16
October 25, 1998, Jingzhou.
In the conference room on the ninth floor of the Provincial Investment Building, an oval conference table was covered with dark green baize.
On the wall hung a freshly printed site selection planning map for the wafer fab project, with several alternative plots along the coast of Handong Province circled in red.
Qi Tongwei sat at the head of the conference table, with an informally faxed reply from the Singaporean government spread out in front of him, and next to it lay the due diligence report on Great Wall Bank sent by Gao Xiaoqin from Hong Kong.
Secretary Tang Yuan, General Manager Hu Yunfeng, Vice President Zhang Xinquan, and Li Shengyuan were all present.
In front of Minister Wang Xiaoni of the Finance Department, Section Chief Chen Siyuan of the Legal and Risk Control Department, and Section Chief Li Wenjie of the Investment Development Department also lay a draft project framework.
"Singapore has already sent a preliminary reply," Qi Tongwei pushed the fax in front of General Manager Hu Yunfeng.
"The asset management company under Temasek has agreed to invest 200 million US dollars, taking equity valued through technology, accounting for about 13% of the joint venture.
Guo Group has also confirmed: 100 million US dollars, accounting for 6.5%.
The matching funds of 1 billion RMB from the State Planning Commission have been included in next year's special plan, mainly for civil engineering and domestic matching equipment.
Provincial Investment Group will invest 1 billion US dollars, holding a 65% controlling stake.
The remaining 15.5% will be reserved for future strategic investors and employee stock ownership platforms.
The total scale is 1.5 billion US dollars, and the funding package is closed."
He opened the draft project framework in front of him and continued.
"The main entity for this capital operation is Great Wall Bank in Hong Kong, and Li Fuchun has already led the investment banking department team to complete the design of the joint venture architecture.
The core concept is a three-tier architecture—the top layer is a joint venture holding platform established in Hong Kong by Provincial Investment Group and the Singapore asset management company, utilizing Hong Kong's British Commonwealth legal system for international capital transfer; the middle layer is a wholly foreign-owned enterprise registered in the Jingzhou Bonded Zone by the joint venture holding platform, responsible for equipment import and technology introduction; the bottom layer is a manufacturing company established in Jingzhou through a joint venture between the wholly foreign-owned enterprise, Provincial Investment Group, and Guo Group, responsible for the actual operation of the wafer fab."
General Manager Hu Yunfeng took the joint venture architecture diagram and scanned it from beginning to end.
He had worked in Provincial Trust for many years and had seen many cross-border structures, but this three-tier architecture designed by Great Wall Bank had every tier stepping on different legal systems and regulatory frameworks, seamlessly fitted together.
He put down the architecture diagram and looked up at Qi Tongwei.
"The design of using a wholly foreign-owned enterprise as the middle layer is the most ingenious part of the entire architecture.
The Wassenaar Arrangement's export controls on semiconductor equipment mainly target end users in mainland China, while the middle layer enterprise is a Hong Kong-funded wholly-owned enterprise registered in the Jingzhou Bonded Zone—legally speaking, the equipment importer is a bonded zone enterprise controlled by a Hong Kong company, not a mainland enterprise.
Customs and the Ministry of Commerce have special regulatory measures for enterprises in the bonded zone importing self-use equipment, without conducting end-use reviews.
This three-tier architecture not only has the credibility endorsement of international capital, but also complies with foreign investment and bonded zone policies, and in terms of compliance, Section Chief Chen's side should be able to pass it."
Section Chief Chen Siyuan re-examined the joint venture architecture diagram from start to finish, checking item by item the cross-border legal applicability and regulatory approval nodes involved.
"From the perspective of company law, foreign investment law, and bonded zone regulatory regulations, there is no major problem with the compliance of this architecture.
A relatively critical point in terms of law is Singapore's domestic approval for technology export—Singapore's strategic goods control list includes semiconductor manufacturing equipment, and export requires an end-user certificate issued by Singapore Customs.
This point needs to be promoted and solved at the government level by the Singapore asset management authority.
In addition, the middle layer wholly foreign-owned enterprise enjoys the policy of exemption from customs duties and import value-added tax for imported self-use equipment in the bonded zone. After the equipment is installed and debugged in the bonded zone, exporting or domestic sales of finished wafer products through 'out-of-zone processing' both comply with customs regulatory requirements."
Section Chief Li Wenjie of the Investment Development Department pointed out the clauses regarding Engineer Liu Zhiping's team in the plan to Qi Tongwei.
"This part also needs to be finalized as soon as possible.
Engineer Liu Zhiping has confirmed that he will lead his team of more than 40 engineers to join the wafer fab project as a whole. Most of the core technical team members have more than ten years of wafer fab construction and operation experience at TSMC, covering a complete technology chain from process integration to yield improvement.
They will transfer from Kuala Lumpur to Jingzhou in batches after the project starts.
In addition, Professor Tian Zhaolin from Handong University will serve concurrently as the chief scientist of the wafer fab's materials laboratory, and two laboratories from the University of Science and Technology and the Posts and Telecommunications College will also cooperate in the matching research and development of photoresist and baseband chips."
"Regarding project site selection, the Provincial Planning Commission and the Jingzhou Municipal Government have preliminarily delineated three alternative plots, all within the coastal area of the Jingzhou Economic and Technological Development Zone."
Qi Tongwei stood up and walked to the planning map on the wall, pointing one by one with his finger at the plots marked with red circles.
"Plot No. 1 is close to the planned deep-water wharf of the Jingzhou Port, and large equipment can be shipped directly to the factory by sea, resulting in the lowest logistics costs; Plot No. 2 is close to the direct power supply line of the Electric Power Group's Qingshui Town Power Plant, ensuring the most stable industrial power supply; Plot No. 3 is next to the factory area of the joint venture between Guobao Electronics and Ericsson, offering the most mature industrial chain support.
Each has its advantages, and the final site selection will be decided after the joint expert group completes geological exploration and environmental impact assessment.
In terms of the manufacturing process of the production line, the technical path given by Engineer Liu Zhiping is to take two steps—the first phase will start production with a 0.35-micron process, utilizing the existing process modules transferred from Singapore to quickly enter the foundry market, with target customers being domestic home appliance and communication equipment enterprises;
the second phase, after the 0.35-micron production line operates stably, will launch independent research and development of the 0.25-micron process, utilizing Singapore's technology authorization and joint tackling by domestic universities to achieve a leap in process nodes."
"Minister Wang, the 1 billion US dollars from Provincial Investment Group will be in place in batches, and the first phase of 400 million will be allocated from the special account before the end of the year.
The matching RMB funds and the US dollar funds from Singapore and Guo Group will be in place synchronously at the same pace, and there will be no gap in the funding package."
Minister Wang Xiaoni nodded and noted down the time node for the first allocation in her notebook.
"At the national level, the Ministry of Information Industry and the State Planning Commission are also actively promoting it.
On the Singaporean side, once the Hong Kong Monetary Authority completes its final review, the official signing between all parties in the joint venture can be arranged.
The landing of the wafer fab project will completely change the landscape of China's semiconductor manufacturing—Shanghai Huahong, Shougang NEC, plus our factory, the 8-inch wafer foundry capacity in mainland China can form a tripartite confrontation."
Qi Tongwei put down his pen, glanced around at the several vice presidents and ministers present, "The wafer fab project is officially launched.
Next, a project preparation working group will be established, with me serving as the group leader, General Manager Hu Yunfeng serving as the executive deputy group leader, responsible for daily promotion and cross-departmental coordination;
Section Chief Li Wenjie of the Investment Development Department responsible for domestic approval and land planning docking;
Minister Wang Xiaoni of the Finance Department responsible for fund scheduling and foreign exchange management;
Section Chief Chen Siyuan of the Legal and Risk Control Department responsible for joint venture agreement review and cross-border legal affairs;
Li Fuchun of Great Wall Bank serving as the project financial advisor, Vice President He Dayong responsible for cross-border financing architecture design;
Ms. Gao Xiaoqin serving as the project strategic advisor, responsible for coordinating overseas resources.
The first plenary meeting of the preparation working group is scheduled for early November."
He leaned back in his chair, his gaze falling on the planning map on the wall, "What we are doing is not just a factory, but the future of China's semiconductor industry."
After the meeting, Qi Tongwei returned to his office.
Wang Jiliang was organizing and delivering the membership list of the preparation working group for the wafer fab project, and when putting down the document, he remarked, "Everyone is asking about the project's code name."
Qi Tongwei walked to the window. Outside the window, most of the parasol tree leaves on Huanghe Road had fallen. His gaze crossed the scaffolds under construction in the eastern suburbs of the provincial capital and fell on the open space by the sea further away.
"Let's call it 'Qiming'."
He wrote the project code name on the blank space of the cover of the preparation working group list.
When Wang Jiliang took back the document, he lowered his head and glanced at the vigor of those two words, then gently pulled the door shut and retreated.
