16
In fact, Xingkong Aerospace's commercial space station plan not only posed no threat to SpaceAKS, but might even help their future plans.
Because SpaceAKS claimed publicly that they were researching how to rely on the BFR to send hundreds of people to Mars and build a self-sufficient alien city.
And if Xingkong Aerospace really launched a commercial space station plan...
Then they would still have to figure out how to assemble three metal modules in low Earth orbit and rent this thing out.
This matter did not even require SpaceAKS to adjust any of its established research and development plans.
And to some extent, this was actually beneficial to them.
If Xingkong Aerospace truly matured the concept of a commercial space station,
then in the future after the BFR went into operation, SpaceAKS might even be able to conveniently transport supplies for Xingkong Aerospace's space station and earn transportation fees.
This was also the reason why SpaceAKS relaxed when they learned about Xingkong Aerospace's future plans.
Because this could hardly be considered competition for them; instead, it was cultivating the low Earth orbit market for their future Mars route.
...
Meanwhile, at the NASAN headquarters in Washington,
the atmosphere was completely different from the slightly relaxed vibe in the SpaceAKS conference room in California.
The atmosphere inside the NASAN headquarters building was somewhat gloomy.
NASAN Administrator Jim Bridenstine had just finished a meeting.
Its topic was precisely the follow-up transition plan for the International Space Station ISS.
On his desk lay a newly signed document.
The value of this single piece of paper was roughly around eleven million US dollars.
Because this was a "Commercial Low Earth Orbit Development Support Contract".
This was also a "model project" deliberately made by NASAN for Congress to see.
It was purely meant to prove that the commercialized space station plan was viable.
And it was also to prove that NASAN decentralizing low Earth orbit was a correct decision.
Because only in this way could they ensure sufficient subsequent budgets.
At this moment, he placed Xingkong Aerospace's blueprint for a three-module commercial space station on top of all official documents.
He sat in his chair for a moment,
then picked up the documents on the desk and went to the next meeting again.
Inside the conference room,
a director of the ISS Transition Office looked at the blueprints in front of him and said indifferently,
"The outside world estimates the construction cost of Xingkong Aerospace's commercial space station plan to be 50 billion.
But this is calculated according to the traditional construction standards of our NASA and the ESA.
In that set of accounts, there are actually many things that are completely unnecessary for Xingkong Aerospace."
He paused for a moment, then continued speaking,
"But if we apply Xingkong Aerospace's recovery and reuse data,
this cost calculation algorithm is logically wrong.
Their orbit-insertion cost is simply not on the same level as ours.
... "
Hearing the director's words, the entire conference room quieted down.
In fact, this point in time was indeed a bit awkward for them.
Because the attitude from the White House had already been made very clear.
That was to terminate direct financial appropriations to the ISS in the future year of 2025.
This was forcing NASAN to commercialize low Earth orbit and make the aerospace industry self-sufficient.
Because the annual cost of maintaining the space station was also a considerable burden for the White House.
Therefore, NASAN had to prove that the commercial orbital station plan was viable so that they could continue to get money from Congress.
But they were also afraid that private projects would fail.
And once commercial aerospace was falsified, for them, the entire transformation policy would be completely overturned by Congress.
I do not know how long passed before someone's voice rang out again in the conference room.
This was an audit department leader, and he spoke in a low voice,
"The most troublesome thing right now is not whether Xingkong Aerospace can succeed or not,
but that their success or failure will have a huge impact on us."
"If they succeed, it is fine.
That would be equivalent to doing free publicity for us, by the way helping us brainwash Congress to prove that the commercial low Earth orbit path is viable."
"But once Xingkong Aerospace's commercial space station plan ends up unfinished, or gets out of control, turning on-orbit failures into space debris,
then I estimate those capitals will directly lose confidence in the commercial space station track.
I am afraid that by then our CLD project, and even all subsequent commercial aerospace support budgets, might be affected.
... "
This was actually the core concern of many NASAN high-level executives.
To be honest, their inner feelings towards Xingkong Aerospace's commercial space station plan were truly very complicated.
Deep down in their hearts, they even felt a little secretly pleased, because they wanted to leverage this, but on the other hand, they were afraid of suffering a backlash.
Bridenstine spoke up at this time,
"Pay no attention to them.
This is not a threat to us.
We can use them as a control group.
If they succeed, it can be considered as indirect evidence that our 2025 transition route is correct, and passing Congress's barrier will be very easy.
If they fail, it will just confirm the judgment that low-Earth-orbit projects 'without government order commercial stations are bound to die'.
By then, we can ask for the CLD budget with even more justification.
Anyway, no matter which result, NASAN's budget for going to the moon and Mars cannot be moved by a single cent.
As for the muddy waters of space station commercialization, let them wade through it first."
...
Meanwhile, at the ESA headquarters,
the atmosphere here was even more oppressive.
Although they were in a cooperative relationship with NASAN,
their current predicament was a bit ominous.
NASAN at least had deep space exploration to fall back on.
Coupled with the backing of the White House budget, and private systems like SpaceAKS to trial-and-error and bottom-out for them,
but what about the ESA? In this cooperative relationship, it had always played the role of an appendage.
Throughout their long international space station cooperation cycle,
ESA could be said to be an investor, a component supplier, or even a laboratory module tenant.
But it had never controlled the discourse power over the rules of low Earth orbit.
At the long table in the conference room, representatives of the seventeen member states were sitting there,
but their gazes all fell on the commercial space station blueprint released by Xingkong Aerospace.
The entire conference room was so quiet that even a pin dropping on the floor could be heard.
I do not know how long passed before the representative of France took the lead in breaking this silence.
"Heh!
Every year we have to tug-of-war with each other over the ISS operation and maintenance funds,
share the budget with Germany, and beg the European Union for module upgrade funds.
Every small modification has to go through multi-national voting and layers of approval.
And Xingkong Aerospace, look at them, they actually finalized the space station plan so quickly.
Sometimes I am really a bit envious!"
...
