16
After obtaining authorization, the official transparency page fully published the impact comparison of the three routes.
The first one has the lowest cost and occupies the most land.
The second one reduces the impact on the Orchard, but increases construction difficulty.
The third one completely detours, adding over four hundred meters of bridges.
The page did not guide netizens to support any particular option.
The bottom only stated that the related families had not yet formed a final opinion, and the project party would not make decisions on their behalf in advance.
Public opinion soon underwent a change.
Quite a few people who initially demanded an unconditional detour began to seriously compare the three options.
Some also proposed moving the pear trees into the village's public space to be jointly maintained by the entire village.
A landscape engineer voluntarily left a message, expressing willingness to provide free transplanting technical advice.
After seeing the complete page, Zheng Guoliang's sister remained silent for a long time.
That night, she changed the supplementary explanation of the original video to be pinned at the top.
"The project party has provided the options, and our family is still discussing them. Please do not curse the villagers, and do not make decisions on our behalf."
The next morning, Zheng Guoliang's family came to the Service Center again.
They ultimately chose the second option.
Seven pear trees suitable for transplanting were moved to the public green space in the south of the village.
Three high-risk trees were kept in their original positions as much as possible, avoiding them by fine-tuning the construction control line.
Two diseased trees would be treated first, and decisions would be made based on their recovery status.
If the transplanting failed, the wood would be made into a long table and placed outside the villagers' activity room.
"The long table cannot be engraved with the project name."
Zheng Guoliang put forward his final request.
"It won't be engraved."
"And don't engrave my family's name either."
"Understood."
"Just write the sentence 'Everyone, let's eat.'"
Su Xiaoli recorded these four characters into the additional agreement.
The agreement was still not a land acquisition compensation contract.
It only confirmed that the route design could continue to be deepened according to the second option.
When it truly came to the disposal of land and trees, formal documents would need to be signed again.
The system progress changed accordingly.
【Resident Impact Negotiation: Phase Two Complete】
【Transparency in Handling Controversial Matters: Excellent】
【Reminder: Public Support Does Not Replace Written Consent from Rights Holders】
Lin Feng closed the panel.
This kind of reminder had appeared many times.
The system also seemed to constantly emphasize that prosperity points could accelerate construction, but could not replace human choices.
In the following week, no buildings suddenly sprung up along the eastern logistics corridor.
Surveying vehicles went back and forth every day.
Traffic monitoring equipment continuously recorded the traffic flow of heavy trucks.
Environmental agencies added six new water level monitoring points at the outer edge of the wetland.
The power grid company conducted the first round of review on the energy center connection plan.
The existing main grid could bear basic connections.
However, once the Industrial Park continued to expand its capacity, a new section of high-voltage lines must be built.
There were two choices for this line.
The first one has a short distance, but is close to the farmland of Dongqiao Village.
The second one is laid along the logistics corridor, with a longer distance, but can be synchronized with road construction.
The power grid representative leaned more towards the first one.
"The construction cost is low, and the loss is also small."
"Are the safety distances met?"
"They meet the specifications."
"Will it have an impact on agricultural machinery operations?"
"There will be height restrictions beneath the overhead lines."
Hearing this, Zheng Shoutian immediately frowned.
"Can our village's large harvesters pass through?"
"Ordinary models can."
"What do you mean by ordinary models?"
The power grid representative opened the equipment parameters.
Zheng Shoutian directly pulled up the photo of the cooperative's harvester in the village.
After the equipment was deployed, its highest point was nearly one meter higher than the data estimated by the other party.
The meeting room fell silent for a moment.
"Then the tower positions need to be adjusted."
"Will it still go through the farmland after adjustment?"
"It will still pass along the edge of the farmland."
Lin Feng looked towards the second option.
"Recalculate based on the shared road corridor."
Han Ze offered a reminder.
"The cost will increase by at least thirty-five percent."
"Calculate it first."
The power grid representative was somewhat surprised.
"You guys choose the expensive ones for everything."
"It's not about being expensive, it's about having less impact."
"It's impossible to have no impact."
"That's why we need to compare."
After recalculating the second shared corridor option, although the cost was higher, it could reduce newly added land use.
Line maintenance could also utilize the maintenance passages of the logistics corridor.
The power grid company did not accept it on the spot, but only agreed to enter technical comparison and selection.
There was no applause for this result.
When leaving, Zheng Shoutian proactively packaged and sent all the parameters of the cooperative's large agricultural machinery to the working group.
"Don't calculate with ordinary models anymore."
"From now on, vehicle data will be updated annually by the village."
Luo Qingping added a dynamic filing item on the spot.
Zheng Shoutian watched her operation.
"I was just saying it casually."
"If it's useful, it gets recorded."
"Any casual remark here could turn into a system/regulation."
"Or it might be rejected."
"Who would reject it?"
"Boss Lin."
Zheng Shoutian looked back at Lin Feng, who was discussing costs with the power grid representative.
"He really looks like the kind of person who would do such a thing."
When the logistics corridor correction entered its twelfth day, the extreme traffic scenario simulation was finally completed.
Data showed that after the new road was put into use, the traffic flow of heavy trucks on the outer edge of the existing residential area was expected to drop by seventy-six percent.
The eastern logistics node would form short-term queues during morning and evening peak hours.
If the buffer zone was not increased, the queue might spill back to the highway connection line at the longest.
The capacity of the originally designed truck waiting area was insufficient.
Liang Qiming proposed doubling the size of the waiting area.
After viewing the drawings, Tang Xiaoyu pointed at the location of the driver's rest area.
"After the expansion, the restroom is eight hundred meters away from the furthest parking space."
"We can add a sanitation point."
"What about showers?"
"Showers will only be kept in the central rest area."
"It's inconvenient to walk eight hundred meters when it rains."
Liang Qiming glanced at her.
"Do you have any suggestions?"
"Add a loop shuttle bus in the waiting area."
"Truck Drivers can take the bus after getting off their trucks."
"People who queue for a long time need to rest anyway."
This suggestion sounded like it added an extra step.
After Xu Mingchuan's team pulled up the driver stay data, they found it feasible.
Among currently waiting vehicles exceeding two hours, nearly sixty percent of drivers would leave their vehicles to go to restrooms or dining spots.
Setting up a low-frequency loop shuttle could reduce drivers walking in the truck lanes.
Lin Feng did not approve it immediately.
"Test it at the existing temporary point for seven days first."
Tang Xiaoyu nodded.
"I'll make the satisfaction records."
"Do it after school."
"Got it."
The temporary shuttle used an eight-seater electric vehicle.
On the first day, almost nobody took it.
The drivers felt that eight hundred meters wasn't far.
On the second day it rained, and the number of users increased to nineteen people.
On the third day, after a driver with a lumbar injury took it once, he proactively introduced it to others.
By the end of the seventh day, the shuttle had an average daily usage of forty-seven person-trips.
The satisfaction rate was not particularly high.
The main problem was the unstable waiting time.
Tang Xiaoyu wrote very directly in the report.
She suggested keeping it, but not as the sole option; sanitation points should still be added to the furthest parking areas.
Lin Feng signed his approval at the end.
The logistics node was ultimately adjusted to one central rest area, two basic sanitation points, and one loop shuttle line.
Added together, these contents only took up two pages of the correction report.
Yet they came from seven days of real usage.
On the fifteenth day, all seventeen technical corrections were completed.
Electronic attachments increased from one hundred and eighty-seven to three hundred and twenty-one.
Xu Mingchuan's team generated verification records for each document.
Before submission, Liang Qiming checked the route coordinates one last time.
Han Ze confirmed that all upfront expenses came from available operating surpluses, and no regulated accounts were misappropriated.
Luo Qingping checked the resident information disclosure records item by item.
