departure, Executive Vice Governor Liu Zhen taking over as Executive Vice Governor would only benefit, and not harm, the subsequent advancement of the Huaixi Energy Corridor and the Maritime Handong Strategy.

...

The date for the comprehensive acceptance of the Handong section of the Huaixi Energy Corridor was set for December 12.

The acceptance site was chosen at the Haizhou City tens-of-million-ton coal transshipment wharf—the southernmost outlet to the sea of the Huaixi Energy Corridor, and also the terminal station of the major transport passage for shipping coal from Shanxi to the south.

Coal from Shanxi Province is currently transported mainly by rail and road to Zhoukou Port in Henan Province, loaded onto ships at the coal-dedicated wharf of Zhoukou Port, enters the Huai River via the Shaying River, and then heads all the way south through Hongze Lake, the Beijing-Hangzhou Grand Canal, and the Yan River to reach the coal wharf of Haizhou Port.

Once the jin-zhou railway is fully connected throughout its entire line, coal can also be directly transported to Haizhou Port by rail, forming a complete transportation network of "dual-line advancement and rail-water intermodal transport" with the existing water transport route.

By then, Zhoukou Port and Haizhou Port will achieve efficient connection through two channels: rail and waterway, with a total annual transportation capacity exceeding 40 million tons.

On the wharf, the cold wind blew fiercely, and the sea breeze coming from the direction of the port carried a salty and fishy scent.

Three 500-ton inland river vessels fully loaded with anthracite coal from Shanxi Province were moored at the wharf berths—these were the first batch of vessels transported via water from Zhoukou Port.

Two fixed ship loaders operated simultaneously, and the pitch-black stream of coal was lifted and poured from the holds and train carriages onto the wharf conveyor belts, and then continuously poured into the cargo holds of ten-thousand-ton ocean-going vessels via conveyor galleries.

Throughout the wharf, coal dust did not fly, and only the roar of machinery and the howling of the sea breeze intertwined.

The wharf has a total length of 480 meters, with two ten-thousand-ton berths and one five-thousand-ton berth, and an annual designed throughput capacity exceeding 10 million tons.

Today, this wharf officially welcomed its first water transshipment operation.

The acceptance ceremony was held at a temporary venue on the wharf operation platform.

Above the rostrum hung a red banner with white characters—"Comprehensive Acceptance Ceremony for the Handong Section of the Huaixi Energy Corridor and First Shipment Ceremony of the Haizhou Port Coal Wharf", and the display boards on both sides printed a panoramic schematic diagram of the Huaixi Energy Corridor—the diagram clearly marked two transportation routes: a blue rail-water intermodal transport line that transfers through Zhoukou Port and then goes south along the inland waterway, and another red railway line that goes directly from the Jinnan mining area to Haizhou Port.

The sea breeze blew the banner fluttering loudly, and below the stage stood representatives from provincial government organs, cities along the route, and participating construction units.

General Manager Zhang Liren, Chairman of the Haizhou City Port Group, delivered the first speech as the representative of the wharf operator.

Wearing a dark blue work uniform and holding his safety helmet in his hand, he stood before the podium. The sea breeze blew his hair into a mess, but he had no time to care, speaking in a sonorous and powerful voice: "The Haizhou Port coal wharf is the outbound hub of the Huaixi Energy Corridor, with an annual designed throughput capacity exceeding 10 million tons."

The wharf is equipped with two sets of fixed ship loaders and fully enclosed coal conveyor galleries. The entire operation process from ship unloading to loading has achieved mechanized and enclosed operations, with zero coal dust emissions.

Today, the first coal transport ship from Shanxi Province has berthed, and this wharf will officially put into operation! All employees of the Port Group will use the highest quality service and most efficient scheduling to ensure that every ton of coal can be transshipped and shipped out through Haizhou Port at the fastest speed and lowest cost!"

Secretary Yu Chengwen, Secretary of the Haizhou Municipal Committee, delivered the second speech.

Speaking without a manuscript, the sea breeze stretched his voice so that it sounded sometimes near and sometimes far, but every word was resounding: "From project initiation to completion and acceptance, the Haizhou Port coal wharf took less than two years, opening up the last kilometer of the major transport passage for shipping coal from Shanxi to the south."

That saline-alkali land in Fangyang Town was still overgrown with weeds this time last year, and now it has been built into the most advanced coal transshipment wharf in the province. Haizhou is no longer a transportation dead-end, but a logistics hub connecting East China, North China, and South China! The Haizhou Municipal Committee and the Municipal Government will continue to provide comprehensive service guarantees for wharf operation and subsequent project construction."

Secretary Zhao Xiaohui, Secretary of the Yuntai District Party Committee, delivered the third speech.

Wearing a dark blue work jacket with her safety helmet tucked under her arm, she stood before the podium, her short hair slightly lifted by the sea breeze: "Yuntai District is the southern gateway of the Handong section of the Huaixi Energy Corridor, and also the core bearing area of the Maritime Handong Strategy.

Coal wharves, refining bases, electric furnace steel projects, port-access highways, and dedicated railway lines—all these projects are being promoted simultaneously on the territory of Yuntai District. The cadre team of Yuntai District has stood the test, with twenty deputy section-level substantive positions all deployed to the frontline of the projects, and dedicated personnel monitoring every section. Today is the day of acceptance for the major transport passage for shipping coal from Shanxi to the south, and it is also an answer sheet handed over by Yuntai District to the Provincial Party Committee and the Provincial Government—we have not failed the trust of the organization!"

Qi Tongwei delivered the fourth speech on behalf of the Provincial Department of Transportation.

Standing before the podium, the sea breeze slightly fluttered the hem of his dark gray suit, but his voice was as steady as ever: "The Huaixi Energy Corridor is a coal-electricity-road-port intermodal transport passage connecting the Jinnan coalfield, Zhoukou Port, and Haizhou Port, and it is a national-level energy strategic project.

The Handong section is the southern exit of this major passage, and also the most complex and difficult section. In two years, we completed the regulation of the Shaying River waterway, the dredging and widening of the Yan River, the construction of the Haizhou Port coal wharf, and the simultaneous connection of the port-access railway and port-access highway, opening up all the joints for shipping coal from Shanxi to the sea via water transport.

The waterway has reached Class IV standards, with an annual water transport passing capacity exceeding 40 million tons, and an annual designed throughput capacity of the wharf exceeding 10 million tons.

At present, the passage for shipping coal from Shanxi to Haizhou Port via water transport through Zhoukou Port has been fully connected and put into operation. In the next step, once the jin-zhou railway is completed and opened to traffic and completes connection with the port-access railway, this major passage will truly realize 'dual-line advancement and rail-water intermodal transport', and the comprehensive transportation cost will be further reduced."

Newly appointed Executive Vice Governor Liu Zhen delivered the final speech.

Wearing a dark blue jacket and standing before the podium, the sea breeze carried his voice far away: "The Huaixi Energy Corridor is a key project written into the outline of the State Planning Commission, and also the core support for the Maritime Handong Strategy of Handong Province.

Comrade Wang Hong poured huge painstaking efforts during his tenure. Today, although he has gone to Xihai to take up his new post, the major passage he left behind will be forever recorded in the annals of Handong's development. The smooth acceptance of the Handong section marks the full connection of the coal-electricity-road-port intermodal transport passage from the Jinnan coalfield through Zhoukou Port to Haizhou Port!"

He specifically mentioned two guests who had come from afar: "Today, Comrade Zhao Hongqi from Shanxi Province and Comrade Zhou Shaokun from Henan Province also made a special trip to attend the acceptance ceremony. They are the pioneers and builders of this major passage. From the integration of the Jinnan Coal Industry Group to the construction of the coal-dedicated wharf at Zhoukou Port, and from the early preparation to the full-line advancement of the jin-zhou railway, they have paid huge painstaking efforts for this major passage. Let us express our gratitude to them with warm applause!"

Zhao Hongqi and Zhou Shaokun stood up and slightly bowed, and the applause below the stage was thunderous.

Executive Vice Governor Liu Zhen continued: "The construction of the Huaixi Energy Corridor is also inseparable from the strong support of cities along the route and participating construction units. The Provincial Government will continue to increase support for the subsequent improvement projects of the Huaixi Energy Corridor to ensure the long-term stable operation of this major passage, while accelerating the construction of the Haizhou electric furnace steel base and the Sinopec Haizhou refining base, turning coal from fuel into raw material and from energy into product, truly realizing the integration of coal, electricity, road, and port!"

After the ceremony, a brief departure ceremony was held on the wharf.

With a long whistle, the first ten-thousand-ton ocean-going ship full of anthracite coal from Shanxi Province slowly sailed away from the berth, its bow splitting the sea surface, and white spray churning on both sides of the hull.

A burst of applause sounded on the wharf. Several old dock workers took off their safety helmets, clapped their hands hard, and their eye sockets were slightly red.

Zhao Hongqi, Zhou Shaokun, and Qi Tongwei stood by the edge of the wharf, watching that ten-thousand-ton ocean-going ship slowly disappear into the distant horizon.

The three of them fell silent for a long time in unison, and the sunlight shone on the silver-gray wharf, sparkling brightly.

"It's been two years." Zhao Hongqi spoke first, his voice somewhat hoarse, "From the Jinnan mining area to Zhoukou Port, from the Shaying River to Haizhou Port, from a dotted line on the blueprint to the major passage beneath our feet today. We did it."

Zhou Shaokun nodded aside without speaking, but his eyes were full of emotion.

From the cleanup and rectification of the public wharf at Zhoukou Port to the completion and acceptance of the coal-dedicated wharf, and from the expansion of Liuwan Port to the regulation of the Shaying River waterway, he had walked this road for two years, and every step was stepping on the blade's edge.

Today, watching the first ship fully loaded with Shanxi coal berth at Haizhou Port, he felt that the hard work of the past two years was worth it.

Qi Tongwei patted the two on the shoulders: "When the jin-zhou railway is completed and open to traffic, I invite you to take the first train."

Zhou Shaokun smiled rarely: "Then I'll remember that."

Zhao Hongqi grinned: "I'll leave the ticket for the first train to my grandson."

The three of them laughed at the same time.

...

After the acceptance ceremony, Secretary Zhao Xiaohui accompanied Qi Tongwei to walk east along the port-access road of the port area.

She did not bring any accompanying personnel, and only let her secretary follow far behind.

The sea breeze blew from the direction of the port, and her short hair was blown to cover her eyes from time to time. She reached out to tidy it and continued to walk forward.

The two walked through the yard of the port area, crossed the port-access highway where asphalt was being laid, and walked all the way to the coastal mudflat of Fangyang Town.

Before their eyes was a huge construction site—the pile foundations of the electric furnace steel project had all been driven, dozens of pile drivers were withdrawing from the site, the jib of the tower cranes rotated slowly in the air, and concrete pump trucks extended their long jibs to pour concrete into the steel cages.

Further away, the atmospheric and vacuum distillation unit of the Sinopec Haizhou refining base was already taking initial shape, two huge crude oil storage tanks were having their roof covers installed, and thousands of construction workers were operating simultaneously on the construction site.

The coastal mudflat of the entire Fangyang Town had turned into a huge open-air factory. Tower cranes, concrete pump trucks, excavators, and transport trucks intertwined, and the roar of machinery and the howling of the sea breeze blended together.

Secretary Zhao Xiaohui stood by the edge of the mudflat and pointed at the refining base in the distance: "Pile foundation construction for the phase I project of the refining project has been completed by ninety percent, and the main installation of the crude oil storage tanks is expected to be completed before the Spring Festival. The supporting water supply pipelines and dedicated power supply lines are already undergoing final equipment debugging. Once the refining base is officially put into operation, this piece of saline-alkali land in Fangyang Town will become the largest energy and chemical industry cluster in the province."

Walking all the way, she introduced the progress of each project, the construction period of each node, and the investment scale of each project. All the numbers were recorded in her mind, and she could fetch them effortlessly without looking at any materials.

Only when talking about these did her voice become a bit lighter than usual.

Only when introducing these projects did her eyes shine a bit brighter than usual.

Only when walking side by side with him on this land she had reclaimed with her own hands did her heartbeat become a bit faster than usual.

Only at this moment, only in this jungle of reinforced concrete, and only by his side could she feel that her heart was steadfast and joyful.

Qi Tongwei did not walk into the project base, but simply stood by the edge of the mudflat, listening to Secretary Zhao Xiaohui's explanation, his gaze shifting from the tower crane of the electric furnace steel project to the atmospheric and vacuum distillation unit of the refining base, and then to the loading and unloading arm of the distant coal wharf.

Those jungles of reinforced concrete stood silently in the sea breeze, and every tower crane, every pile driver, and every steel beam was telling the changes happening on this saline-alkali land.

He looked for a long time, then turned his head and said to Secretary Zhao Xiaohui: "You've had a hard year."

Secretary Zhao Xiaohui shook her head: "It's not hard, I'm willing." She answered too fast, so fast without any hesitation, and so fast that even she herself was somewhat surprised.

The setting sun gradually sank westward, and golden ripples rippled across the sea surface.

The loading and unloading arms on the distant coal wharf were still working tirelessly, and another inland river ship loaded with full anthracite coal from Shanxi Province slowly sailed into the berth.

Secretary Zhao Xiaohui stood beside Qi Tongwei, the sea breeze blowing her short hair to cover half her face, and she did not reach out to tidy it again.

She thought, standing by his side like this, even if only for a little while, was enough.