The Second Brother's face darkened.

"I didn't sign it."

"It's good that you didn't sign it."

"Can you not remind me every time?"

"To prevent you from signing next time."

Eldest Sister Wu chuckled on the side.

The stiffness between the siblings that had lasted for more than ten days also eased a bit because of this sentence.

On the twenty-fifth day, the internal first draft of the environmental impact assessment report was formed.

The document exceeded six hundred pages.

The appendices did not yet include the complete original public opinions.

When Engineer Cai handed the electronic version to Lin Feng, they deliberately emphasized.

"The first draft is not the final conclusion. You cannot screenshot a single page and tell the outside world that the project has passed the environmental impact assessment."

"Understood."

"Especially the abstract part, there are still seventeen places that need modification."

"Understood."

"The public participation statement must be compiled separately."

"Understood."

Engineer Cai paused for a moment.

"Do the people here all like to say 'understood'?"

Su Xiaoli walked past.

"He only knows how to say this."

Lin Feng opened the report.

"There is something else."

"For example?"

"A fried egg."

Engineer Cai didn't understand.

Su Xiaoli was expressionless.

"Internal cost control terminology."

The report preliminarily judged that after implementing measures such as route adjustments, ecological culverts, soil and water protection during the construction period, noise control, light spill limits, soil risk disposal, and long-term monitoring, the project's environmental impacts could further enter the review and argumentation stage.

It is not "no impact".

Nor is it "absolute safety".

The remaining issues listed in the report include the protection of shallow puddles during the construction period, coordinated approval of energy lines, final confirmation of noise measures for some residents, and the refinement of wetland replenishment monitoring indicators.

Lin Feng did not ask for the conclusion to be written more affirmatively.

He first turned to the public opinion processing form.

A total of 479 valid opinions were included.

Among them, 186 were templated opinions; all original records were retained and categorized into wetland protection issues according to core demands.

There were 213 specific opinions formed through symposiums, phone calls, and field visits.

Eighty-seven items have been adopted.

Sixty-four items were partially adopted.

Twenty-nine items need to be handled during the operation phase.

Thirty-three items were not adopted or currently cannot be adopted.

There is a reason behind every single item.

"Requesting that the logistics corridor completely ban nighttime freight transport."

Not adopted.

The reason is that the logistics function dictates that nighttime freight cannot be completely cancelled, but the impact is controlled through speed limits, bans on honking, zonal dispatching, and noise reduction at sensitive points.

"Requesting all affected villagers to receive a free residence in Donghai New City."

This does not belong to environmental impact control measures and lacks policy basis, so it is not adopted.

"Requesting the protection of seasonal shallow puddles."

Adopted.

Cancel the temporary material storage yard and set up an ecological buffer.

"Requesting the publication of precise nest locations of all birds."

Not adopted.

Relevant information will be provided to regulatory and professional institutions, and sensitive coordinates will be hidden in public materials.

"Requesting continuous disclosure of noise and water level monitoring trends after construction."

Partially adopted.

Long-term trends will be released according to the scope of public disclosure by law, and data involving specific locations of households will be anonymized.

Lin Feng looked through them one by one.

By the time he looked at the end, it was already eleven o'clock at night.

Su Xiaoli pushed the door open and placed a bowl of clear noodle soup on the desk.

"The last bowl before the cafeteria's nighttime window closes."

"What about the fried egg?"

"Two."

Lin Feng looked up.

"Why?"

"The completion of the first draft of the environmental impact assessment report belongs to a phased milestone."

"It hasn't been submitted yet."

"Two have already been fried and cannot be returned."

"They can be given to A-Wang."

A-Wang outside the door immediately poked his head in.

Su Xiaoli pushed the bowl a little bit closer to Lin Feng.

"He has already eaten the employee meal tonight."

"Then you eat one."

"I have also eaten."

"Waste is not good."

"So you eat."

Lin Feng looked at the two fried eggs on the noodles.

"Budget overrun."

"Deduct it from the meal subsidy of the chief operations officer."

"That works."

Su Xiaoli sat down opposite him.

"Can't you be polite for once?"

"You have already decided."

"My deciding is my business, and you being polite is your business."

"Thank you."

"Too late."

"The eggs haven't cooled down."

"Lin Feng."

"Hmm?"

"Eat your noodles."

On the twenty-seventh day, the lighting sample section test was held on the old road on the east side.

Six temporary light poles were erected according to the design height.

Ordinary road lights, logistics node operation lights, and light shields in the direction of the wetland were activated respectively.

The test invited villagers from Dongqiao Village, residents on the north side, photography enthusiasts, and ecological survey personnel.

No live media broadcast was arranged at the scene.

However, participants were allowed to take photos of areas not involving sensitive ecological points on their own.

After the first version of the lighting fixtures was turned on, the illuminance in the direction of the wetland was still higher than the design target.

The reason was not the main lights.

Instead, it was a lateral fill light of a vehicle security check shed.

The equipment supplier thought the impact was very small.

The photography enthusiasts directly set up their cameras.

"It feels small to the naked eye, but it's very obvious with a long exposure."

The lighting engineer readjusted the shading angle and lowered the height of the fill light.

In the second round of testing, the halo in the direction of the wetland noticeably weakened, but local shadows appeared in the security check area.

After security personnel walked in to test, they pointed out that the shadows would affect the inspection of the bottom of trucks.

The final scheme was changed to low-level directional fill lighting, no longer illuminating horizontally from a high place.

"With an extra set of lighting fixtures, maintenance costs will increase." Han Ze reminded out of habit.

"Put it on the tab," Lin Feng said.

"My head hurts just hearing those two words now."

"Put the medical expenses on the tab too."

Han Ze glanced at him.

"Thank you very much."

When the lighting test ended, a little girl tugged at Su Xiaoli's hem.

"Can we still see the stars here in the future?"

Su Xiaoli looked up.

Outside the temporary light poles, plenty of starlight could still be seen in the eastern sky.

"It will be a little brighter than now."

"Does that mean we won't be able to see them?"

"Some dim stars might be harder to see. Therefore, lights cannot be shone randomly, and unnecessary lights must be turned off by zones at night."

"Can they all be turned off?"

"Trucks still need to travel, so they can't all be turned off."

The girl was somewhat disappointed.

Her father stroked her head.

"We can't just let drivers drive in the dark."

The girl thought for a moment.

"Then leave one side for the stars."

This sentence was recorded into the lighting test opinions.

Not because it could be directly converted into technical parameters.

But because it was accurate enough.

Giving the light needed for nighttime safety.

And also leaving a direction for the darkness.

On the twenty-ninth day, the environmental impact assessment public announcement was about to end.

The opinion window at the Service Center was much quieter than at the beginning.

It wasn't that there were no questions.

Rather, most of the high-frequency questions already had public answers.

On the morning of the last day, an elderly man wearing a straw hat came to the window and handed in a handwritten opinion.

The handwriting was slow and not very neat.

"I don't oppose building the road, nor do I say I support it. I hope you won't block the ditch during construction. Two years ago when it rained heavily, the water went through that ditch. There are two willow trees by the ditch; the trees can be moved, but the water cannot be blocked."

When registering, the staff member asked for the specific location.

The elderly man did not know how to use an electronic map.

He took out a map he had drawn himself.

Marked on the map were a well, an abandoned pigpen, and two willow trees.

Luo Qingping took him to check on-site.

That ditch was not on the existing major water system map.

It was only a little over a meter wide, dry most of the time, and covered by weeds. Judging from the terrain, however, it happened to connect two low-lying farmland plots.

During heavy rainstorms, it might undertake a temporary overflow function.

The hydrology team immediately re-measured the elevation.

The system's regional hydrological simulation auxiliary authority simultaneously provided internal reference.

Under extreme rainfall, if the construction access road pressed over this ditch, the water accumulation time in the surrounding thirteen mu of farmland might be extended by six to nine hours.

The formal model was subsequently reviewed by a real-world agency, and the results were close to the system reference.

Therefore, a temporary culvert was added to the construction organization diagram.

The cost was not high.

180,000 yuan.

Compared to the adjustments on this road that easily cost tens of millions or hundreds of millions, it was almost negligible.

Yet if the old man hadn't brought that map on the last day of the public announcement, it probably wouldn't have been discovered until construction caused water accumulation.

After confirming the adjustment plan, the old man did not leave his name for public release.

He only said one sentence.

"The ditch has no name, but the water knows the way."

This sentence was written into Su Xiaoli's work log for that day.

It was not posted on the official account for emotional appeal.

It was only put into the project's internal water system investigation description.

At twelve o'clock at night, the thirty-day first environmental impact assessment public participation announcement ended.

The online submission channel closed this stage's entry according to procedures.

Ordinary consultation channels were still retained.

Xu Mingchuans Team completed the final round of data verification.

A total of 527 public opinions were received.

Statutory public announcement material review records reached 319 person-times.

Field visits involved 92 households in Dongqiao Village.

Land status confirmation was completed for 89 households.

Three households still had ownership or boundary disputes, and the project was not forcibly concluded.

The project route and construction organization experienced a cumulative total of 27 adjustments.

The expected additional cost is 1.96 billion yuan.