Auntie Liu watched from the side: " This one is leaning a bit outward, push it inward a little. Right, just like that. That's enough salt, that's enough, go easy on it. "

After packing a little less than half a jar, Auntie Liu told Su Manman to rest for a while and continued packing it herself.

As she packed, her mouth didn't stay idle: " Manyuan, let me tell you, this pickled Chinese cabbage looks simple, but there are actually a lot of intricacies to it. "

The cabbages must be firm, and the heat must be well-controlled when scalding them; if under-scalded, they easily rot, and if over-scalded, they lose their crunch.

Also, this jar must be scrubbed clean, and not a single speck of oil can be left. "

Su Manman listened and committed every single detail to heart.

She watched Auntie Liu pack the last cabbage in, sprinkle another handful of salt, and press it down firmly.

The jar was almost full, and the cabbages were packed neatly, layer by layer.

" All right, there's only the last step left. "

Auntie Liu carried a large, thoroughly washed stone over from the corner of the wall: " This stone was used by my old man when he was still alive, and it's been used for many years. "

" Pressed on top, the cabbages won't float up. "

She placed the stone squarely and steadily on top of the cabbages.

Su Manman looked at that stone, and then looked at Auntie Liu.

Auntie Liu patted her hands, walked around the jar, and nodded with satisfaction: " All right, put it in a shady place in the corner and don't touch it. It will be ready in about twenty days or so. "

" Twenty-some days? "

" Absolutely. "

Auntie Liu pushed the jar to the corner, covered the opening with a piece of white cloth, and tied it tightly with a rope: " With the weather in the Northeast, it's cold and fermentation is slow. "

Pickling Chinese cabbage in the summer takes only a few days, but in the winter, it takes at least twenty days upwards.

When you smell a sourness and see that the leaves have turned thoroughly yellow, it can be eaten.

If you want it a bit sourer, leave it for a few more days. "

Su Manman nodded and helped tidy up the stove.

Auntie Liu gathered the remaining cabbages, added a handful of firewood into the stove mouth, replenished the water in the pot, and prepared for the next batch.

" Manyuan, have you learned it? We are going to make the next jar now. Mainly, you will do it hands-on, and I will watch and remind you if anything is wrong. " Auntie Liu wiped her hands.

Su Manman nodded: " All right, I've learned a new skill today. Thank you so much, Auntie. "

" What's there to thank! "

Auntie Liu waved her hand: " When you young people live your lives without elders around to help and support you, I'll help out however much I can. "

" Besides, seeing you eat happily makes me, as an auntie, happy too, right? "

Su Manman smiled and began to move the basket of cabbages she had brought over.

Once Su Manman moved the cabbages over, the two of them continued working.

This time Su Manman was much more proficient. Scalding the vegetables, packing them, and sprinkling salt—she did them one by one, while Auntie Liu watched from the side and offered compliments from time to time.

The jar was packed full, and Auntie Liu helped press the stone down, cover it with white cloth, and tie the opening tightly.

The two jars squatted side by side in the corner, round and plump, looking delightful at first glance.

Auntie Liu said with satisfaction: " As for this jar of yours, when your Educated Youth Huo comes back, have him come and carry it back. "

" All right, thank you so much today, Auntie. "

The two of them tidied up the kitchen again.

" Then Auntie, since things are done here, Xiaoxuan and I will head back first. "

Su Manman went into the courtyard to call Xiaoxuan.

Xiaoxuan and Xiaohuzi were squatting in the snow building a snowman, their little cheeks frozen red. The two of them grabbed handfuls of snow back and forth, building it with great enthusiasm.

" Xiaoxuan, let's go. "

" Sister, let me play a little longer! " Xiaoxuan didn't even turn his head.

Just as Su Manman was about to call him, Auntie Liu stopped her: " Let the child play. It's still early, I'll send him back later. "

Su Manman went back first to cook.

There are very few things to do in the winter in the Northeast, leaving plenty of time. For Su Manman, this was a good thing, as she could settle down and study properly.

These past few days, Su Manman went to the farm again. Mother Su's illness had improved, and she looked a bit more spirited. Su Manman's previously panicked heart had also calmed down somewhat.

Su Manman left malted milk extract and milk powder for Mother Su, telling her to nourish her body well. Winter was not very friendly to frail people.

Entering December, the weather became intensely cold.

Waking up in the morning, layer upon layer of frost formed on the windows, so thick that you couldn't scrape it off even with your fingers.

Every morning, a thin layer of ice formed in the water vat, and when scooping water, one had to break that layer of ice first.

A thick layer of snow had accumulated in the courtyard, making a crunching sound when stepped on, and it wouldn't melt for half a day.

That night, Huo Qingling came back later than usual.

It was already pitch dark. When the courtyard door was pushed open, Su Manman was stir-frying dishes by the stove, and hearing the commotion, she poked her head out.

Huo Qingling walked in, carrying the coldness from outside on him. His padded jacket sleeves were stained with frozen soil debris, and he took off his gloves and stuffed them into his pockets.

" You're back? "

Su Manman shoveled the last dish into a plate.

" Wash your hands and let's eat. "

Huo Qingling let out a "Mn" and went to scoop water to wash his hands.

Xiaoxuan ran out of the room and spun around him: " Brother-in-law, why are you so late today? "

" There was a meeting. "

" What meeting was it? "

" A meeting at the construction site. " Huo Qingling rubbed his head and didn't say much more.

The three of them sat down to eat.

Su Manman picked up a chopstick of vegetables for Huo Qingling. He lowered his head and ate it without speaking.

She glanced at him. There was little expression on Huo Qingling's face, but his movements of picking up food with chopsticks were slower than usual, as if something was weighing on his mind.

After finishing dinner, Xiaoxuan helped clear the bowls and chopsticks, and was shooed away by Su Manman to wash his face and feet.

Huo Qingling stood by the stove washing dishes, the water splashing with a rushing sound. He washed very slowly, scrubbing each bowl several times.

Su Manman was wiping the table and the stove, and glanced at Huo Qingling.

" What's the matter with you? "

Huo Qingling put the washed bowls away: " The construction schedule is tight. If we keep working like this, we won't be able to finish the task before the New Year. To rush the schedule, we have to stay at the construction site. "

Su Manman's movements paused for a second: " Stay at the construction site? How long? "

" Hard to say. If fast, twenty-some days; if slow, we'll have to stay until before the New Year. I have to stay at the construction site starting tomorrow. "

Xiaoxuan poured away the foot-washing water and poked his head out: " Sister, brother-in-law, I'm done washing, I'm going to sleep first. "

" Go ahead, tuck yourself in well with the quilt. "

Xiaoxuan acknowledged and walked out the door toward the room where he slept. The door closed, and the room quieted down.

Su Manman tidied up the last bits of things in the kitchen, wiped her hands, and turned around to rummage through the cabinet.

She took out a large jar of mushroom and minced pork sauce.

That was something Su Manman had just made a couple of days ago: the mushrooms were diced, the minced meat was stir-fried until golden brown, mixed with soybean paste and chili peppers, and it smelled extremely fragrant.

Originally saved to eat slowly, right now she moved the jar out of the cabinet, found a clean piece of cloth, wrapped the bottle up nicely, and tied it tightly with a rope.

" Take this with you. " She placed the jar of meat sauce on the table.

Huo Qingling glanced at it: " Leave this for you and Xiaoxuan to eat. "

Su Manman didn't look at him and went to rummage through the cabinet again: " We can just make more at home. What kind of good food can there be at your construction site? Steamed buns with pickles, eating them dry—you won't even have the strength to work after eating that. Take this with you, mix it with rice or stuff it in steamed buns, at least it will have some flavor. "