16
Facts proved that the Madrid Nightless City plan proposed by Carlos was very effective.
The news of the Madrid Nightless City not only shocked many Europeans but also shocked many countries in European countries.
It was not just Britain and France; the Great Powers, including Germany, Austria, Russia, and Italy, also expressed concern about this. The citizens of these countries also demanded that their Governments build their own "City That Never Sleeps" to demonstrate their nation's strength.
While Britain and France were still hesitating, Germany became the first country to take action. As a driving force of the Second Industrial Revolution, Germany's sense for the electric power industry was unmatched by other countries.
The only country that could be mentioned in the same breath as Germany regarding the importance of electricity was perhaps the United States across the ocean. However, because the United States was separated from European countries by the Atlantic Ocean, news traveled more slowly there than in other European countries.
Other countries in European countries could receive the news on the day after Christmas, but the United States would receive the relevant news reports no earlier than the third day.
December 26, 1879, Berlin, German Empire.
At this time, the German Government was holding a meeting, and the main topic of discussion was the cost required to build Berlin into a "City That Never Sleeps."
Germany was also involved in electric power technology, and some German scientists had developed things like Generators and light bulbs, so theoretically, there was hope of building a "City That Never Sleeps."
Even if the effect could not compare to Spain's "City That Never Sleeps" for the time being, they at least had to build something similar to declare to the public that Germany remained a powerful and advanced country in the emerging field of electricity.
"Has the fiscal budget required to build a 'City That Never Sleeps' been calculated?" Prime Minister Bismarck looked at the Minister of Finance and asked.
The Minister of Finance had a serious expression and gave an answer that made Bismarck's face change instantly: "Currently, if we build streetlights on the main streets of Berlin, we need to invest at least 60 million marks. If we build streetlights in most large cities, we need at least 500 million marks of investment."
"Considering the different geographical environments of each city and the different local electricity demands, the funds we need to invest might be even more."
"Overall, this is completely an uneconomical deal, at least for us right now. Even just for the Berlin streetlight system, at least dozens of power stations would need to work together."
"Just the labor cost for these dozens of power stations would require at least thousands of people. The time just to manufacture the Generators might take several months, and by the time everything is completed, it will be at least half a year later."
Bismarck rubbed his temples, feeling somewhat helpless about this terrible news. According to the Minister of Finance, building a "City That Never Sleeps" would be a huge expense and would take a long time to complete.
"Damn it, if it costs so much, why was Spain able to create the first 'City That Never Sleeps' before all other countries?"
"Even if Madrid has a smaller population, it must have at least 500,000 people! Berlin needs 60 million marks; Madrid would need at least 30 million pesetas."
"Would the Spanish grit their teeth and bear an expense as high as 30 million pesetas just for the little bit of face the 'City That Never Sleeps' brings?"
"This is simply unbelievable. This money is enough to build two of the most powerful ironclads; wouldn't it be better to use it to build the Navy?" Prime Minister Bismarck said in disbelief.
For European countries, if the finances were affluent, the first choice would definitely be developing industry or developing the Navy.
The scale of the Navy also measured the strength of a Great Power. Countries that only had a strong Army would not receive too much attention in European countries, unless they were neighbors of these land-based powers.
No matter how strong the Army was, it could not bypass other countries to attack one's own, whereas the Navy could. This also led European countries to often regard the Navy as the most important branch of the military when measuring a country's comprehensive strength, with the Army being secondary.
Prime Minister Bismarck simply could not understand the Spanish operation. If building a "City That Never Sleeps" required such a large expense, what exactly were the Spanish building it for?
"This is a very terrifying result. Perhaps in the electric power industry, the Spanish have already reached the forefront of all countries. Only in this way can they reduce the cost of building power stations and using electricity, allowing Spain to recklessly build a 'City That Never Sleeps' to attract our attention." German Emperor William I spoke up at this moment.
European countries were not fools. Spain being able to take the lead in creating a "City That Never Sleeps" also meant that Spain must have reached the forefront of European countries in the electric power industry.
How to judge was also very simple. If one could also quickly create a "City That Never Sleeps," it would prove that the results Spain achieved in the electric power industry were not outstanding.
But if a strong country like Germany could not quickly build a "City That Never Sleeps," it would prove that the results Spain achieved in the electric power industry had already surpassed Germany, and had even maintained a significant lead.
The German Foreign Minister nodded and explained to German Emperor William I and Prime Minister Bismarck: "According to the news sent back by the ambassador to Spain, the Spanish used unknown high-power power generation equipment. There are less than ten power stations around the entire Madrid, yet the electricity produced supplies the lighting for the entire city center of Madrid."
"It is said that the electricity cost in Madrid has already dropped by more than half, and quite a few factories are already considering installing light bulbs to provide lighting at night."
"In the era of electricity, the achievements of the Spanish are indeed significant. I think we can cooperate with the Spanish in this regard and use some of the industrial technologies we excel at to exchange for the Spanish electric power technology."
Prime Minister Bismarck glanced at William I, and seeing that William I did not object, Bismarck then nodded and made his decision: "Let the diplomatic ambassador contact the Spanish Government and inquire about the price of Spain's power generation equipment and light bulb technology."
"No matter how great the cost of the 'City That Never Sleeps' is, we must keep up. Electricity brings more than just lighting; if we can achieve good results in the electric power industry, perhaps Germany can have a brighter future."
At this time, Prime Minister Bismarck still held great power. Following his order, the German Government became busy, all carrying out their work.
Unlike the decisive German Government, France, which had deep hatred for Germany, was currently in a dilemma.
As a Great Power directly bordering Spain, the news of the Madrid Nightless City reached France immediately.
Before the French Government could react, the impatient citizens of Paris began to demonstrate, demanding that the Government build a "City That Never Sleeps" to demonstrate France's strength.
The protests of the Parisian public made the French Government panic, and important Government officials did not even dare to appear in public.
Unable to find the Government, the Parisian public turned their guns and surrounded the city Government. Anyway, the Paris city Government was also the Government, and condemning them was absolutely correct.
Inside the Paris city Government at this time, the official serving as the Mayor of Paris had a livid expression. He tried to contact the Government by telegram, but the other side gave a response telling the Paris city Government to handle it themselves.
Isn't this a joke? How could the Paris city Government handle it? Were they supposed to build streetlights in the streets and alleys of Paris according to the opinions of the public?
Anyone with a discerning eye could see that this was a huge expense. For the Paris city Government, even if their finances were relatively affluent, they absolutely could not bear such a huge expenditure.
It should be known that the political systems of European countries were relatively clear. The finances of the Paris city Government were relatively affluent, but they also had to be responsible for the city construction and infrastructure maintenance of the entire Paris, as well as the salaries of all officials in the Paris city Government.
As the largest and most prosperous city in France, Paris also had the highest fiscal revenue of all cities in France. This also led to Paris having difficulty obtaining fiscal appropriations from the Government, and various expenditures generally relied on the fiscal revenue retained by the city Government to tide over difficulties.
No matter how rich the Paris city Government was, it was impossible to bear the cost of building streetlights alone. Previously, because of the Franco-Prussian War, the urban area of Paris had suffered varying degrees of destruction.
Just rebuilding the urban area had caused the Paris city Government to owe a large debt, and it took several years to pay it off.
If they had to rely solely on the Paris city Government to build streetlights, I'm afraid that by the time the streetlights were built, the citizens of Paris would have already been replaced batch after batch.
The Mayor of Paris expressed his dissatisfaction and resentment towards the Government while ordering officials to lock the gates of the city Government tightly to prevent the dissatisfied public from rushing directly into the city Government.
The combat effectiveness of the Parisian citizens was no joke. If the citizens were allowed to rush into the city Government, no one dared to guarantee what would happen.
The Mayor of Paris did not want such a parade to turn into an armed conflict, eventually evolving into a bloody revolution.
Judging by past experience, whether a revolution succeeded or not was not important; what mattered was that once a revolution broke out, the officials of the Paris municipal Government would be the first to bleed.
The different attitudes displayed by various Governments toward the Madrid Nightless City actually reflected their understanding of the electric power industry.
It was not without reason that Germany was able to become one of the fastest-developing countries during the Second Industrial Revolution; the entire nation was highly sensitive to the electric power industry. They had long since seen clearly the changes that the electric power industry would bring to industrial technology and placed great importance on such technology.
As for Britain and France, it could not be said that they did not value it. The problem was that building a city that never sleeps required a massive capital investment, and the widespread application of electricity would also affect the existing industrial system.
Carlos did not pay too much attention to what was happening in other countries; after all, after the successful debut of the Madrid Nightless City, things were quite busy within Spain itself.
The success of the Madrid Nightless City also represented the formal entry of electricity into the commercial era, where the public could pay to experience this brand-new energy source.
Of course, the cost of electricity at this time was still relatively high. Even though the birth of high-power Generator had already reduced the cost of power generation, the cost of electricity generation in Madrid was still as high as about 1.6 peseta per kilowatt-hour.
Power plants needed a certain level of profit to continue operating, and there was also significant loss during the transmission of electricity.
This also resulted in electricity costs in Madrid being as high as 2.5 peseta per kilowatt-hour, meaning ordinary people faced relatively high costs for using electric lights for illumination.
Calculating based on the power of the light bulbs, a 15-watt light bulb consumed 0.015 kilowatt-hours of electricity in one hour, while a 35-watt light bulb consumed 0.035 kilowatt-hours in one hour.
Assuming a household needed to install 4 small light bulbs and the average lighting time for each bulb was 1 hour per night, the electricity cost for each household would be as high as 0.15 peseta per day, or 54.75 peseta per year.
However, Spain's per capita annual income was only 139.71 peseta, meaning the annual electricity bill for each household was almost 40% of the per capita annual income.
To give an easier-to-understand example, suppose someone in later generations had a monthly income of 5,000 yuan, making their annual income 60,000 yuan. According to the electricity costs in Spain at this time, this person would need to pay nearly 24,000 yuan in electricity bills annually, which was absolutely staggering.
Although this electricity bill was the cost for the entire household, for any commoner family, it was a significant expenditure.
Moreover, people's daily use of electric lights was definitely far more than 1 hour. As the usage time increased, the electricity costs would also continue to increase.
According to the current per capita income in Spain, less than one-tenth of the people in all of Spain could afford to use electricity; these people were basically nobles, Capitalists, and some middle-class individuals with higher incomes.
The good news was that although only one-tenth of the population in Spain could afford electricity, a significant portion of this one-tenth resided in Spain's capital, Madrid.
This was also the reason why Carlos planned to build the Madrid Nightless City in Madrid, because these nobles did not care at all when spending money; when they had electricity, they really used it.
After the Madrid Nightless City became big news across Europe, the nobles of Spain also dreamed of installing large numbers of streetlights and electric lights in their own castles and manors.
These light bulbs could not only provide illumination but could also demonstrate the strength of the castle or manor owner to the outside world.
Just on the second day of Christmas, dozens of nobles contacted Gramme's Electricity Company through various means, requesting the Electricity Company to lay circuits for their castles and manors, and to install corresponding streetlights and light bulbs.
It was fortunate that Carlos had established the Electricity Company for the commercial use of electricity; otherwise, these nobles would never have been able to find out about the existence of the Electricity Laboratory.
Regarding the requests of these nobles, after seeking instructions from Carlos and obtaining his consent, Gramme nodded and agreed to cooperate with them.
Since the establishment of the Electricity Laboratory, it had not yet provided any income to Carlos. Although one should not be stingy with investments in scientific research, for Gramme, he still wanted to prove his own value by generating income.
Although only a few dozen nobles wanted to lay circuits and build streetlights in their manors and castles, these nobles were basically high-ranking nobles, dukes and above.
These high-ranking nobles had one thing in common: they possessed countless castles and manors, and often it was not just one castle or manor that needed circuits laid.
The electricity consumption of these high-ranking nobles was also much higher than that of ordinary commoners; the streetlights in their castles and manors would sometimes even be left on all night, which was a considerable source of income for the Electricity Company.
What Carlos did not expect was that the Spanish nobles were not the big clients of the Electricity Company; the German Government was the real big client.
No matter how rich the nobles were, their goal was only a few dozen or a hundred streetlights plus a small power station specifically to provide electricity for the streetlights.
But the German Government's requirements were different. The German Government directly requested ten large power stations plus thousands of streetlights; they clearly also wanted to imitate Spain to build a city that never sleeps, which also meant that the German Government had made up its mind to invest a lot of capital.
Of course, the German Government did not intend to invest too much capital in streetlights and electricity. The German Foreign Minister made a request to the Spanish Government, which was to exchange industrial technology that Spain did not have for Spain's electric power technology.
Among these industrial technologies were Germany's latest steelmaking technology, the most advanced artillery technology, and some technologies related to chemical engineering and medicine.
Carlos was quite interested in these technologies and was willing to exchange Spain's existing electric power technology for them.
The reason he was willing to exchange them, besides the fact that the industrial technologies provided by Germany were indeed attractive, was that the electric power technology currently mastered by Spain would soon be upgraded, and there was no need to cling to these technologies.
For example, Spain's existing light bulb technology was still the earliest carbon-filament light bulb. Gramme's Electricity Laboratory had already begun researching light bulbs made of other materials, and it was currently expected that there would be new finished products soon.
The new finished products would not only have higher brightness compared to carbon-filament light bulbs but would also have a longer service life. It was precisely because of this that Carlos was willing to hand over the existing light bulb technology to Germany; in any case, this was a product that would be phased out sooner or later.
The same logic applied to the Generator. Unlike Gramme's ring-armature Generator, the two-phase Generator developed by Tesla possessed greater potential, and the current power generation capacity was only at the most initial level.
If everything Tesla said in his last report to Carlos was true, then Spain was about to welcome high-power Generator with a power generation capacity of over 50KW, and naturally, it would look down upon the pseudo-large Generator that currently only had a power generation capacity of 26.5 KW.
The upgrading of technology was just that fast. After transitioning from a ring-armature Generator to a two-phase Generator, a major explosion in power generation capacity in a short period of time was inevitable.
The increase in power generation capacity also represented one thing: that higher-power light bulbs and electric motors could now be used.
The reason the electric power industry had only been a hypothesis was that the previous Generator power was too low and could not drive higher-power electric motors at all.
This also resulted in factory owners, if they used electricity as an energy source, facing costs for electricity alone that were enough to bankrupt their factories.
But in the situation of having high-power Generator, such a situation would be greatly improved. Once Spain possessed Generator with a power generation capacity of over 50KW, Spain's power generation cost would reach below 1 peseta, and the public's electricity cost could also be controlled at around 1.5 peseta.
Under such circumstances, more families and factories would be able to afford electricity, and the electric power industry and the electric age would truly have hope of arriving.
Added to the industrial technology and related materials exchanged between Germany and Spain, Spain would definitely be able to become a promoter of the Second Industrial Revolution, achieving significant development in industry and the economy.
