16
Late February 2020.
This was the 92nd day in orbit for Starry Sky Aerospace's dual-module assembly.
And Starry Sky Aerospace's contingency plan had long been prepared.
They planned to choose a stable period before transitioning from the sunlit zone to the shadow zone, without directly modifying hardware from the ground, only sending uplink commands to put Xingyu AI into "Restricted Stress Test Mode".
Then, they would artificially lower the operating point of Docking Module A's solar wings by 18%.
At the same time, they would temporarily raise the power consumption of a non-critical payload on the test module to 120% of its rated peak.
With the two actions combined, the assembly's margin was instantly squeezed from "7% margin" to "near 0 margin".
At this moment, Jiang Huaixing was also in the flight control hall.
The Chief Engineer spoke.
"Injection initiated."
As soon as the words fell, the telemetry curve jerked.
The bus voltage dipped by 0.4 volts, though it did not cross the safety threshold.
However, the assembly's energy margin bar jumped from green to yellow.
Immediately after, the thermal control loop began to react as well.
With the solar wing angle depressed, the module absorbed less heat; the radiator outlet temperature on one side began to drop, while the experimental payload on the other side was dissipating heat, tearing a seam right through the thermal equilibrium.
The AI Group Leader spoke up.
"The AI is taking over."
This time, the AI didn't "act immediately" like it did in the early dual-module days.
It first spent 0.6 seconds assessing the situation.
Was this power deficit persistent or transient? Would the thermal control deviation recover on its own?
Only after completing its assessment did it begin to take action.
First, it did not cut off the scientific payload; it merely throttled it from "full power" down to "derated operation" to preserve experimental continuity.
Then, it slightly over-adjusted docking module b's solar wings by 0.3%, feeding that tiny bit of excess power into the bus;
Finally, it kicked up the heat exchange pump speed in the test module's central loop by one notch, channeling heat toward the cold side instead of firing up backup heaters and burning power.
"Graceful degradation."
The AI Group Leader uttered those four words.
"Something it only learned after three hundred rounds in simulation, yet it pulled it off on its very first try in space."
Right after that, however, an unexpected hitch still occurred.
Because the shadow zone had arrived.
Solar wing power generation dropped to zero, and the battery pack stepped in.
Yet because the AI had just over-adjusted docking module b's solar wings by 0.3%, a slight mismatch developed between Module B's battery charging curve and that of the test module.
This was not a malfunction, but rather "two batteries competing for the charging rhythm of the same bus."
A reverse glitch of 0.2 volts appeared on the bus voltage.
The head of the power system stood up abruptly.
"The beat frequency is back."
This time it wasn't solar wing ripple beating, but battery charge-discharge strategy beating.
It hadn't occurred before because during the last test, both battery packs were in nearly identical states.
Now, however, they had already been in orbit for three months.
Consequently, the degradation curves of the two battery packs had diverged, and the AI's old dynamic equalization parameters didn't fully cover this new dimension yet.
Jiang Huaixing looked at the Chief Engineer and asked,
"Does this require ground intervention?"
"No. Give it three minutes."
The Chief Engineer thought for a moment and said,
"Let's see if it can detect the battery aging discrepancy on its own."
At second 47, the AI dialed down docking module b's charging current upper limit by 1.2 amperes.
At 1 minute and 12 seconds, it shifted the test module battery's equalization window from "once per orbit" to "equalize after shadow period ends";
At 2 minutes and 3 seconds, the reverse glitch vanished, and the bus voltage smoothed out.
Although no one in the flight control hall clapped, several people breathed long sighs of relief.
The AI Group Leader pulled up the decision log left by the AI.
Notably, this was not code, but a natural language summary.
"Detected dual-module battery SOC (state of charge) deviation widened to 2.7%; original equalization strategy did not cover this operating condition.
Reordered charge-discharge sequence according to the principle of'stagger peaks first, fine-tune later, maintain uninterrupted loads.'
Recommended ground team supplement training dataset for multi-module battery aging discrepancies."
"It's writing its own post-mortem."
The Algorithm Group Leader was momentarily stunned and said,
"This doesn't seem to be hardcoded logic we wrote."
The AI Group Leader remarked,
"This should be something it deduced on its own from the dual module's real-world operational data."
Jiang Huaixing walked over, just in time to see the Algorithm Group Leader save that summary into the three-module training library.
The Chief Engineer spoke up at this moment.
"Note this down first: three modules are not simply three hulls.
It has three battery sets with different aging states, three solar wings with distinct power generation characteristics, and three modules with different thermal inertias.
We used to think the difficulty was 'multi-node scheduling,' but the real challenge is that every node becomes a new node over time."
The Algorithm Group Leader chimed in from the side as well.
"So the three-module AI can't just be trained in simulations; it has to rely on the dual modules, on grinding it out in space little by little over time like this."
That evening, a short on-orbit test briefing was sent to Chief Designer Li.
AI graceful degradation under resource constraints: Success;
New-type battery beat frequency: AI autonomous convergence;
No hard load cuts triggered;
Ground control: zero takeover throughout.
...
In the early hours of the morning, Chief Designer Li replied with a single sentence:
"Good, wonderful!"
...
Early March.
Beijing, Aerospace Science and Technology Corporation General Department.
Chief Designer Li took that core edition white paper out of his drawer; a handwritten reference number had been added to the cover: "ST-General-Eval 【2020】 No. 017".
He hadn't written this.
Rather, it had been approved by someone higher up.
After some thought, he picked up the phone and dialed a number.
"Old Zhao, what came of that matter you looked into for me?"
After a few seconds of silence on the other end, the voice said,
"The preliminary feedback is out.
The General Department's stance is 'open to discussion,' but the Engineering Headquarters' take is 'wait and see.'"
"What does 'wait and see' mean?"
"It means the data isn't enough yet.
Until Starry Sky Aerospace's dual modules run for a full six months, they won't initiate formal project review.
However..."
At this point, Old Zhao lowered his voice and said,
"There's a new development up top.
The Manned Space Engineering Office is formulating a framework for a 'Commercial Aerospace Support Pilot Program.'
The first batch will likely only offer two or three spots.
If Starry Sky's data before May can prove six months of stable operation for the dual modules, they'll definitely make it into this pilot program."
"What's the difference between a pilot and formal supporting contractor status?"
"A pilot is 'do the work first, but with no commitment for what follows,' whereas formal supporting contractor status means 'integrated into the engineering plan, backed by budget and milestones.'
Yet a pilot has an advantage: low threshold, fast decision-making, and no need to go through the full review process.
It's equivalent to boarding the train first and buying the ticket later."
"When will it be decided?"
"The framework document will release a draft for comment by April at the earliest.
If all goes smoothly, the first batch of pilot selections will be announced in May or June."
...
Chief Designer Li hung up the phone and locked the white paper back in the drawer.
He leaned back in his chair and rubbed his temples.
...
