November 6, 1998, the ninth-floor conference room of Provincial Investment Building.
The first plenary meeting of the preparatory working group for the "Qiming" wafer fab project was held here.
The oval conference table was covered with dark green baize, and on the wall hung a freshly completed planning map of the coastal zone of the Jingzhou Economic and Technological Development Zone, with several candidate plots circled repeatedly in red, next to which were pasted preliminary conclusions of geological exploration and the outline of the environmental impact assessment.
Outside the window, most of the phoenix tree leaves on Huanghe Road had fallen, and the bare branches swayed gently in the autumn wind, but the heating in the conference room was turned on fully, and both sides of the long conference table were packed with people—on the side of the Provincial Investment Group, Qi Tongwei sat in the middle, with General Manager Hu Yunfeng, Vice President Zhang Xinquan, Minister Wang Xiaoni, Section Chief Li Wenjie, and Section Chief Chen Siyuan seated in order; on the side of Great Wall Bank, Li Fuchun had made a special trip from Hong Kong with He Dayong, sitting on the window side; Engineer Liu Zhiping had flown in from Kuala Lumpur and sat next to Li Fuchun, with a freshly printed technology import roadmap placed in front of him.
Qi Tongwei announced the start of the meeting and first asked each group to report on their progress.
General Manager Hu Yunfeng first reported on the approval status of the joint venture structure—the Provincial Planning Commission and the Economic and Trade Commission had officially approved the project initiation, and the Jingzhou Bonded Zone Management Committee had also confirmed the planning permit for the project land.
Minister Wang Xiaoni reported on the in-place status of the financial package—the 200 million US dollars from the Monetary Authority of Singapore and the 1 billion RMB matching funds from the State Planning Commission would be simultaneously in place before the end of the month; Elder Guo's 100 million US dollars had also been remitted from Malaysia.
Section Chief Li Wenjie reported on the project land and supporting facilities—geological exploration had been completed for the three candidate plots, among which Plot No. 1 near the Jingzhou Port deep-water wharf had the optimal conditions, allowing large equipment to be shipped directly to the factory by sea, which could save a huge amount of domestic land transportation costs.
Section Chief Chen Siyuan reported on the review of the joint venture agreement and cross-border legal compliance work—the overall framework had no principled obstacles, the three-tier structure had passed the compliance pre-audit of the Provincial Department of Foreign Trade and Economic Cooperation, and it was currently waiting for the final approval of the technology export license from the Singaporean government.
Li Fuchun opened the due diligence report prepared by Great Wall Bank—this report contained a complete set of designs for the capital contribution conditions of the Monetary Authority of Singapore, exchange rate hedging plans, as well as cross-border settlement and capital supervision.
He handed the report to General Manager Hu Yunfeng and then stood up.
"Chairman Qi, leaders, on behalf of Great Wall Bank, I would like to report on the progress of the financial advisory work.
The 200 million US dollar capital contribution from the Monetary Authority of Singapore involves the valuation issue of technical contributions as shares—there is a difference between the other party's technical valuation benchmark and the evaluation system we adopted, and the difference is about 30 million US dollars.
Both sides hold their own opinions, and it is still a tug-of-war at present.
In addition, the Singaporean government requires that the end-user certificate for the technology export license must clearly list the final use and installation location of each piece of equipment, but we haven't even finalized the factory drawings yet and cannot provide a detailed equipment list.
If these two problems are not solved, the joint venture agreement cannot be signed."
He Dayong pushed his glasses and took over the conversation. He had just flown in from Shanghai, and his suit still carried the wrinkles of the airplane seat.
"The valuation difference of the technical contribution is currently the biggest bottleneck, and there is an even more pressing problem—the 1 billion US dollar capital contribution promised by the Provincial Investment Group currently only has equivalent RMB funds on the books.
In 1998, foreign exchange management exercised very strict supervision over large-scale foreign exchange purchases and capital outflows under the capital account, especially concerning foreign-invested joint venture projects.
If we go through the routine foreign exchange purchase approval process, it requires step-by-step approval by the Provincial Foreign Exchange Bureau and the Peoples Bank of China, which will take at least two months at the fastest. Moreover, a scale of 1 billion US dollars is a quota that requires special approval in the foreign exchange administration bureau of any province in the country.
According to the current approval pace over in Singapore, once the equipment list and factory drawings are finalized, the foreign exchange should be in place synchronously, and the two-month time window cannot be met in any case."
Minister Wang Xiaoni also spoke up.
What she worried about most was the cost issue of large-scale capital precipitation, but what gave her even more headaches was the restriction of foreign exchange purchase quotas.
1 billion US dollars is equivalent to more than 8 billion RMB, and the foreign exchange purchase quota of the Provincial Investment Group in the bank is far from enough to cover this figure.
Even with special approval from the Provincial Foreign Exchange Bureau, it is still necessary to provide complete project approval documents and the joint venture contract from the Department of Foreign Trade and Economic Cooperation, and the joint venture contract is stuck in the negotiation of technical valuation.
This is a typical deadlock problem—no joint venture contract means no foreign exchange purchase quota, and no foreign exchange quota means no joint venture contract can be signed.
Section Chief Chen Siyuan took over the conversation, saying that the technology export license from the Singaporean side was still under approval and there were no substantial obstacles at the compliance level, but the preparation work for the end-user certification materials needed to be completed as soon as possible.
Engineer Liu Zhiping had not spoken all along, merely flipping through the joint venture architecture map in front of him.
The wrinkles at the corners of his eyes were deep, but his gaze was sharp. His dozen years of factory-building experience at TSMC made him immune to financial topics—he had seen too many projects aborted halfway due to the disconnection between finance and technology, so he had been waiting for those few words he most wanted to hear.
Until He Dayong mentioned the approval cycle for large foreign exchange purchases, did he speak up. His voice was not loud, but every word was as firm as when accepting equipment in the workshop.
"I don't understand financial matters; I only talk about technology.
The 0.35-micron process module that Singapore can transfer is a mature platform with low production risks, but yield ramp-up takes time.
The real problem lies in Phase II—for the core process of the 0.25-micron process node, Singapore also lacks complete independent intellectual property rights, and the patents for some modules are in the hands of IBM and Toshiba.
If we cannot obtain at least cross-licensing in advance, the production of Phase II will still be choked by others.
When I was in Kuala Lumpur, I kept reminding Elder Guo, and now I remind everyone as well—technology import cannot look only at the equipment list, but even more so at the patent list."
Li Fuchun quickly took over the conversation.
"For the difference part of the technical valuation, a valuation bet clause can be designed.
The initial period will be recorded based on the valuation of the Monetary Authority of Singapore, and the difference part will be used as a technical performance bet—if the yield of the initial 0.35-micron production line reaches the standard on schedule after production, the difference part will be made up by the Provincial Investment Group in the form of cash or equity; if it fails to reach the standard, the valuation of the Singaporean side will be correspondingly adjusted downwards.
In this way, the dispute over technical valuation can be resolved, and at the same time, Singapore's technical commitments can be bound to the actual output of the project."
"Regarding the issue of the 1 billion US dollar foreign exchange capital contribution from the Provincial Investment Group, I propose a plan."
Qi Tongwei put down his pen, moved his gaze from Li Fuchun to He Dayong, and then swept across Minister Wang Xiaoni. "The Provincial Investment Group currently does not have 1 billion US dollars in foreign exchange, but the Provincial Investment Group can avoid outputting foreign exchange.
The Provincial Investment Group contributes with equivalent RMB assets, entering the domestic account of the joint venture company, which is used for civil engineering, domestic supporting equipment, and personnel compensation—this part of the expenses originally requires RMB, and the 1 billion RMB special fund matched by the State Planning Commission is the same.
The foreign exchange part required for equipment procurement will be uniformly resolved by the Hong Kong joint venture holding platform."
"How will the 1 billion US dollars of the Hong Kong holding platform be resolved?" Minister Wang Xiaoni asked closely.
"The market value of Microsoft and Cisco shares held by Great Wall Investment in HSBC and Citigroup exceeds 2 billion US dollars.
With stock pledge guarantee provided by Great Wall Investment, Bank of China provides a loan equivalent to 1 billion US dollars to the Hong Kong joint venture holding platform.
The funds are directly injected into the joint venture platform and are exclusively used for the procurement of core equipment for the wafer fab.
The Provincial Investment Group does not need to purchase foreign exchange; it only needs to repay Bank of China in equivalent RMB when the loan matures."
Li Fuchun quickly took over the conversation and outlined a triangular-structured sketch in his notebook—Great Wall Investment pledged Microsoft and Cisco shares in Hong Kong, Bank of China issued a US dollar loan to the joint venture holding platform, and the Provincial Investment Group repaid in RMB domestically.
The entire process does not involve direct foreign exchange purchases by the Provincial Investment Group, perfectly circumventing the capital project approval bottleneck of the Foreign Exchange Bureau.
He also pointed out that the guarantee multiple of the stock pledge can be controlled above two times, which Bank of China can completely accept.
He Dayong quickly calculated several sets of numbers in his notebook, and when he looked up, there was an added sense of certainty in his gaze behind his lenses.
He added that the loan term of Bank of China can be designed as three years, matching the initial construction cycle of the wafer fab.
The interest rate is executed at the offshore market LIBOR plus 50 basis points, and the stock pledge guarantee of Great Wall Investment can ensure the optimal interest rate.
Regarding the repayment method, the Provincial Investment Group repays the principal and interest of the loan in equivalent RMB annually, and the funds are completed through the cross-border settlement channel of Great Wall Bank Hong Kong.
The entire plan does not involve foreign exchange quota approval, but only involves the compliance of cross-border RMB repayment—and under the current foreign exchange management framework, as long as there is a true trade background and project approval documents, this is entirely operable.
"This plan has another advantage—the financing cost is lower than direct foreign exchange purchases by the Provincial Investment Group."
Li Fuchun opened his laptop and reported the data he had just calculated—the loan interest rate of Bank of China is LIBOR plus 50 basis points, which is significantly lower than the interest rate level of US dollar loans from domestic banks.
If the Provincial Investment Group directly purchases foreign exchange from domestic banks and then lends US dollars, the interest rate will at least double. Calculated on a three-year basis, the total financing cost will be tens of millions of dollars higher.
Moreover, the Provincial Investment Group does not need to lock in a 1 billion US dollar foreign exchange exposure at one time. When repaying in RMB annually, it settles at the spot exchange rate, and it can also enjoy the exchange rate dividend of the future appreciation of RMB.
"The funding issue is settled like this.
On the side of Great Wall Investment, Ms. Gao Xiaoqin will coordinate the stock pledge and the docking with Bank of China, Comrade He Dayong will be responsible for the specific clause design of the loan agreement, and Comrade Li Fuchun will dock with the Provincial Foreign Exchange Bureau to confirm the compliance filing process for cross-border RMB repayment.
As for Bank of China, I will personally handle the coordination with President Liu."
Qi Tongwei closed his notebook and re-integrated everyone's opinions. "The problems raised by everyone just now boil down to three aspects—progress, funds, and technology.
The problem of progress is that the Singaporean side is stuck on the end-user certificate, which ultimately means waiting for our factory site to be finalized.
The problem of funds has been solved just now—the Provincial Investment Group contributes with RMB for domestic expenses, and the foreign exchange equipment procurement is resolved through the guarantee of Great Wall Investment and the loan of Bank of China. The Provincial Investment Group does not need to purchase foreign exchange, nor does it need to go abroad.
The problem of technology is solved by the valuation bet clause proposed by Comrade Li Fuchun—the initial period is recorded based on the Singaporean side's valuation, and the difference part is used as a technical performance bet, binding Singapore's technical commitments to the actual output of the project.
The solutions to these three matters ultimately point to the same train of thought—using interest binding to promote the coordination of all parties."
He opened his notebook and broke down the tasks one by one.
"Next, Comrade Zhang Xinquan will dock with the Provincial Department of Foreign Trade and Economic Cooperation to include the wafer fab project in the green channel for provincial key foreign-invested projects and strive for priority processing of joint venture approvals;
Comrade Hu Yunfeng will coordinate the Jingzhou Municipal Government to accelerate the formal approval of the project site selection plot and infrastructure construction (seven connections and one leveling);
Engineer Liu Zhiping, please continue to lead the team to complete the refinement of the equipment list, and ensure that after the factory design drawings are finally finalized, the final use description materials of each piece of equipment can be submitted to the Singaporean side at the first time;
Comrade Li Fuchun and Comrade He Dayong will be responsible for the refinement of the valuation bet clause for the technical valuation difference, as well as the design of the stock pledge loan agreement;
Comrade Wang Xiaoni will be responsible for the domestic fund dispatch of the RMB capital contribution of the Provincial Investment Group, and cooperate with Comrade Li Fuchun to dock the compliance filing of cross-border repayment."
The preparatory working group immediately determined the schedule for the next stage:
Complete the official approval of project land and site selection confirmation before November 20, and simultaneously complete the signing of the stock pledge loan agreement and the compliance filing of cross-border repayment;
Complete the refinement of the equipment list and submit it to the Singaporean government before November 25;
Complete the final draft of the technology transfer agreement and the signing of the joint venture agreement before December 5;
All funds will be fully in place and industrial and commercial registration will be completed before December 10.
He leaned back in his chair, his gaze falling on the planning map on the wall.
"Three months ago, this project was just a trust entrusted by Elder Guo over the phone.
Three months later, the financial package has been closed, the technological path has been clarified, and the joint venture structure has been built.
Today's meeting solved not just a few specific problems, but through our joint efforts, cleared the final obstacles for this project before its landing.
Next, we will perform our respective duties, push forward separately, and officially break ground on the wafer fab before the end of the year."
After the meeting, General Manager Hu Yunfeng and Vice President Zhang Xinquan went to the Provincial Department of Foreign Trade and Economic Cooperation and the Jingzhou Municipal Government respectively for docking, while Engineer Liu Zhiping stayed in the conference room to continue discussing the equipment list with Li Fuchun.
Qi Tongwei returned to his office, and Luo Xiaopeng was already waiting for him.
The restructuring work of Lincheng Coal Industry Group had been fully completed, and the asset verification had just come to an end.
That thick asset verification report was placed on the desk. Luo Xiaopeng turned to the last page and reported the key data to Qi Tongwei—the total assets of Lincheng Coal Industry were about 5.3 billion RMB, which was five times the total assets of Yantai Coal Industry of 1.06 billion RMB; the coal reserves were about 1.58 billion tons, which was more than ten times the reserves of Yantai Coal Industry of 150 million tons, among which the reserves of high-quality coking coal accounted for nearly 70% of the province.
As the Lincheng corruption case settled down, several private mines involved in the case were nationalized, and subsequent safety rectification and technological transformation investments were also in place.
"I suggest taking Lincheng Coal Industry and Yantai Coal Industry as the foundation to establish Handong Coal Industry Group, with the headquarters remaining in Lincheng unchanged.
After the merger, you will be the chairman and general manager, Song Guoping will serve as the deputy general manager in charge of production, Zhao Ruilong will serve as the deputy general manager in charge of logistics, and Chen Ruolin will be chosen as the head of the Finance Department—her performance in the asset divestment of Guobao Electronics and the asset verification of Lincheng Coal Industry was very solid, and it is time for her to stand on her own.
After you go back, dock with Yantai Coal Industry as soon as possible, form the establishment plan of Handong Coal Industry Group, and report it to the executive meeting of the Provincial Investment Group for approval."
Luo Xiaopeng acknowledged and wrote it down, closed his notebook, and left the office.
Qi Tongwei picked up the telephone on the desk and dialed Chairman Li Xueli's number.
Ten minutes later, Chairman Li Xueli pushed open the door of Qi Tongwei's office, holding the operation report of each power plant of the Electric Power Group from last month.
Qi Tongwei asked her to sit on the sofa first, handed her the asset verification report of Lincheng Coal Industry left by Luo Xiaopeng just now, and briefly explained his idea of establishing Handong Coal Industry Group and promoting coal-electricity integration.
The annual coal demand of the five power plants of the Electric Power Group is over 8 million tons. If the annual production capacity of the coal industry group can reach the level of 10 million tons, the synergistic benefits of coal-electricity integration will be very considerable.
He suggested that Chairman Li Xueli and Luo Xiaopeng dock as soon as possible, starting from long-term contract pilots and gradually advancing toward deeper integration—unified negotiation of coal procurement, sharing of transportation logistics, and a coal-electricity price linkage mechanism, with the ultimate goal of achieving integrated coal-electricity operation.
Chairman Li Xueli took the asset verification report, flipped through two pages, and nodded slightly when she heard about the coal-electricity price linkage mechanism.