16
Due to the insane maximum overload run just moments ago, the underground laboratory's entire power supply network had completely gone on strike.
Not only had the hardware protection relays for several supercapacitor banks blown and tripped, but even some of the auxiliary grid's insulated cables gave off a scorched smell after failing to withstand the terrifying instantaneous current peak.
According to operating procedures, the equipment needed to be shut down and cooled, and it would take the logistics maintenance team at least a full day to replace the fuses and recalibrate the power grid.
However, to core personnel like Academician Ma Jingning and Professor Lu Weidong, this was no longer of any concern.
Burned hardware could be replaced, but the experimental data they obtained today was an invaluable treasure capable of reshaping the landscape of global naval warfare.
After arranging the maintenance team's tasks, this group of core researchers rushed into the main conference room without even taking off their lab coats, each clutching data reports still warm from the printer, to convene an immediate emergency wrap-up meeting.
Inside the conference room, Professor Lu Weidong stood at the head of the long table. His voice was hoarse from several days of shouting, yet at this moment, it carried an unmistakable tremor of fanaticism.
"Maximum instantaneous peak current: exceeded the design redline by fifty percent."
"Red copper main rails and auxiliary bias coil arrays: intact, with minimal surface temperature rise."
"The most critical Physics metric—the slider's friction coefficient is infinitesimally close to zero, and the kinetic energy conversion rate of the launch reached ninety-seven point four percent! Truly absolute zero ablation!"
As Professor Lu Weidong read the compiled core figures aloud,
even though everyone present had witnessed the miracle of that faint blue light film with their own eyes just moments before, hearing these cold, hard, and utterly staggering figures plunged the conference room into an overwhelmingly stifling silence.
How could they not be shocked?
How could they not fall silent?
As engineering experts who had fought on the front lines against material limits and thermodynamic dissipation for years, they understood all too well what an absurd, science-fiction-level concept a "near-zero friction coefficient" and a "97.4% conversion rate" represented in the real, physical world.
They had assumed that the scheme Lin Ye provided would at most suppress ablation to an acceptable degree, meeting their initial design target.
Who could have imagined that he had straight-up overturned common Physics sense!
Not only did he resolve the problem, but he also casually elevated performance into a dimension they hadn't dared to dream of!
To them, a rail with virtually no ceiling was the very definition of an unbelievable feat.
Amidst the wordless shock, everyone's complex gazes involuntarily converged on Lin Ye, who was sitting quietly on one side of the long table.
Was this the dimensional reduction strike brought to upper-level engineering applications by a breakthrough in foundational Physics theory?
Such an unreasonable, crushing superiority utterly shattered the understanding of these top engineers.
After a long silence, Professor Lu Weidong finally could not hold back his intense curiosity. Looking at Lin Ye with burning eyes, he asked, "Dr. Lin, I really can't keep it in anymore. Was this orthogonal magnetic field design of yours, which completely defies common sense, derived from the 'important theoretical problem' you mentioned earlier?"
"Have you... fully conquered that theory? Also, what on earth was that faint blue film of light we saw on the ultra-high-speed camera? How could it withstand tens of thousands of degrees without burning through the rails?"
Sitting next to Professor Lu Weidong, a veteran electromagnetic researcher with graying hair could not help but chime in, "Exactly, Dr. Lin! We built your orthogonal magnetic field strictly following your blueprint, but when we were building it a few days ago, I tried reverse-calculating it using the classic Maxwells Equations. Under existing electromagnetic theory, a magnetic field of that specific frequency couldn't possibly generate such flawless containment! What is its actual mechanism?"
...
Facing the barrage of eager inquiries fueled by sheer thirst for knowledge,
Lin Ye set down the water cup in his hand, looked at everyone, and nodded in a remarkably calm tone. "That's right. The theoretical issue that troubled me was fully resolved, and its mathematical proof was completed in the lab a few days ago."
"As for the faint blue light film you saw..." Lin Ye paused slightly. "It is a brand-new physical mechanism derived and discovered under specific electromagnetic conditions based on my theoretical breakthrough—essentially a new effect."
The moment those words were spoken,
Boom!
Every person in the conference room dilated their pupils in shock, as if a thunderbolt had struck their minds. Several people's mouths hung open unconsciously from utter disbelief.
A theoretical breakthrough that predicted and uncovered a brand-new physical mechanism in reality?!
Having dedicated their entire lives to scientific research, how could they not realize the terrifying weight behind that nonchalant sentence!
In the history of Physics, using pure mathematical theoretical derivations to accurately predict the existence of an unknown particle or the emergence of a brand-new physical effect, and ultimately having it confirmed experimentally... was an achievement of the highest caliber, one that would outright secure a Nobel Prize in Physics!
It was just like Paul Dirac predicting the existence of antimatter on plain paper through his exquisitely elegant Dirac equation, or Peter Higgs using a mathematical mechanism to predict the God particle, which was confirmed decades later by the Large Hadron Collider.
And now, in this underground laboratory, simply to help them repair a launch rail, Lin Ye had derived a new theory on paper and even proven a brand-new physical mechanism!
Just as everyone began trembling with excitement, itching to press further on what this new mechanism was and how it worked,
Lin Ye raised his hand with a smile, making a pressing-down gesture to quell their fervor.
"Respected seniors, I know you must have ten thousand questions right now," Lin Ye said apologetically. "However, the foundational theory I resolved is a state-classified project. Before completing the formal declassification and upward reporting procedures, it's not appropriate for me to disclose the specific mathematical details of the theory and its effect to everyone here."
Lin Ye added, "Don't worry, though. Given the strategic importance of our electromagnetic launch team to the military, once I return to Shangjing and finish the classified reporting procedures, the higher-ups will definitely issue dedicated documentation regarding this theory and effect to your team."
Hearing Lin Ye's explanation, everyone froze for a moment before sudden comprehension dawned on them.
No wonder!
No wonder Lin Ye had only handed them blueprints and parameters over the past ten-odd days without uttering a single word about the underlying logic—it turned out to be a classified topic!
Having worked in defense industry units for so many years, security awareness was ingrained into the marrow of these experts' bones.
Since Lin Ye had put it that way, everyone immediately swallowed their curiosity whole, nodding solemnly in understanding, not daring to ask another word about the theory.
Seeing this, Academician Ma Jingning, seated at the head of the table, cleared his throat and decisively seized control of the meeting's pace.
"Alright! Since the theory is a state secret, we won't pry or make blind guesses!"
Academician Ma Jingning braced his hands heavily against the table and stated loudly, "Lin Ye has already chewed through the hardest bone for us. Now that this rail system achieves zero friction and zero ablation, the rail's physical load-bearing capacity is no longer our bottleneck!"
"So, comrades, the pressure is on us now!" Academician Ma Jingning looked around the room. "The only thing our electromagnetic launch system lacks right now is energy! What we need to discuss is how to completely overhaul our existing power supply system to squeeze every bit of maximum performance out of this zero-drag rail!"
With the chief designer's command, the atmosphere in the conference room instantly transitioned from awe over the new theory to an impassioned engineering debate.
...
"The chief designer is right!" Professor Lu Weidong immediately pulled up the overall electrical topology diagram of the aircraft carrier and shouted, "Since the slider no longer experiences friction resistance, we can crank up the initial acceleration even higher! We have to redesign the discharge array of the supercapacitor matrix and elevate the instantaneous discharge threshold by another thirty percent!"
Another senior engineer responsible for energy distribution added excitedly, "There's also the adaptation with the aircraft carrier's main power system! When the time comes, our Carrier 003 must recoodinate with the 703 Institute! During the carrier's catapult takeoff phase, the power distribution matrix of the ship's power plant must be dynamically rewritten, pouring all the redundant electrical energy originally reserved for overcoming friction directly into our catapult without reservation! We won't just be launching thirty-ton fighter jets; with this system, we can fling fully loaded early warning aircraft and heavy bombers straight into the air!"
When discussing how much power it could potentially provide, someone even joked, "By then, we won't need to worry about whether our electromagnetic launch provides enough power, but whether the airframes they build and the pilots' bodies can endure it!"
Laughter broke out across the conference room, filling the space with jovial energy.
And while they were engaged in this passionate discussion,
Academician Ma Jingning leaned back slightly against his chair, stepping out of the heated discussion circle.
He turned his head and looked deeply at Lin Ye, who was sitting quietly to the side, listening to their discussion with a faint smile.
Academician Ma Jingning did not say anything.
He simply reached out with his calloused hands, which had held wrenches and blueprints for decades, and patted Lin Ye heavily on the shoulder twice.
Those two simple pats, devoid of any spoken words, spoke louder than thousands of phrases.
Lin Ye turned his head and met Academician Ma Jingning's gaze.
In Academician Ma Jingning's weathered eyes, Lin Ye saw an extraordinarily pure and moving emotion.
It was the profoundest gratitude of a veteran patriot who had worked until his hair turned gray for the nation's military industry, who had just witnessed a miracle capable of altering the nation's destiny, directed at a young junior blessed with god-tier talent; it was also the relief and trust of seeing that the future of China's science and technology finally had worthy successors.
Lin Ye understood that look.
Without standing on ceremony or saying anything more, he looked into the old academician's eyes and nodded slightly, with utmost solemnity and firmness.
...
And so, this debriefing and forward-planning meeting in the main control room carried on.
With the biggest Physics conundrum completely smoothed out by Lin Ye, what followed was an absolute free-for-all carnival of creativity for top electrical engineers like Professor Lu Weidong.
When it came to upgrading the aircraft carrier's integrated power system, their minds were already brimming with countless wild ideas. In the past, constrained by the pitiful load-bearing threshold of the track, no one dared to act recklessly. But now that the shackles were gone, radical proposals for squeezing energy to its limits and optimizing discharge arrays were all tossed onto the table, sparking heated debates throughout the conference room.
As for Lin Ye, he very consciously stepped back from the discussion circle.
An aircraft carrier's integrated power system was an immensely intricate system-level engineering project, involving power allocation for energy propulsion, hull structural layouts, and various other highly specialized domains.
Although he was invincible in mathematics and Physics theories, he was not omniscient. There was no need to force himself into the spotlight in engineering applications where he did not specialize; being a quiet listener was more than enough.
...
Just like that, the next morning arrived.
Inside that dedicated research office, Lin Ye opened his suitcase and packed up his belongings.
...
The matters here in Jiangcheng had been completely and successfully resolved. Whether it was the theoretical decoupling of MH or the practical transformation of electromagnetic launch, both had borne fruitful results. It was time for him to bow out having accomplished his mission and head back home.
Beside him, the young researcher Xiao Li, who had been taking care of his daily needs, was briskly helping Lin Ye fold clothes and tidy up the items on the desk.
While packing, Xiao Li stole glances at Lin Ye from the corner of his eye from time to time, his eyes filled with undisguised fanaticism and admiration.
Despite how cheerfully Xiao Li called him "God Lin" every day, Xiao Li was actually a PhD graduate from one of the country's premier military industry universities, already in his early thirties.
Yet when facing this young man who was more than a decade younger than himself, he could not muster the slightest senior arrogance; he treated Lin Ye entirely as an unassailable giant and idol.
If two weeks ago, when Lin Ye first arrived, he was merely a "theoretical powerhouse who proved the N Equation" in Xiao Li's eyes—impressive, yet carrying a sense of distance—then after yesterday's earth-shattering limit test concluded, Lin Ye's standing in his heart had multiplied exponentially, elevating him straight to divinity!
In less than a month, he had not only resolved the incurable ablation affliction that had stumped the entire national electromagnetic launch team, but had even forcibly raised the theoretical ceiling of this technology!
A prodigy of this caliber was something Xiao Li had truly never seen in his entire life.
Just as Xiao Li was overwhelmed with emotion, there came two gentle knocks on the research office door.
Academician Ma Jingning pushed the door open and walked in with a chuckle. "Almost done packing?"
Lin Ye zipped up his travel bag, turned around, and smiled. "Almost. With Brother Li lending a hand, packing goes quite fast."
Academician Ma Jingning stepped forward and patted Xiao Li's shoulder. "Xiao Li, go ahead and attend to your tasks. I need to speak with Lin Ye in private for a moment. I'll help him pack the rest of this stuff."
"Understood, Chief Designer." Xiao Li nodded sensibly, stepped out of the room immediately, and pulled the door tightly shut behind him.
Only the two of them remained in the room.
As Academician Ma Jingning naturally helped Lin Ye slide a few reference books on the desk into the bag, he chatted casually with him.
"Those guys held their discussion until past three in the morning last night, and the initial draft for the subsequent power supply system upgrade plan has already been finalized. If things move fast, we can build the first complete upgraded track on the ground before the end of the year," Academician Ma Jingning said with a smile.
Lin Ye waved his hand and said with ease, "You are all top-tier engineering experts, so I won't worry about the specific upgrade plans. I'll just wait to see your final results."
Academician Ma Jingning nodded, then paused what he was doing, his expression turning exceedingly serious.
"Lin Ye, the help you provided in this project can be described as turning the tide. Rest assured, our entire team will firmly remember this favor," Academician Ma Jingning promised solemnly, looking at Lin Ye. "When we report the upgrade plan and test data to the higher Military Commission later, I will place your name at the core of the report, emphasizing to higher-ups the decisive role you played in this, and will never let your hard work be overlooked."
"As well as the Rim-driven Pump-jet back then, and the blueprint scheme you provided."
Such commendations concerning core breakthroughs in major national instruments carried staggering weight.
Lin Ye naturally understood Academician Ma Jingning's goodwill. Not being hypocritical or declining, he simply offered a modest smile: "Then thank you very much, Academician Ma."
After the two finished packing the luggage, Academician Ma Jingning placed the backpack on the desk.
He remained silent for a moment, looked at Lin Ye, and suddenly remarked out of the blue, "Actually, Lin Ye, there's something I never brought up with you. That excellent young scientists fund project you applied for regarding 【MH Three-Dimensional Nonlinear Decoupling】... during the classification meeting back then, I was one of the classification experts."
Hearing this, the expression on Lin Ye's face froze abruptly, instantly revealing an astonished look.
...
"You... you've known what my project was from the very start?" Lin Ye was somewhat surprised.
It turned out he had known everything about what he was working on right from the start!
Seeing Lin Ye's surprised expression, Academician Ma Jingning could not help laughing heartily.
"Haha, of course I knew! Otherwise, why do you think I paid so much attention to you from the beginning?" Academician Ma Jingning explained with a smile. "It's just that before you thoroughly resolved this problem, according to the strict confidentiality regulations, even if I was the classification officer, I couldn't casually disclose relevant details to you as the project lead. So I held it in all this time."
Lin Ye came to a realization, but then asked with some puzzlement, "Then why are you willing to disclose it now?"
"Because you've already completed it!"
Academician Ma Jingning said as if it were obvious, "Since the theoretical breakthrough is made, once you return to Shangjing and formally submit the project closure application to higher authorities, they will definitely organize an ultra-high-spec internal confidential symposium to review your theoretical findings."
Academician Ma Jingning pointed to himself and smiled. "And when that time comes, the expert review panel will still be us old fellows who handled the original classification. Since we'll be meeting in the conference hall before long anyway, it doesn't hurt for me to say it ahead of time now."
Only then did Lin Ye fully understand.
Then, Academician Ma Jingning stepped forward, pressed heavily on Lin Ye's shoulder, and spoke with intense anticipation in his tone: "Lin Ye, I am very much looking forward to your performance at that internal symposium. Rest assured, as long as nothing unexpected happens, when that meeting takes place, I will personally attend bearing the extreme test data of our electromagnetic launch from these past few days."
"No matter how flawless mathematical formulas appear on paper, someone will always nitpick. But if supported by our real military operational data featuring zero ablation, it will serve as irrefutable ironclad proof! When that time comes, I'll personally stand up for you at the symposium and provide the strongest endorsement for the significance of this achievement!"
Hearing Academician Ma Jingning's unreserved support and commitment, warmth filled Lin Ye's heart. He nodded with utmost solemnity: "Thank you, Academician Ma. Sorry for troubling you."
"All right, don't stand on ceremony with me."
Academician Ma Jingning withdrew his hand, looking at the excessively young youth before him who had achieved miracle after miracle, his gaze turning deeply complex.
"Go back and keep up the great work, Lin Ye."
The old academician's voice was somewhat low, yet filled with an epoch-spanning certainty: "I have a very strong premonition... one day, you kid will lead our China, and perhaps even all of humanity, into a new era that we wouldn't dare even dream of."
"A new era?"
Lin Ye murmured silently in his heart.
In his mind, that schematic resting quietly in the depths of the system pointing toward the future sea of stars—the 【Next-Generation High-Energy Electro-Propulsion and Extreme Field Architecture Theoretical Manual】—seemed to be radiating a faint glimmer.
Lin Ye did not voice any contradiction. He simply picked up his bag from the desk and smiled brightly under Academician Ma Jingning's expectant gaze.
"From your lips to reality. I will do my best."
...
