"However, its operational logic still has many incompatibilities with the low-altitude field environment."

"Especially when dozens of data streams surge in within the same millisecond."

"This chip's bus bandwidth, parallel computing power, and instantaneous throughput capacity simply cannot handle it. This is also why the prototype hit a wall before. It was because it would get stuck on decision-making and have route confusion, but this wasn't an error in the AI logic; it was caused by the chip's own insufficient computing power."

"Although we've managed to reach this point through a series of measures, we've hit the ceiling. Going any further would mean sacrificing detection reliability to gain operational fluency, which in actual combat is tantamount to crippling oneself."

In short, the hardware must be upgraded.

He then laid out the general plan that had been developed at the testing ground earlier.

After filling in the details, the project was officially approved and named the Airborne Edge AI Computing Special Project.

November 20th, 10:00 AM. On the outskirts of Shenzhen, the gates of the Xingchen Microelectronics No. 22 wafer fab slowly opened.

This time, Jiang Huaixing did not arrange a large entourage. He only brought Zhang Hongxing and two technical personnel from Xinghan Semiconductor.

Their vehicle drove directly into the inner passage of the factory area. The corridor surrounding the entire cleanroom could truly be called spotless. It was so quiet that one could only hear the continuous humming of the ventilation system.

Upon receiving notification, the factory manager hurried over. He was just about to present the report PPT he had rehearsed, but Jiang Huaixing waved his hand and interrupted him before he could start.

"No need for the formalities, let's go straight to the EVT production workshop."

After saying this, the factory manager immediately replied, "Very well, Mr. Jiang, please follow me."

After putting on one-piece cleanroom suits and passing through the air shower, the group finally walked into the manufacturing production workshop where the lights never went out.

Upon entering, they saw an assembly line stretching for hundreds of meters. A series of duv lithography machines were running steadily, while robotic arms precisely grabbed wafers. Pale silver silicon wafers flowed between the various processes. The air was filled with a faint scent of specialty chemicals.

There were actually not many workers on the entire production line; only a few technicians were behind explosion-proof glass, staring intently at the process parameters constantly flickering on their screens.

The factory manager walked beside Jiang Huaixing and reported the current situation in a low voice. "Currently, Factory No. 15 and No. 16 are fully producing 28nm process wafers. A portion is supplied for our own use in baixing mobile main control and radio frequency chips, while the remaining capacity is used for external orders. The current order schedule is locked through the first quarter of next year; it is the company's stable cash cow business."

Suddenly, Jiang Huaixing stopped. He looked through the protective glass at a duv lithography machine performing a multi-exposure process. "There's no problem holding the 28nm base, but we cannot stop there."

After a pause, Jiang Huaixing added, "What is the current capacity release situation at Factory No. 22? How is the progress on yield and manufacturing cost improvement for our independent 7nm commercial production line?"

Upon hearing this, the factory manager immediately replied, "Factory No. 22 has achieved 7nm mass production by relying on the duv multi-exposure solution. We have achieved stable supply, and the yield is steadily climbing. However, objectively speaking, the biggest previous difficulty remains prominent: the production cost per wafer is on the high side, and the speed of capacity expansion is limited. Currently, many people in the industry are still taking a wait-and-see attitude. Within Xingchen Microelectronics, there are also dissenting voices. Many suggest slowing down the expansion pace and prioritizing the cultivation of mature processes, then investing funds into projects with faster returns, as that is what most companies in the industry do."

Jiang Huaixing shook his head slightly upon hearing this. "The choices of our peers are based on their own resources and judgments. But we cannot sway with the short-term trends of the market."

"Indeed, even the 28nm process is enough to support current consumer electronics. But this cannot become the cornerstone for the latest generation of smart devices. Take, for example, the autonomous drone swarm that completed verification at the White Star Technology suburban testing ground a few days ago. Because it requires an airborne lightweight AI processor, we must rely on advanced processes in the long run. You have to realize that at the same computing power, 7nm chips have lower power consumption and smaller size, and can withstand high-altitude temperature differences and continuous vibration; this is a hardware limit that is very difficult for 28nm chips to achieve. If we purely rely on modifications of mature processes, then performance and battery life will always have bottlenecks."

At this moment, a technical staff member from Xinghan Semiconductor who had come along also spoke up. "I was just planning to discuss this with you. Currently, the airborne AI chip for drones cannot directly reuse the mobile SoC architecture. Because the requirements for wide temperature range, vibration resistance, and low latency are completely different. Therefore, we plan to rely on the 7nm process platform of Factory No. 22 to open up a completely new chip R&D branch specifically for developing computing chips for unmanned equipment."

The factory manager thought for a moment after hearing this, and then said, "Hmm, this should be possible, because Factory No. 23 will soon be put into use. By then, the manufacturing pressure for 7nm chips will be much less. Let's discuss this issue properly when the time comes."

After discussing this matter, the group continued to walk slowly along the production line.

Jiang Huaixing's gaze fell on the endless stream of silicon wafers, and he said, "While maintaining steady expansion in mature processes to ensure the company's cash flow, the 7nm advanced process expansion and process optimization at Factory No. 22 cannot slow down either. Other companies might think that advanced processes require huge investment and carry high risks, so they can wait and see. But we cannot. Because future competition will by no means be limited to the smartphone track. Unmanned equipment, aerospace airborne hardware, and automotive computing platforms all cannot do without autonomous and controllable advanced computing chips. Every bit of R&D capital invested now, and every process difficulty overcome, will turn into a moat that others will find hard to catch up with in a few years. Therefore, we cannot stop our forward momentum."

Arriving at the workshop exit, everyone took off their cleanroom suits. Subsequently, Jiang Huaixing looked at the factory manager and said, "Hold a special project initiation seminar next week. The drone airborne AI chip project must be started as soon as possible. By then, R&D manpower and budget can be appropriately tilted and allocated. Xinghan Semiconductor and White Star Technology also need to synchronize and connect with the Factory No. 22 process team as soon as possible. Only in this way can Xingchen Microelectronics reserve a dedicated tape-out channel."