16
Liang Qiming lowered his head and recalculated the blueprints.
"This way, the construction efficiency of the first phase will drop."
"Residents' daily lives cannot be considered compressible costs."
Su Xiaoli looked at Lin Feng to confirm the final item.
"Is the direction officially determined to be the eastern logistics corridor?"
"Confirmed."
She wrote down the complete name in the meeting minutes.
【Donghai New City First Territorial Boundary Expansion Direction: Eastern Logistics Corridor】
The moment this line of text was finished, the system panel before Lin Feng gently lit up.
【Detected that the host has completed the first expansion direction selection】
【Expansion Direction: Eastern Logistics Corridor】
【Real-world Planning Approval: Incomplete】
【Real-world Land Procedures: Incomplete】
【Relevant Resident Consultations: In Progress】
【Current Territorial Boundaries Will Temporarily Not Change】
Immediately following, a new set of mission information slowly unfolded.
【New Phase Main Mission: Urban Meridians】
【Mission Description: The expansion of a city is not an increase in area, but the reconnection of population, industry, energy, and public services】
【Mission One: Complete Real-world Approval for the Eastern Logistics Corridor】
【Mission Two: Achieve Separation of Freight Traffic and Resident Commuting】
【Mission Three: Build City-level Public Logistics Nodes and Truck Service Center】
【Mission Four: Complete First-phase Construction of the City Energy Center】
【Mission Five: Add Over Three Thousand Stable Employment Positions】
【Mission Six: Existing Residents' Public Service Satisfaction Must Not Significantly Decline During Expansion】
【Mission Seven: Compliance Rate for Land and Resident Consultations Must Reach One Hundred Percent】
【Mission Reward: Permanent Expansion of First Territorial Boundary】
【Mission Reward: City-level Rail Transit Blueprint】
【Mission Reward: Five Hundred Thousand prosperity points】
【Special Reminder: Any construction that forcibly bypasses real-world approval will not count towards mission completion】
After reading the last line, Lin Feng's expression did not change.
This mission did not require him to enclose the most land in the shortest possible time.
Instead, it listed compliance, residents' daily lives, and public services as unavoidable conditions.
This was basically consistent with the decision he had just made.
"What are you calculating again?"
Su Xiaoli picked up the clear noodles that were already somewhat cold and glanced at him.
"Application materials."
"Still doing it tonight?"
"Finish the framework."
Su Xiaoli lowered her head and took a bite of noodles.
"You said yesterday that the next step could wait until tomorrow."
"Yesterday has already passed."
She held her chopsticks in silence for a moment, ultimately unable to find an angle for rebuttal.
Han Ze recalculated the construction account.
"Six hundred forty million cannot be entirely borne by operating cash flow."
"How much can be brought out at the current stage?"
"Two hundred ten million, without affecting the Hospital expansion and the second phase of the school."
"What about the urban project loan?"
"After the credit rating is upgraded, the bank can initially provide a quota of three hundred million, and the remaining part will require municipal-level transportation special funds or phased construction."
Lin Feng shook his head.
"Don't borrow the full amount all at once."
Han Ze looked up at him.
"Then the construction period will be prolonged."
"First report the 4.8-kilometer diversion road and logistics nodes, and wait for operational data for the second section."
Su Xiaoli flipped to the government coordination section.
"Have you made an appointment with Deputy Mayor Zhou Qing over there for tomorrow morning?"
"It's set for nine o'clock."
Old Zhou walked in from the doorway and placed the newly received document on the table.
"The planning department is already willing to conduct technical reviews in advance, but explicitly stated it does not represent approval."
"Normal."
Lin Feng took the document and began reading from the first page.
At 11:20 PM, the official Donghai New City released the direction decision.
The announcement did not use words like success, set sail, or blockbuster landing.
The first paragraph explained why the eastern side was chosen.
The second paragraph explained why the northern and western sides were temporarily not chosen.
The third paragraph listed the eight conditions that the eastern plan must meet.
These included bypassing Dongqiao Village residences, protecting irrigation water systems, preventing heavy trucks from entering living roads, and not developing residences in disguise under the name of Logistics Park.
Wanrong's submitted western plan was also recorded in commercial contact matters.
No quotation details were made public, only noting that the other party proposed exchanging comprehensive development funds for large areas of residential and commercial development rights, which Donghai New City did not accept.
After the announcement was released, the debate in the comment section did not stop immediately.
Those who supported the western side still felt regretful.
Some villagers in Dongqiao Village also demanded to see the official route before expressing their stance.
But the ecological protectors of the northern side visibly breathed a sigh of relief.
That commuting teacher left a sentence in the comment section.
【I still hope the western side will be built sooner, but at least you made it clear why not now】
The Donghai New City official replied to her.
【The calculation for the western bus rapid connection will be announced separately】
At midnight, Zheng Shoutian had his grandson print out the direction announcement.
Wearing his reading glasses, he read through the eight conditions one by one at home.
Seeing the southern detour and irrigation protection, he picked up the phone and called several households in the village that had not yet submitted their opinions.
"The route hasn't been approved yet."
"But this time they wrote the expensive one on it."
It was unknown what was said on the other end of the phone.
Zheng Shoutian glanced at the old surveying notice left on the wall from ten years ago.
"Don't believe it yet, and don't curse yet."
"When the official map comes out, we will look at it one by one."
At 9:00 AM the next day, the municipal government's planning coordination meeting started on time.
Deputy Mayor Zhou Qing did not arrange for media, nor did he have anyone prepare welcome slogans.
The planning, transportation, natural resources, water conservancy, and ecology departments each sent technicians to the scene.
The materials submitted by Donghai New City filled half of a long table.
Deputy Mayor Zhou Qing flipped to the cost page of the detour plan, and his first reaction was the same as Liang Qiming's.
"Seventy-three million more, and two more bridges need to be built."
"Correct."
"The low-cost route only affects twelve households, and relocation can be negotiated according to law."
"Not chosen."
Lin Feng's answer was very direct.
Deputy Mayor Zhou Qing looked at him.
"What is the reason?"
"If we can bypass it, we won't relocate them."
The meeting room was quiet for a few seconds.
The head of the natural resources department lowered his head to review the route again.
"The southern plan touches fewer residences, but will occupy twenty-seven more acres of general arable land."
"Land compensation will follow official standards, and temporary land occupation will be restored after construction ends."
"How to solve the crossing of the irrigation canal?"
The water conservancy engineer put Dongqiao Village's oral water level records on the screen.
"Add water-passing culverts between the two bridges, and the design flow rate will float upward by twenty percent based on the historical highest water level."
Deputy Mayor Zhou Qing flipped to the truck Service Center section.
"Parking, showers, catering, maintenance—is this part prepared for market-oriented operation?"
"Basic parking and public sanitation have price caps, while maintenance and catering operate normally."
"Will it turn into highway service area style consumption?"
"Public drinking water and driver rest areas are free."
The head of the transportation department looked at the connection position between the eastern route and the transportation hub.
"If trucks all enter from the east, a separate dispatch entrance must be added, otherwise it will impact the passenger transport area."
"Constructed simultaneously in the first phase."
"Where does the money come from?"
Han Ze projected the capital structure onto the screen.
"Donghai New City's own funds are two hundred ten million, applying for urban project loans of no more than two hundred million, and the rest applying for municipal-level transportation and industrial supporting special funds."
Deputy Mayor Zhou Qing looked up at Lin Feng.
"Given your current credit limit, you could completely borrow a bit more."
"There's no need to use up the quota all at once."
"Afraid of the third-phase repayment?"
"Also afraid that public project income will fall short of expectations."
Deputy Mayor Zhou Qing nodded and didn't urge him to be optimistic.
What was most precious after the debt restructuring was not that Donghai New City could suddenly borrow more money.
Rather, it was that when Lin Feng was able to borrow, he still knew what money should not be borrowed to the full limit.
