At nine o'clock that evening, Master Feng came to the village committee office with his daughter's video call.

His daughter asked about the surveying agency, the purpose of the data, the method for raising objections, and the subsequent modification process item by item.

Luo Qingping answered every single one of them.

Finally, the person on the video said a sentence.

"Dad, you can sign off on the current status, but mark the disputed plots separately. Don't sign them as undisputed."

Only then did Master Feng put pen to paper.

A long note was added to the remarks column of the survey form.

This form did not become invalid because of the existence of a dispute.

On the contrary, the dispute itself became part of the current status.

Three days later, the first round of baseline air and noise monitoring was completed.

The results did not show a dramatic "all perfect".

Near the exit of the old freight road close to the Industrial Park, the instantaneous nighttime noise was already on the higher side.

The total nitrogen content in the water bodies of the two ditches on the south side of Dongqiao Village was also higher than that of surrounding monitoring points.

Preliminary judgment linked this to village farming fertilization and post-rain surface runoff.

After receiving the briefing, Su Xiaoli asked a question first.

"Should we make it public now?"

Engineer Cai shook his head.

"This is phased sampling and needs to be rechecked. Single-instance data cannot be directly used as a conclusion."

"Can we disclose that the sampling has been completed and that two items are found to need rechecking?"

"Yes, but do not publish specific figures that have not been rechecked."

Half an hour later, the transparent slide was updated.

"The first round of baseline monitoring has been completed. The current environmental status is not a blank slate, and data requiring further review has been found at some monitoring points. Project evaluation will distinguish between existing impacts and new impacts; we will neither attribute all current problems entirely to the proposed project, nor use existing current problems as a reason to relax the control of new impacts."

This paragraph did not look as nice as saying "monitoring results all meet the standards".

However, professional recognition quickly appeared in the comment section.

"This is a normal environmental impact assessment. Where on earth is there an environment where everything scores full marks upon testing?"

"We must distinguish between existing stock and incremental changes first; otherwise, no one will be able to make things clear if problems arise later."

"It is recommended to also make the review process public."

Some people also seized upon the four words "high total nitrogen" and began spreading claims that the water pollution in Dongqiao Village was severe.

A short video of only a dozen seconds quickly appeared.

In the footage, a videographer stood by a ditch, pointing at the slightly turbid post-rain puddles.

"This is the expansion area of Donghai New City, which claims to prioritize ecology. The water is already like this, and they are still planning to build a Logistics Park."

The video did not mention that this ditch was located outside the existing territory, nor did it mention that the sampling took place after a rainstorm.

Even less did it mention that the project had not yet started construction.

After watching it, Su Xiaoli did not ask the platform to delete it.

She had the monitoring unit provide the on-site sampling records, and pulled up the rainfall data and upstream farmland distribution map for the past week.

The official response used only four sentences.

"This ditch is located in the proposed expansion area, and the project has not yet started construction. The first round of monitoring found that some indicators need to be rechecked, and a second sampling and source analysis have been arranged according to procedures. Current problems will neither be concealed nor attributed in advance. You are welcome to continue following the subsequent raw records and formal evaluation conclusions."

That evening, the person who posted the video voluntarily deleted the title "Logistics Park Pollution" and changed it to "Current Status of East Side Water Quality Draws Attention".

There was no apology.

The New City officials did not chase after them demanding an apology either.

After looking at the handling results, Lin Feng said only one sentence.

"File it."

"I thought you would have a lawyer send a letter," Su Xiaoli said.

"He said the water was muddy, which doesn't count as rumor-mongering."

"He said it was caused by the Logistics Park."

"He changed it."

"He changed it quickly enough."

"It shows he can read."

Su Xiaoli put down her phone.

"You're getting more and more roundabout when you curse people now."

"I learned it from the head of operations."

"I'm only responsible for colloquial expressions."

"This sentence is very colloquial."

The second sampling was scheduled after three consecutive days without rain.

The results showed that the total nitrogen at the two ditch sampling points dropped significantly, but was still higher than the water body on the periphery of the Northern Wetland.

The environmental impact assessment team investigated upstream along the water system, and finally confirmed that one of the locations was related to villagers intensively cleaning fertilization tools, while the other received drainage from a large area of farmland.

This was not a problem caused by the logistics corridor, but it could not be treated as non-existent in the design.

If improperly handled during the construction period, once the ditches are disturbed, pollutants might further enter the old groundwater system.

Based on this, Liang Qiming's team added temporary sedimentation tanks during the construction period, rainwater-sewage diversion ditches, and farmland drainage protection measures.

The entrance locations of the two original ecological culverts were also fine-tuned by seventeen meters.

After the adjustment, the earthwork volume increased by nearly eight percent.

Looking at the budget sheet, Han Ze's brow twitched.

"This road is no longer just a road."

"It never was," Lin Feng said.

"If we keep adding things, the cost per kilometer will catch up to an urban expressway."

"It has to carry water, electricity, and traffic all at once, without cutting the farmland into pieces."

"I'm just stating the cost."

"Is the funding sufficient?"

"Enough for the early stage. Construction funds for the entire line have to wait for final approval and financing plans."

"Then keep calculating."

Han Ze closed the budget sheet.

"I've noticed that every time you say 'keep calculating', you end up choosing the expensive option."

"There are cheap ones too."

"When?"

"The cafeteria's fried eggs."

Su Xiaoli was drinking water and almost choked.

"Your cost control over a single fried egg is much stricter than over a hundred million budget."

"Fried eggs are eaten every day."

"So the long-term expenditure is greater?"

"Compound interest mindset."

"Starting tomorrow, I'll put half a noodle less in your clear noodle soup."

"Noodles can be weighed."

"Fried eggs can be too."

"It affects the integrity."

"Your principles are quite flexible."

The people in the office who had been busy all day burst into laughter.

The relaxation lasted for less than five minutes.

Xu Mingchuan's team sent over a new public opinion statistic.

Over the past twenty-four hours, the platform suddenly received 186 opposition comments with highly similar content.

All the comments used the exact same wording.

"The project will completely destroy the Northern Wetland, causing irreversible ecological disaster, and we strongly demand its immediate cancellation."

The submitting IPs came from different regions, but the timestamps were highly concentrated.

Technicians made a preliminary judgment that someone was batch-forwarding templates.

"Should we merge the statistics?" Xu Mingchuan asked.

"Public participation comments in EIA cannot be directly deleted just because they are similar," Su Xiaoli said.

"They can be kept according to the original number of copies, and the content repetition rate can be marked during analysis."

Lin Feng looked at the submission sources.

"How many are local?"

"Twenty-three copies. There are only four within the direct impact range of the project."

"Contact these four people and ask if they are willing to attend a symposium. We're not verifying whether their identities are true or false, just asking what they are specifically worried about."

"What about the others?"

"Keep them all."

"Template comments will affect the statistical appearance."

"Statistics are not voting."

The next day, three of the four local submitters were willing to meet.

Two of them were young people from Dongqiao Village, and the other was a photography enthusiast living in the North Residential Cluster.

The things the three people were truly worried about were different.

The first villager worried that the groundwater level would drop after construction, affecting their home well.

The second worried that the truck lights near the wetland were too bright, preventing them from seeing the stars at night.

As for the photography enthusiast, he had once photographed a flock of black-winged stilts in the Northern Wetland. He worried that road noise would affect migratory birds stopping by.

"The template was copied from a chat group," the first villager said very candidly. "I didn't know how to write it, but I felt that one looked serious."

"Is completely destroying the wetland your judgment?" the EIA personnel asked.

"No. I'm just afraid the well will run out of water."

"Then you can supplement your comments. There's no need to withdraw the original one."

"Can it still be changed?"

"You can add an explanation."

The second young man also looked somewhat embarrassed.

"I mainly saw online that the Logistics Park would be as bright at night as during the day."