16
"This machine is called a Mixer! We use conveyor belts to transport raw materials like Cement, sand, gravel, and water into the Mixer's 'feed inlet'. Through the rotation of the machine, these raw materials can be mixed into Concrete ready for construction in a very short time. The mixed Concrete then flows out from the discharge outlet over here, directly into the Steam Trains for transport in all directions."
"There are ten Mixers here working simultaneously. The discharge outlets correspond to the ten train carriages parked here."
"The entire mixing process takes only ten minutes. Oh, minutes are a unique way of measuring time in Kaoshan Village. Ten minutes is less than the time it takes for a stick of incense to burn, and in that time, we can fill ten Steam Train carriages simultaneously!"
While Gao Dazhuang was explaining, the discharge outlet began to clatter, and the mixed Concrete started flowing from the Mixer into the carriages.
"For instance, this Steam Train is specifically for transporting Concrete to the West City Wall. Our city walls use a brick-Concrete structure, with Concrete making up one-third of it. The Concrete in this single train is enough to build a section of the wall one meter high and ten meters long."
"By the way, the meter is also our own unit of distance; one meter is equal to one-third of a zhang," Gao Dazhuang explained patiently.
"Of course, because our city walls are built so long and high, the Concrete transported by this single train is still just a drop in the bucket."
"However, we can transport at least one hundred and fifty carloads of Concrete every day. With construction continuing day and night, it will only take about three hundred days and roughly forty-five thousand carloads of Concrete to complete the entire West City Wall."
"As for the city walls on the east, south, and north sides, there are Mixers working there as well, with efficiency similar to this side."
"So, in the fastest scenario, the construction of the city walls can be completed in about three hundred days."
"Of course, the Concrete here also needs to supply the entire city's road network and housing construction, which is why we calculated the total construction time to be one and a half years."
"The construction progress for the Capital and the other Satellite City is also about the same. My Lords, do you have any other questions?"
When Gao Dazhuang finished speaking, despite the large crowd present, it was incredibly silent, save for the rumbling sound of the Mixers rotating nearby.
No one spoke.
Many ministers were left speechless.
The officials from the Ministry of Works, in particular, were still in shock from the figures Gao Dazhuang had mentioned and hadn't yet come to their senses.
They were already aware of the carrying capacity of Steam Trains.
The amount of Concrete each carriage could transport was already a staggering figure.
And just from this location, over a hundred carloads could be shipped out in a single day!
If converted to manual labor, even if a hundred workers mixed desperately for two hours, they probably couldn't produce a single carload of Concrete!
Even working day and night without rest, they could only mix a dozen or so carloads at most in a day.
Yet here at the Mixers, with only a dozen or so workers, they could mix over a hundred carloads a day!
Using one-tenth of the workers to complete ten times the workload!
The engineering efficiency had increased a hundredfold!
This was a truly astounding figure!
Not to mention that the Steam Train as a mode of transport was countless times superior to traditional ox-carts, horse-drawn carriages, or hand barrows...
Thus, at this moment, the officials of the Ministry of Works finally felt that Kaoshan Village might actually be able to complete the construction of the new city within a year and a half...
