"Chapter 842: Routes Won't Get Shorter Just Because You Praise Me"

Lin Feng happened to be walking over from the other side and heard the last sentence completely.

"The official route will be sent to the village in seven days."

The smile on Zheng Shoutian's face instantly vanished.

"I speak bluntly."

"I can tell."

"Aren't you angry?"

"Routes won't get shorter just because you praise me."

Zheng Shoutian stared at him for two seconds before finally putting on his straw hat and leaving.

Su Xiaoli waited until he left before turning to look at Lin Feng.

"You're no more tactful than he is."

"It saves time."

At four in the afternoon, the city-level energy carrying capacity report was delivered to the conference room.

Once the industrial park, Hospital expansion, and future logistics corridor operated simultaneously, the existing power capacity would approach its peak.

The urban energy center in the Level 6 infrastructure had turned from an optional item into a prerequisite for the expansion task for the first time.

The solution provided by the system module included distributed energy storage, emergency power supplies, and intelligent dispatching.

In reality, it still needed to complete grid-connection approval with the municipal power grid.

Liang Qiming looked at the candidate locations for the energy center.

"Putting it near the eastern logistics node is most appropriate."

"What about noise and safety distances?"

"It's 1.8 kilometers away from the nearest residence in Dongqiao Village, which meets the basic requirements, but an environmental assessment still needs to be done."

Han Ze looked at the budget.

"This will add another operating expense."

"It will also reduce the risk of power outages in the industrial park."

Xu Mingchuan put the power fluctuation records of the past three months on the screen.

"There are no power outages currently, but during peak hours, it has approached the warning line twice already."

Lin Feng made a mark under the energy center column.

"Submit the grid-connection procedures together with the logistics corridor, but apply for construction approval separately."

"The system... when is the construction team scheduled?"

Han Ze stopped halfway and very naturally switched to the title everyone was familiar with.

Lin Feng didn't look at him.

"After the approval is completed."

Everyone was already used to that construction team from Donghai New City that never accepted interviews and had absurdly high construction efficiency.

No one knew where they came from, nor could anyone see the complete construction process during the day.

All external explanations remained modular construction, nighttime operations, and long-term prefabrication.

Lin Feng wouldn't explain a single word more.

That night, the prosperity points settlement increased by another 210,000-plus points.

The available balance exceeded 550,000.

He still hadn't initiated the upgrades for the energy center and the Hospital.

The construction button on the system panel had lit up, but the reality conditions column still had multiple items unfinished.

Building things first and then forcing the approval departments to accept them was not efficiency.

That was trading the entire city's credit for speed.

On the morning of the seventh day, the first version of the eastern detour route was officially delivered to Dongqiao Village.

The working group didn't just bring one large map.

Each of the 46 resident households received a local map marking their own location.

Holding a magnifying glass, Zheng Shoutian looked from the village entrance to the irrigation ditch, and then from the irrigation ditch to the south bridge site.

"Why is there a truck turnaround area here?"

Liang Qiming pointed to a location two kilometers away from the village.

"In emergencies, vehicles cannot back into the township road, so a turnaround point is set up."

"Would anyone normally enter the village from here?"

"Height and tonnage limits are set at the village entrance, and agricultural vehicles won't be affected."

A villager pointed at the green buffer zone.

"Planting trees all along the three hundred meters?"

"The side close to the logistics area will be dominated by dust-preventing and noise-reducing arbor trees, while the side close to the village will retain farmland and public walkways."

"Who maintains it?"

"The logistics node operator will bear the basic costs, and the village collective can participate in the procurement of maintenance services."

Zheng Shoutian flipped to the employment clauses again.

"Local positions are no less than 150; how did this number come about?"

"Calculated at five percent of the 3,000 positions in the first stage."

"What if only eighty people in our village are willing to go?"

"The remaining positions will be openly recruited without holding empty titles just to make up numbers."

The villagers gathered around the blueprints and discussed for more than two hours.

There was no applause, and no one expressed gratitude on the spot.

In the end, thirty-nine out of the forty-six households agreed for the route to enter the next stage of approval.

Five households requested additional noise assessments, and two temporarily opposed it.

Zheng Shoutian did not demand that the minority obey the majority.

"Those two households are closest to the South Bridge; let's figure out their issues first."

Lin Feng nodded.

"We won't skip it."

One of the households worried that bridge construction would affect their breeding pond.

The other household worried that after the Logistics Park was built, changes in land prices would increase living costs.

The first problem could be resolved by adjusting the construction access road.

The second problem could not be solved immediately with a single map.

Lin Feng had Luo Qingping include Dongqiao Village in the basic living price monitoring scope.

Future catering and shop rents in the logistics area could be market-driven, but the village's basic utilities, public transit, and public services could not suddenly increase due to the expansion.

"You even manage vegetable prices in the future?"

Zheng Shoutian looked at the newly added explanation.

"We don't manage vegetable prices."

Lin Feng pointed to the price monitoring clause.

"We only care whether someone uses the expansion to force a uniform rent increase."

This time, Zheng Shoutian didn't pick faults.

Two days later, both opposing households agreed for the route to enter formal approval.

They didn't sign land acquisition contracts; they only signed records acknowledging the route and impact assessment.

The relevant materials were uploaded completely without being packaged as enthusiastic support from everyone.

The resident negotiation progress on the system panel changed accordingly.

【Relevant resident negotiations: Stage 1 completed】

【Compliance rate: 100%】

【Note: Compliance does not equal permanent consent; formal compensation agreements still need to be signed independently】

After reading the prompt, Lin Feng put the last piece of material into the document bag.

Su Xiaoli sat across from him, checking the supplementary catalog to be submitted to the planning department tomorrow.

"There's also news from the Hospital side."

"Did Qin Lu reply?"

"She is willing to come, but proposed a one-month probationary trial first."

"Agreed."

"Her husband is a smart device engineer, and the industrial park's access control company is willing to interview him normally."

"Follow the recruitment process."

Su Xiaoli looked up at him.

"You won't even say a single word of welcome now?"

"HR will say it."

"What about you as the boss?"

Lin Feng thought for two seconds.

"The cafeteria meal can have an extra serving of braised pork belly."

"Is that real or illusionary real?"

"Up to her choice."

Su Xiaoli lowered her head and smiled, moving Qin Lu's name into the second-round interview list.

Outside the window, several newly recruited nurses for the Hospital were checking into the talent apartments.

Dragging their suitcases past the Service Center, they first went to the express delivery transfer point to register their addresses.

An industrial park commuter bus drove past in front of the door, and the route map on the side of the bus body had added a temporary driver rest stop.

The trucks in the distance still needed to queue.

The eastern logistics corridor still existed only in blueprints and application materials.

The city didn't instantly gain an extra piece of land just because the direction was determined.

At 10:40 PM, all supplementary materials were sealed.

Xu Mingchuan generated verification records for each electronic file, and Han Ze confirmed that the source of funds did not touch old accounts or primary debt accounts.

After checking the residents' opinions, Luo Qingping was the last one to close the page.

"It can be submitted."

Su Xiaoli pushed the document bag in front of Lin Feng.

"Tomorrow morning at nine, it will officially enter planning approval."

Lin Feng glanced at the time.

"Submit the electronic version now."

"You don't even want to wait nine hours?"

"The system is accepting items now."

Su Xiaoli opened the online declaration platform and uploaded 187 attachments one by one.

The progress bar moved very slowly.

A-Wang was lying under the conference table, and the city-level tag on its neck bumped against a table leg, making a very soft collision sound.

Lao Zhou bent down to turn its tag to the side.

"This representative of yours currently has no approval authority."

A-Wang looked up at him and lay back down again.

The electronic platform popped up a prompt at 11:06.

【Donghai New City Eastern Logistics Corridor Boundary Adjustment Application Accepted】

【Current status: Under formal review】