Han Ze saw the final numbers and remained silent for a long time.

"This is still just preliminary optimization."

"Mmm."

"If we had chosen the straight low-cost plan initially, we could have saved at least three billion."

"Mmm."

"Don't you have anything else to say?"

"Keep the accounts clear."

Han Ze took a deep breath.

"Tomorrow I'm applying for a transfer to the cafeteria to manage frying eggs."

"Sure."

"Really?"

"Pass the chef's certificate first."

Su Xiaoli sat nearby, lowering her head and laughing for a long time.

The EIA agency began compiling the public participation description and revised report.

The land survey continued to handle the remaining three households' issues.

The project was not approved immediately just because the public notice ended.

No construction machinery appeared on the eastern wasteland either.

The next morning, the homepage of the public transparency page was updated.

"The first stage of public participation for the environmental impact assessment has concluded. What has ended is this stage's public notice, not the public's right to expression. Subsequent report reviews, notices, and related statutory procedures will continue to be promoted in accordance with the law."

Below is the processing overview.

Approval ratings are not displayed.

Emotional voting is not done.

It only shows how many issues were received, how many were adopted, what was adjusted, and what remains unresolved.

The ownership confirmation for the Wu siblings still shows yellow.

The acoustic environment measures outside the He Nursing Home show "Plan preliminarily confirmed, pending subsequent agreement and review".

The seasonal shallow puddles show "Temporary construction land has been avoided".

The old brick factory boiler room area shows "Soil risk disposal plan pending review".

The nameless drainage ditch in Dongqiao Village shows "Construction period water passage measures have been supplemented".

In the afternoon, the EIA report and public participation description were officially submitted to the review platform.

A total of 496 files were uploaded.

This was more than during the previous technical correction.

The progress bar reached 97 percent and stopped for three minutes.

Su Xiaoli stared at the screen.

"Don't tell me another large file failed."

Xu Mingchuan glanced at the backend.

"The bird survey video attachment is undergoing integrity verification."

"Can we just delete the duplicate photos?"

"No."

"I was just asking."

"Every time you say you're just asking, you usually want to rush."

"I am the operations director, urging progress is my job."

"Verification does not accept being rushed."

Lin Feng sat in the back flipping through the land survey forms.

"Let it run."

"You're certainly not in a rush," Su Xiaoli said.

"Being in a rush won't make it faster."

"Yesterday, when the cafeteria fried eggs were three minutes late, you looked at the window twice."

"That is a human process."

"Uploading is also a system made by humans."

"Now it's machine verification."

"You're more lenient with machines than with people."

"Machines don't make excuses."

Xu Mingchuan looked up.

"They throw errors."

As soon as the words fell, a red prompt popped up on the screen.

An image index was inconsistent.

Su Xiaoli slowly turned her head to look at Lin Feng.

Lin Feng was silent for two seconds.

"Machines make excuses too."

Laughter erupted throughout the office.

The issue was quickly investigated and cleared up.

When a photo was re-exported after desensitizing its precise coordinates, the file verification value changed, and the index table was not updated synchronously.

Xu Mingchuans Team regenerated the records.

They did not forcibly overwrite them with the old verification values.

The second upload was successfully completed.

At 4:07 in the afternoon, the platform status updated.

【Environmental impact assessment report received】

【Public participation description received】

【Current status: Formal review in progress】

No one applauded.

Su Xiaoli first screenshotted the status and sent it to the work group.

Luo Qingping forwarded it to Dongqiao Village.

Liang Qiming notified the design team to temporarily freeze the key drawing versions and wait for the formal review comments.

Han Ze split the 1.96 billion yuan in new costs into the project budget risk items.

Engineer Cai sent a single sentence.

"Receipt is not acceptance, acceptance is not approval."

Su Xiaoli replied with three words.

"We all know."

The system panel subsequently unfolded before Lin Feng's eyes.

【City meridian main task progress update】

【East logistics corridor technical review: Stage passed】

【Environmental impact assessment: Submitted, pending formal review】

【Public participation stage one: Completed】

【Land status survey: Ninety-six percent】

【Formal compensation agreement: Unsigned】

【Energy center grid-connection review: Plan deepening】

【Territory boundary expansion status: Ineffective】

【Reality approval completion: Forty-three percent】

【Prohibited from starting construction within boundaries at the current stage】

【City credit stability: Increased】

【City resilience index: Increased】

【City listening degree: Increased】

【Reminder: The report being received does not mean the environmental impact assessment has passed】

Lin Feng closed the panel.

Forty-three percent.

Fifteen percent more than the twenty-eight percent from a month ago.

These fifteen percent did not come from the System Engineering Team.

They came from an unnamed drainage ditch drawn on paper by an elderly person, from a photo of a fledgling bird taken two years ago, from the winter sunlight blocked by a three-meter sound barrier, and from the land status forms of three households that had still not been forced to sign.

That night, the system completed its settlement.

The Restaurant, Commercial Street, Industrial Park, transportation hub, Hotel, community life, and the trust emotions continuously accumulated over the past month generated a total of over 680,000 prosperity points.

The balance had returned to over fourteen million.

The construction options for the energy center, storm-flood retention module, logistics nodes, and shared road corridors were all lit up.

The system even prompted that the current prosperity points were enough to materialize most of the main structure of the logistics corridor all at once.

Lin Feng did not click.

The boundary was not active.

The EIA had not passed.

The compensation agreements were not signed.

Building it now would only turn the thirty-day public notice, over five hundred opinions, and the materials confirmed household by household into a joke.

He exited the construction list and opened the store's daily page.

Among today's limited items was a set of "Low-disturbance construction noise reduction module".

Priced at 120,000 prosperity points.

It could reduce construction period mechanical noise by forty percent and reduce fugitive dust by fifty percent.

The usage conditions were written very clearly.

It must be installed on compliant projects that have obtained actual commencement permits.

Lin Feng bought it first and put it into the system warehouse.

He could buy it.

He could not install it.

These two matters did not conflict.

The next morning, the formal review feedback came faster than expected.

The platform requested five supplementary materials.

First, further clarify the responsibility boundaries for local soil risk disposal at the old brick factory.

Second, supplement the ecological value judgments of seasonal shallow puddles under different hydrological years.

Third, clarify the management entity and long-term maintenance funding for phased road lighting control.

Fourth, improve the specific thresholds and procedures for triggering rectification through noise tracking and monitoring.

Fifth, the public participation description needs to individually list the synthesis basis for templated opinions to avoid being misunderstood as batch exclusion.

After reading them, Su Xiaoli posted the five requirements as they were onto the public page.

Someone asked in the comment section.

"Does supplementing materials mean the EIA didn't pass?"

The official reply came.

"Yes. It hasn't passed currently and is being supplemented."

Someone else asked.

"Does the project have serious problems?"

The official reply came.

"Supplementary requirements raised during the formal review do not equal an determination of serious environmental problems, nor do they mean it will definitely pass in the end. Subject to subsequent review conclusions."

A third person asked.

"So is this good news or bad news?"

Qiu Yun sat behind the information desk, thinking for a long time.

She finally replied.

"It's news that we need to keep working."

This reply unexpectedly received a lot of likes.