16
Inside the assembly workshop of Blue Sea Aerospace, a module was undergoing its final vibration test.
This was seventeen days behind their original schedule.
Originally, after cutting the AI operations and maintenance module, they thought they could save three months of debugging time.
As a result, what they saved time on was replaced by other problems.
Without real-time AI monitoring, all on-orbit statuses could only be judged afterward via ground telemetry.
This meant that the sensor density on the module had to double, because every node that could potentially have a problem needed an independent hard-wired sensor that did not rely on AI inference.
With more sensors, the weight of the wiring harness went up, and the trim balancing had to be redone.
"The dry weight of the maiden flight module now exceeds the design value by forty-three kilograms."
The structures director slammed the report onto the table and said loudly,
"Now we can say that we've cut all non-critical payloads."
"But it still exceeds the limit."
"If we cut any more, there will only be an empty shell plus the propulsion system left."
"How about we just add propellant?" said the person in charge.
"We'll cover the overweight forty-three kilograms with the fuel margin."
"But if we add too much fuel, it will be overweight again."
"Then cut one of the backup thrusters."
As these words fell, no one spoke in the meeting room again.
After all, it started with cutting the AI.
Then came adding sensors, followed by overweight counterweights, then adding fuel, and then cutting the backup.
One link was intertwined with another, and every step was eating away at the margin of the next step.
This was the price of their strategy of "having it first, then optimizing it."
It wasn't simply "surviving means winning," but rather stripping away the fault-tolerant space layer by layer while trying to survive.
"Push forward according to plan," the person in charge finally said.
"We must complete the final assembly by the end of February."
"By late March, or early April at the latest, we will transport it to the launch site."
"After all, mid-May is the launch window we've set."
"Mid-May?"
The launch scheduling director frowned and said,
"That happens to be the six-month on-orbit node for Starry Sky Aerospace's starship No. 2 docking module."
"Isn't this timing a bit bad?"
"There will definitely be quite a few media outlets comparing us with Starry Sky Aerospace by then."
"Compare if they want to compare."
"When we make our maiden flight, they will have already been running in the sky for half a year."
"This is a fact, and we simply can't avoid it."
"But we can present a different narrative."
"For example, we are a purely independent launch into orbit, not a docking verification."
"This positioning is different."
"The positioning is different, but our investors won't see it that way."
"I'll handle the investors."
...The same week.
Beijing, an office of a venture capital firm.
Blue Sea Aerospace's Series B financing roadshow.
"Although our maiden flight module has simplified the AI module, the core of this launch is that the on-orbit validation capability is completely retained," said the CEO of Blue Sea Aerospace on stage.
"After entering orbit, we will verify three core indicators: autonomous attitude control, propulsion system reliability, and basic thermal control circulation."
"Because these three are the foundation of all on-orbit activities."
At this moment, someone in the audience raised a hand and asked, "Then compared to Starry Sky Aerospace, where is your differentiation?"
"Starry Sky Aerospace follows a highly intelligent route, with complex coordination between module segments, and its technological ceiling is very high."
"But its iteration cycle is also very long."
"What we follow is a high-reliability route."
"It is about pushing 'on-orbit survival' to the extreme first, and then gradually stacking intelligent capabilities."
"Both paths lead to the same destination, but our maiden flight pace is faster."
"How much faster?"
"We can achieve our maiden flight in mid-May."
"Starry Sky Aerospace's module No. 3 won't go up until the end of the year at the earliest."
At this time, another person raised their hand and said, "But their dual modules will have already stayed in space for six months by the time of your maiden flight."
"That is correct."
"Although Starry Sky Aerospace is one step ahead of us, aerospace is not a 100-meter dash, but a marathon."
"The one who goes to space first doesn't necessarily reach the finish line first," the CEO of Blue Sea Aerospace paused and continued,
"The key lies in who can continuously stay in orbit, continuously iterate, and continuously generate commercial value."
Although this answer received polite applause at the roadshow venue, the private feedback from investors after the meeting wasn't so polite.
"The narrative is fine, but the data is too thin," a partner said to a colleague.
"Over at Xingkong, they have real data from six months in orbit—failure rates, AI decision logs, power scheduling records—all laid out right there."
"What does Blue Sea Aerospace have to compare with? A design proposal that hasn't even flown yet?"
"But if Blue Sea Aerospace's maiden flight is successful, it at least proves that the second route for private enterprises is viable."
"The entire domestic aerospace market cannot have just one player."
"What the market needs are players who can make money."
"Xingkong's valuation has already reached around 58 billion US dollars."
"If Blue Sea succeeds in its maiden flight, it should reach around 3 billion or so."
"The gap is right there."
"Are those 3 billion US dollars?"
"That's definitely in Chinese Yuan!"
Wencheng.
Starry Sky Aerospace Technology Center.
Jiang Huaixing saw the news of Blue Sea's maiden flight in an industry weekly report.
"Mid-May, Jiucheng, simplified single-module orbit entry."
The AI Group Leader sent over a screenshot of the news.
"They cut all AI modules, doubled the sensors, and only kept a single backup for the propulsion system."
"A single backup."
Jiang Huaixing read it once and then said, "Does that mean there is only one backup thruster?"
"Yes. According to normal design, it should be dual backup, but they cut one, probably to save weight."
"Aren't they afraid that if the main thruster has a problem after entering orbit, there is only one backup to switch to, and then if the backup has a problem too?"
"Then it's game over."
Jiang Huaixing put down his phone, and while looking at the structural diagram of module No. 3, he said, "Then we don't need to worry about them."
"Not worry about them? But if their maiden flight is successful, the media will definitely compare them with us."
"Then let them compare," Jiang Huaixing said without lifting his head.
"Blue Sea is taking another path."
"How long their module can survive in space after being sent up, what it can do, and how many times it can iterate—these are the keys."
"It's not just about getting it up into space and calling it a day."
"But President Jiang, aren't you afraid they'll snatch the market?"
"Snatch what market? Commercial aerospace hasn't even fully grown a market domestically yet."
"Blue Sea's successful maiden flight is a good thing for the entire industry."
"After all, with one more private enterprise passing on-orbit verification, capital's confidence in the industry increases by a fraction."
"The entire environment will also improve along with it."
"As expected of President Jiang, your vision is grand."
"This isn't having a grand vision. This is a fact."
Jiang Huaixing put down his pen and then continued,
"Besides, they cut the AI."
"This means that after their maiden flight, on-orbit operations and maintenance will completely rely on ground commands."
"The command delay from the ground to space is at least 0.8 seconds, making it too late to react to complex failures."
"If their module has a problem, it can only hard-defend through preset autonomous protection logic, without real-time AI diagnosis and adjustment."
"You mean..."
"I mean, if they encounter the same problem after their maiden flight as we did before sending our first module up..."
"...their only solution is to rely on the ground team to manually analyze telemetry data and then upload commands for correction."
"This cycle takes at least several hours to several days."
"Whereas we..."
He pointed to the simulation curve on the screen.
"We are already preparing module No. 3."
