"High-speed rail? 360 kilometers per hour?"

"How fast does a regular train go again?"

"I remember taking the train from Shuhan City to Guang City took us three days and two nights!!"

"That was because we couldn't get tickets and had to take the slow train... Even the faster ones now take over a whole day, around 25 to 30 hours!"

"If you do the math, Train K191/K194 covers over 1,800 kilometers, averaging just 60 to 70 kilometers per hour...!"

"With over 1,800 kilometers and so many stops, of course the average speed is slow... But compared to the fengtian-qinshi passenger dedicated line, regular trains are indeed much slower!"

"360 kilometers per hour... If a train ran that fast between Shuhan City and Guang City, it would take just over four hours!"

"They said that's only the top test speed. The trial operation speed is only 250 to 280 kilometers per hour... Besides, it wouldn't be non-stop, right? There'd be intermediate stops along the way! There's no way it would take just a few hours!"

"Even so, that's still very fast. I just wonder when they'll start building high-speed rail from Shuhan City to Guang City... It would be so much more convenient to go back and see the kids!"

"Among the developers of the 'china star' EMU, there's actually Beichen Group? Isn't that the company of that genius professor from our Shuhan City?"

"It really is Beichen Group. Han Wentao isn't just a professor anymore... He's been elected an academician! A member of both academies, no less!"

"They've already sold cars abroad, and now the fastest train in the country was built by his company... I heard they're already working on airplanes; what's next, building rockets?!"

"Why not spaceships while they're at it? That doesn't have much to do with us anyway!"

"How can you say it has nothing to do with us? High-speed trains might become widespread in the future, and traveling anywhere or going back home will be so much easier!"

"..."

Across the entire country.

Many people returning home from work saw the news, whether watching the evening First News live or a rebroadcast.

Or across municipal and provincial news channels, reports regarding the 'fengtian-qinshi passenger dedicated line' were everywhere.

A top speed of 360 kilometers per hour, with zero errors;

A trial operation speed of 250 to 280 kilometers per hour;

On the surface, this news seemed to have little to do with ordinary people.

In reality, for the many migrant workers who had left their hometowns, seeing these reports after getting off work caught their attention.

And sparked discussion.

If this kind of high-speed rail network expanded across the country,

it would drastically cut down travel time for migrant workers.

Because of a phenomenon unique to Dongda: the Spring Festival travel rush!

It was a massive migration involving hundreds of millions of people!

Seeing the 'fengtian-qinshi passenger dedicated line' reach a top speed of 360 kilometers per hour... everyone couldn't help but look forward to the day when such a fast 'train' would run between their workplaces and hometowns.

Would going home for the New Year become much more convenient?

In the past, people only had time to return home during the New Year.

Aside from the holiday itself... another reason was that the New Year holiday was long enough to justify the dozens of hours spent traveling back and forth.

For shorter holidays, most of the time would simply be eaten up sitting on a train.

If these 360-kilometer-per-hour 'trains' became widespread, maybe they could visit home during other holidays too.

And perhaps even avoid the peak of the Spring Festival rush?!

Aside from the 'fengtian-qinshi passenger dedicated line',

the most discussed topic was unexpectedly Beichen Group.

As Han Wentao's accolades—such as 'youngest National Award winner,' 'youngest doctoral graduate,' 'youngest professor,' 'youngest Nobel Prize laureate,' and 'youngest academician'—were reported by the media,

or rather, bombarded by news coverage,

everyone came to know Han Wentao and the various companies under Beichen Group.

After all, Beichen Automobile had already made quite a few headlines.

Now, whenever people saw a company with the name Beichen, the first thing they thought of was Han Wentao's company.

Building cars, building trains, and rumored to be building airplanes... what's next, building rockets?!

In fact, building rockets was indeed in Han Wentao's plans.

...

After the New Year, at the beginning of spring in February, the 'fengtian-qinshi passenger dedicated line' was officially put into operation.

Official plans also revealed new developments.

The construction plan for high-speed passenger railways was finalized.

Over the next five years, multiple high-speed rail lines would be completed across the country.

At the same time, Academician Liu, as the chief designer of the 'china star' EMU, stated in a media interview:

"The next-generation 'china star' EMU is already in development."

"In the future... the speed of the 'china star' EMU will be further increased!"

"Currently, what restricts high-speed rail speeds isn't actually the EMU... but the railway tracks themselves!"

"The current bearing capacity of the railways and related infrastructure cannot support the 'china star' EMU running at top speed..."

"Going forward, our goal is not just to develop a faster, next-generation EMU!"

"Right now, our more critical objective is to solve the issue of track bearing capacity and fully unleash the EMU's speed potential!"

The research and development results of the 'china star' EMU passed inspections by multiple departments, and the cabinet approved its deployment into service.

Not only was the entire project saved,

but it had also become one of the nation's most crucial development strategies!!

Dongda was vast with abundant resources!

Airplanes were highly efficient!

But the operating costs of airplanes were also sky-high!

Whether for passenger or freight transport... air travel was simply too expensive.

Railways!

High-speed rail!

That was the true main artery, the lifeblood connecting every major city across Dongda!

The 'china star' EMU project... and the nationwide high-speed train construction plan had already been incorporated into the nation's key development strategic guidelines!

Written into national policy!

Academician Liu and the project team were naturally in high spirits!

Back then, the entire project was on the verge of being axed... and now, it was elevated to a key national development strategy, written into state policy!

Currently, Academician Liu's team was still researching next-generation EMUs and high-speed trains!

However, that priority had to be slightly downgraded... What was more urgent was solving the railway track problem!

The current track capacity couldn't even support the DJJ2 china star EMU running at 360 kilometers per hour.

What was the use of developing an even faster EMU then?!

Only by improving the railway technology itself and upgrading track bearing capacity

could the full speed of high-speed EMUs be unlocked.

Currently, Beichen Group and Academician Liu's entire team had already begun tackling the technical hurdles of the railway system.

They focused on resolving issues with materials and components such as seamless rails, ballastless tracks, catenary systems, and pantographs;

Previously, railways were made by joining short rail sections of ten to twenty meters, leaving gaps at the joints that produced a clattering sound as trains rolled over them.

For high-speed trains traveling at over 200 to 300 kilometers per hour, such gaps were fatal!

Continuous welded rail had to be used, eliminating the gaps between rails through welding techniques and fusing hundreds or even thousands of kilometers of track into a single whole—completely eliminating joint impacts!

This allowed high-speed trains to run with exceptional smoothness even at extreme speeds!

Beyond the rails, traditional railway tracks were ballasted tracks, where rails were laid on crushed stone.

With high-speed trains exceeding 250 kilometers per hour, the resulting airflow would send ballast flying like bullets!

Not only did this pose a safety hazard, but the track bed was also prone to deformation, requiring frequent maintenance at high costs.

High-speed railways had to adopt ballastless tracks, using a solid foundation of reinforced concrete to replace the gravel ballast.

This provided structural stability, maintained track geometry over the long term, and offered a lifespan extending several decades.

Routine maintenance was only about 10% of that required for traditional tracks, drastically cutting both frequency and cost.

High-speed railways were electrified railways, and traction power supply was the very "blood" of high-speed trains!

In the past, overhead catenary components came in a bewildering variety of designs and types without standardized specifications, and the technology fell far short of modern high-speed rail requirements.

The catenary system had to be standardized and simplified; while reducing the number of cantilever components, it also needed to boost stability and integration, laying the groundwork for smart construction and maintenance once high-speed rail was deployed on a massive scale.

At the same time, pantograph-catenary interaction technology required significant improvements.

When a high-speed train operated, the friction and electrical arcing between the pantograph and the catenary generated high temperatures that eroded contact wires and collector strips, increasing friction coefficients and contact resistance, or even causing system failures.

This demanded an extremely high degree of contact wire straightness—with precision within 0.05 millimeters—as well as intelligent technology to ensure stable current collection.

These challenges spanned materials, component manufacturing precision, sensors, chips, software, and more—all of which required assistance from Beichen Group.

In addition to technical and component issues across the board,

they also needed to work with National Construction Group to investigate and resolve engineering challenges like roadbed subsidence, bridges, and tunnels.

As well as software challenges for train control and dispatching systems once high-speed trains were rolled out on a large scale.